Attachment 13 AF Form 66.xls

XLS spreadsheet 47 KB Posted

Attached to
Aircraft Clear Water Rinse Facility
Solicitation number
FA481921R0009
Issued by

About this file

This document contains a material submittals schedule template and information about a federal contract solicitation for an aircraft clear water rinse facility at Tyndall Air Force Base in Florida.

The material submittals schedule template includes columns for the item or description, required submission date, dates received and returned by the contracting office and civil engineering, submittal numbers, approval dates, and areas for notes. The related solicitation provides details on solicitation number FA481921R0009 to provide an aircraft clear water rinse facility at Tyndall AFB. Interested vendors are encouraged to review the full solicitation and its attachments. Any questions should be directed to the points of contact listed, Julie Bragg at the email provided or the 325th Contracting Construction Flight also provided.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

Project Number:
[ enter here ]Project Title:
[ enter here ]Solicitation / Contract Number:

[ enter here ]

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies RequiredRemarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationManufacturer's WarrantyCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission DateDate Received in ContractingDate to Civil EngineeringReturn Suspense DateSubmittal NumbersDate Contractor
NotifiedContractor ResubmittalFinal Approval
ApprovedDisapproved
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).

&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)

File details come from the government source that posted it. Updated .