Attachment 2. AF Form 66.xlsx
Air Force Form XLSX spreadsheet 16 KB Posted
- Solicitation number
- FA500023Q0035
About this file
This document contains a schedule of material submittals for a demolition project at Joint Base Elmendorf-Richardson in Alaska. The Air Force is soliciting offers from economically-disadvantaged woman-owned small businesses to demolish four unaccompanied housing units under solicitation number FA500023Q0035. The schedule outlines 22 required submittals and their due dates related to hazardous materials handling, quality control, environmental protection, and utility isolation plans. Key submittals include a hazardous material approval and usage report, safety data sheets, a waste management plan if lead or asbestos are present, and documentation of training for contractor employees. Offerors should refer to the solicitation for additional requirements and details such as a tentative site visit scheduled for June 1st.
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF66- Material Submittals
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER : | PROJECT TITLE: | SOLICITATION/CONTRACT NO.: | ||||||||||||||||||
| HJZH 21-1099 | Demo Unaccompanied Housing (Multi-Fac), Bldg 455, 456, 457, 458 | ||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | NO. OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING/ENVIRONMENTAL | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |||||||||||
| CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SAFETY DATA SHEETS | OTHER | DATE CONTRACTOR NOTIFIED | |||||||||||
| APPROVED | DIS- APPROVED | ||||||||||||||||||||
| 1 | HAZMAT Approval, General Specs 01500, para. 5.1.3 and 5.1.5. | x | NLT 10 working days prior to material being brought onto installation | ||||||||||||||||||
| 2 | HAZMAT Usage Report, General Specs 01500, para. 5.1.3 and 5.1.5. | x | NLT 7 Working Days After Final Acceptance | ||||||||||||||||||
| 3 | Quality Control Plan | x | 20 Days Prior to work start | ||||||||||||||||||
| 4 | SWPPP | x | 10 Days Prior to Pre-Construction Conference | ||||||||||||||||||
| 5 | Environmental Protection Plan | x | 10 Days prior to work start | ||||||||||||||||||
| 6 | LEAD WASTE MANAGEMENT PLAN (If needed) |
*Submittal
| 1.3.2.2 | x | x | 30 Days prior to abatement work start | |
| 7 | ASBESTOS ABATEMENT WORK PLAN (If needed) |
*Submittal
| 1.3.2.2 | x | 30 Days Prior to work start | |
| 8 | Disposal of Lead Containing Material (If needed) |
*REQUIREMENTS
| 1.3.2.4 | x | x | 30 Days Prior to work start | |
| 9 | Utilities Work |
*REQUIREMENTS
| 1.4 | x | x | 30 Days Prior to work start | |
| 10 | Water |
*REQUIREMENTS
| 1.4.1 | x | 30 Days Prior to work start | ||
| 11 | Electrical |
*REQUIREMENTS
| 1.4.3 | x | 30 Days Prior to work start | ||
| 12 | Natural Gas |
*REQUIREMENTS
| 1.4.5 | x | 30 Days Prior to work start | ||
| 13 | Hazardous material Sampling and analysis plan and schedule. (If needed) |
*REQUIREMENTS
| 1.5 | x | x | 30 Days Prior to work start | |
| 14 | Record of Training for Contractor Employees |
*REQUIREMENTS
| 1.5.2 | x | x | 30 Days Prior to work start | |
| 15 | Daily Reports |
*REQUIREMENTS
| 1.6.1 | x | Daily upon award of contract | ||
| 16 | Safety Data Sheets (SDSs) |
*REQUIREMENTS
| 1.5 | x | x | 30 Days Prior to work start | ||
| 17 | Medical Certification |
*Submittal (If needed)
| 1.5.2 | x | 30 Days Prior to work start | |
| 18 | Landfill Approval |
*Submittal
| 1.5.1 | x | 30 Days Prior to work start | |
| 19 | Testing Laboratory |
*Submittal (If needed)
| 1.3.2 | x | x | 30 Days Prior to work start | |
| 20 | Accumulation point daily and weekly inspection summary sheets |
*REQUIREMENTS
| 1.5.1 | x | x | Daily and weekly upon work start | ||
| 21 | Chain Of Custody Documents On Hazardous Materials. (If Needed) | ||||
| 1.5 | x | 30 Days after project completion | |||
| 22 | Seeding Submittals. (If needed) | ||||
| 1.3.2.10 | x | 30 Days Prior to work start |
Solicitation No. Attachment 6
AF FORM 66
(Computer Generated) PAGE &P of &N