This document is a Fair Opportunity Proposal Request (FOPR) for a Seed Project - FXSB 24-1008 to repair Hazmat Survey B31550 at Joint Base Elmendorf-Richardson, Alaska. The project has a construction magnitude between $25,000 and $100,000 and a 180-calendar day performance period. The contractor shall provide all design, parts, labor, equipment, supplies, and materials to complete the project. A bid bond guarantee is required. The applicable Service Contract Act wage determination is attached. Questions can be directed to the listed contracting personnel.
The related federal contract opportunity is for an Indefinite Delivery/Indefinite Quantity (IDIQ) Hazardous Materials Abatement Contract, with a total contract value between $5,000,000 and $10,000,000. This requirement is a 100% small business set-aside. The seed project under this IDIQ has a construction magnitude between $25,000 and $100,000. Questions on this solicitation must be submitted by 22 May 2024.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
673D CONTRACTING SQUADRON
JOINT BASE ELMENDORF-RICHARDSON, ALASKA
8 April 2024
MEMORANDUM FOR INTERESTED CONTRACTORS
FROM: 673d Contracting Squadron/PKA
10480 Sijan Ave.
JBER, AK 99506
SUBJECT: Fair Opportunity Proposal Request (FOPR), Seed Project - FXSB 24-1008 Repair Hazmat
Survey B31550, JBER, AK 99506
1. This is a FOPR for subject project to be awarded on a fair opportunity basis pursuant to Federal
Acquisition Regulation (FAR) 14.5 two-step sealed bidding procedures and the specific requirements outlined in this request with attachments.
2. The Contractor shall furnish all design, parts, labor, equipment, supplies, materials, appliances, transportation, and perform all work (including work of an incidental nature), complete, in strict accordance with the scope of work, drawings and subject to the terms and conditions of the contract.
3. The subject project’s “Magnitude of Construction” in accordance with FAR 36.204(b) is between
$25,000 and $100,000.
4. The total performance period for this project is 180 calendar days after the issuance of the Notice to
Proceed (NTP). This performance period includes administrative time, submittal time, material ordering time, and physical construction time.
5. A bid bond guarantee is required with this project IAW FAR 52.228-1.
6. Recovered material product information is published at https://www.epa.gov/smm/comprehensive-procurement-guidelines-construction-products and http://www.energystar.gov/products.
7. The Department of Labor service contract act wage determination applicable to this requirement is attached to this FOPR.
8. Please contact Brian Barcelona at Brian.Barcelona@us.af.mil, 907-552-5649 and Christopher
Nelson at Christopher.Nelson.70@us.af.mil, 907-552-7168 if you have any questions.
BRIAN. BARCELONA, NH-04, DAF
Contracting Officer https://www.epa.gov/smm/comprehensive-procurement-guidelines-construction-products https://www.epa.gov/smm/comprehensive-procurement-guidelines-construction-products http://www.energystar.gov/products mailto:Brian.Barcelona@us.af.mil mailto:Christopher.Nelson.70@us.af.mil
6 Attachments:
18. Service Contract Act, Dec 26 2023 – revision 19
19. Seed Project SOW (5 pages)
20. Seed Project As-builts (4 pages)
21. Seed Project Price Schedule (1 page)
22. Seed Project AF66 (3 pages)
23. Seed Project Location Map (1 page)
| 2024-04-18T08:19:04-0800 | |
| BARCELONA.BRIAN.ALEXANDER.1246753403 |
File details come from the government source that posted it. Updated .