Attachment 2 - AF Form 66 Schedule of Material Submittals.xlsx
Air Force Form XLSX spreadsheet 32 KB Posted
- Attached to
- Chiller Repairs B259/B521/B3453
- Solicitation number
- FA303023Q0009
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ATTACHMENT 2 | ||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: 1123582 | Bldgs. 259/521/3453 Chiller Condenser barrel repairs | SOLICITATION/CONTRACT NO.: | |||||||||||||||||
| TO BE COMPLETED BY THE PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL (Ref spec & para no.) | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S AND OTHER WARRANTIES | OPERATING INSTRUCTIONS | SEE PARA ON COPIES | OTHERS AS SPECIFIED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CON-TRACTING | DATE TO CIVIL ENGINEER-ING | RETURN SUSPENSE DATE | FOLLOW UP | DATE CONTRACTOR NOTIFIED | CONTRACT-TOR RE-SUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DISAPPROVED | |||||||||||||||||||
| 1 | Part 1, 1.5.1 in total |
Performance Period,
| Work Schedule/Plan | 1 | b | GA | ||||||||
| 2 | Part 1, 1.7.1 Safety | 1 | b | GA | |||||||
| 3 | Part 1, 1.11, Part 4 Submittals: | 1 | 1 | 1 | 1 | b | GA | ||||
| 4 | Part 1, 1.12 Warranties | 1 | 1 | d,e | GA | ||||||
| 5 | Part 1, 1.14.1.1Work Clearance Request, AF Form 103 | 1 | c | GA | |||||||
| 6 | Part 1, 1.14.2 Utility Outages | 1 | c | GA | |||||||
| 7 | Part 2, Attachment 1 Air Emissions Source Report | 1 | d/e | GA | |||||||
| 8 | Part 2, Attachment 1 Hazardous Wastes SDS and Report (If Applicable) | 1 | d/e | FIO | |||||||
| 9 | Part 2, Attachemnt 1 Disposal of Construction Waste | 1 | e | GA | |||||||
| 10 | Part 3, 3.4 Material Data/Certificates of Compliance | 1 | 1 | 1 | d/e | GA | |||||
| AF Form 66 | |||||||||||
| (a) As soon as possible but in no case later than 45 calendar days after NTP. | |||||||||||
| (b) No Later Than 14 Calendar Days | |||||||||||
| (c) Prior to Final Inspection of Task Order | No Later Than 14 Working Days Prior to Beginning On Site Work | ||||||||||
| (d) Final Inspection | Prior to Final Inspection | ||||||||||
| (e) As Required per Specifications or Contract |
PAGE &P OF &N
FORM66.xls
File details come from the government source that posted it. Updated .