Attachment 22 - Seed Project AF Form 66.pdf

PDF 93 KB Posted

Attached to
Hazardous Materials Abatement Contract - IDIQ
Solicitation number
FA500023B0003
Issued by

About this file

This document is the AF Form 66, which is a Schedule of Material Submittals for a federal contract opportunity to repair a hazardous materials survey facility. The contract opportunity is related to Solicitation Number FA500023B0003 for a Hazardous Materials Abatement Contract - IDIQ with a broad range of work to prepare remediation plans and abatement strategies.

The AF Form 66 lists various submittals required from the contractor, including the construction schedule, QA/QC plan, safety plan, hazardous materials disposal reports, and other documentation. The required submission dates and approvals are tracked. The seed project for this IDIQ contract is valued between $25,000 and $100,000. This requirement is a 100% small business set-aside.

View the file

Other files

File Type Posted
Abstract.pdf PDF
Solicitation Amendment FA500024B00030002.pdf PDF
Attachment 25 - Questions and Answers.pdf PDF
Solicitation Amendment FA500024B00030001 SF 30.pdf PDF
Solicitation - FA500024B0003.pdf PDF
Attachment 2_AF IMT 3000_2003091_VI_ Submittal.pdf PDF
Attachment 6_Dig Permit Custom Map Elmendorf.pdf PDF
Attachment 8_Dig Permit Fillable Template_ 673ABW Form 3_20200423_Prescribed by 673ABWI32_1007.pdf PDF
Attachment 9_JBER IFS Vol 1 Elmendorf_31 January 2019.pdf PDF
Attachment 10_JBER IFS Vol 2 Richardson_14 February 2019.pdf PDF
Attachment 14_JBER Hazardous Waste Management Plan - 2024.pdf PDF
Attachment 17_Wage Determination_AK20240001 02_23_2024.pdf PDF
Attachment 20 - Seed Project As-builts.pdf PDF
Attachment 4_AF IMT 3065_199600401_VI_Progress Report.pdf PDF
Attachment 7_Dig Permit Custom Map Richardson.pdf PDF
Attachment 16_JBER Integrated Hazardous Material Plan 25 Oct 2020.pdf PDF
Attachment 21 - Seed Project Price Schedule.pdf PDF
Attachment 23 - Seed Project Location map.pdf PDF
Attachment 24 - FOPR Seed Project FXSB 24-1008.pdf PDF
Attachment 19 - Seed Project SOW.pdf PDF
Attachment 1_HMAC _Dated 12 Dec 2023 SOW.pdf PDF
Attachment 3_AF IMT 3064_2003091_VI_Progress Schedule.pdf PDF
Attachment 5_Contractors Fire Safety Guide_Rev 14_14 September 2017.pdf PDF
Attachment 11_JBER CAD GIS Record Drawing As- Built Standard_Dec 2019.pdf PDF
Attachment 12_Environmental Precon Checklist_Updated Sep 19.pdf PDF
Attachment 13_JBER 1500_1600 Environmental Protection and Solid Waste Management Specs 26 Jul 23.pdf PDF
Attachment 15_JBER Telecom Criteria Requirements_ February 11 2021.pdf PDF
Attachment 18_Service Contract Act_Dec25_2023-Revision 19.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LI

N

E N

U M

B ER Note: Government will retain all submittals. Provide an electronic copy for each submittal.

C

ER

TI

F.

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

TU

R

U R

'S R

EC

O

M M

EN

D

AT

IO

N

C

AT

AL

O

G D

AT

A

O &M

R

EC

O M

M

EN

D

AT

IO

N

S

C

AL

C U

LA

TI

O N

S

W

AR

R

AN

TY

D R

AW

IN

G S

R

EP

O R

T

TE

ST

R

ES

U

LT

S

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E

TO

C O

N

TR

AC

TI

N G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

AP

PR

O

VE

D

D

IS

AP

PR

O

VE

D

C O

N

TR

AC

TO

R S

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

GENERAL

1 Project Specific Form 66 X NTP + 10

2 Construction Schedule (AF IMT 3064) X NTP + 10

3 Project Specific Specifications X NTP + 10

4 Contractor's QA/QC Plan X NTP + 14

5 Contractor's Environment Plan X NTP + 14

6 Contractor's Safety Plan X NTP + 14

7 Contractor's Health Plan X NTP + 14

8 Written Hazard Communication Program X NTP + 14

9 HazMat Disposal Reports per Environmental Protection Specifications on JBER X NTP + 14

Submit all notifications to the Alaska Occupational Safety and Health (AKOSH) and EPA Region 10 that are mandatory before starting any asbestos work.

before start work

11 Asbestos abatement plan X NTP + 14

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT NUMBER PROJECT NAME SOLICITATION /CONTRACT NUMBER

FXSB 24-1008 Repair Hazmat survey B31550

AF FORM 66

E N

U M

B ER Note: Government will retain all submittals. Provide an electronic copy for each submittal.

C

ER

TI

F.

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

TU

R

U R

'S R

EC

O

M M

EN

D

AT

IO

N

C

AT

AL

O

G D

AT

A

O &M

R

EC

O M

M

EN

D

AT

IO

N

S

C

AL

C U

LA

TI

O N

S

W

AR

R

AN

TY

D R

AW

IN

G S

R

EP

O R

T

TE

ST

R

ES

U

LT

S

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E

TO

C O

N

TR

AC

TI

N G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

AP

PR

O

VE

D

D

IS

AP

PR

O

VE

D

C O

N

TR

AC

TO

R S

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT NUMBER PROJECT NAME SOLICITATION /CONTRACT NUMBER

FXSB 24-1008 Repair Hazmat survey B31550

12 Medical Certification X NTP + 14

13 Landfill Approval X NTP + 14

14 Hazardous material Sampling and analysis plan and schedule. X NTP + 14

15 Hazard Material List with Safety Data Sheets (SDSs) X

14 days Prior to bringing any materials on base.

16 Accumulation point daily and weekly inspection summary sheets X

Once per week after issue of Starting Work on Order

17 Name, phone number and experience resume of the Emergency Coordinator X

Once per week after issue of Starting Work on Order

18 Record of Training for Contractor Employees X NTP + 14

19 Testing Laboratory X NTP + 21

20 Daily Reports X

24 hrs after issue of

Starting Work on Order

21 Copy of all Signed Landfill Disposal Records X 7 days Prior to final inspection

E N

U M

B ER Note: Government will retain all submittals. Provide an electronic copy for each submittal.

C

ER

TI

F.

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

TU

R

U R

'S R

EC

O

M M

EN

D

AT

IO

N

C

AT

AL

O

G D

AT

A

O &M

R

EC

O M

M

EN

D

AT

IO

N

S

C

AL

C U

LA

TI

O N

S

W

AR

R

AN

TY

D R

AW

IN

G S

R

EP

O R

T

TE

ST

R

ES

U

LT

S

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E

TO

C O

N

TR

AC

TI

N G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

AP

PR

O

VE

D

D

IS

AP

PR

O

VE

D

C O

N

TR

AC

TO

R S

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT NUMBER PROJECT NAME SOLICITATION /CONTRACT NUMBER

FXSB 24-1008 Repair Hazmat survey B31550

22 Final Hazmat Survey Report 7 days Prior to final inspection

23 Final Remediation/ Abatement plan 7 days Prior to final inspection

AF_66