Attachment 13 AF Form 66.xls
XLS spreadsheet 47 KB Posted
- Attached to
- Aircraft Clear Water Rinse Facility Federal contract opportunity
- Solicitation number
- FA481921R0009
About this file
This document contains a material submittals schedule template and information about a federal contract solicitation for an aircraft clear water rinse facility at Tyndall Air Force Base in Florida.
The material submittals schedule template includes columns for the item or description, required submission date, dates received and returned by the contracting office and civil engineering, submittal numbers, approval dates, and areas for notes. The related solicitation provides details on solicitation number FA481921R0009 to provide an aircraft clear water rinse facility at Tyndall AFB. Interested vendors are encouraged to review the full solicitation and its attachments. Any questions should be directed to the points of contact listed, Julie Bragg at the email provided or the 325th Contracting Construction Flight also provided.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| [ enter here ] | Project Title: | ||
| [ enter here ] | Solicitation / Contract Number: |
[ enter here ]
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||
| Number of Copies Required | Remarks | |||||||||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Manufacturer's Warranty | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Submittal Numbers | Date Contractor | ||||
| Notified | Contractor Resubmittal | Final Approval | ||||||||||||||||||||
| Approved | Disapproved | |||||||||||||||||||||
| 1 | ||||||||||||||||||||||
| 2 | ||||||||||||||||||||||
| 3 | ||||||||||||||||||||||
| 4 | ||||||||||||||||||||||
| 5 | ||||||||||||||||||||||
| 6 | ||||||||||||||||||||||
| 7 | ||||||||||||||||||||||
| 8 | ||||||||||||||||||||||
| 9 | ||||||||||||||||||||||
| 10 | ||||||||||||||||||||||
| 11 | ||||||||||||||||||||||
| 12 | ||||||||||||||||||||||
| 13 | ||||||||||||||||||||||
| 14 | ||||||||||||||||||||||
| 15 | ||||||||||||||||||||||
| 16 | ||||||||||||||||||||||
| 17 | ||||||||||||||||||||||
| 18 | ||||||||||||||||||||||
| 19 | ||||||||||||||||||||||
| 20 | ||||||||||||||||||||||
| 21 | ||||||||||||||||||||||
| 22 | ||||||||||||||||||||||
| 23 | ||||||||||||||||||||||
| 24 | ||||||||||||||||||||||
| 25 |
&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).
&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
File details come from the government source that posted it. Updated .