Aircraft Water Rinse RFI Answers .xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- Aircraft Clear Water Rinse Facility
- Solicitation number
- FA481921R0009
About this file
This document contains questions and answers related to a solicitation for an Aircraft Clear Water Rinse Facility project at Tyndall Air Force Base in Florida. The project involves replacing the existing aircraft rinse facility, including demolishing the existing system and structures and designing and constructing a new clear water rinse system. Key details include that proposals are due by August 25, 2021 at 1:00 PM CST and should be submitted via email to the listed contracting personnel. The new system must be capable of rinsing 12 aircraft per hour and include appropriate runway markings and lighting. It should have adjustable rinse times between 10-40 seconds and be activated via radio. Questions cover requirements for bonding documents, past performance submissions, maximum heights for equipment, utility information, and design submittal requirements.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Questions and Answers are due on 25 August 2021 at 1:00 PM, CST
| # | Type of Question | Name of Document | Questions | Answers |
| 1 | Request for Clarification | SF1442 | Bonding is required. Where do we include the bond documents? | Bond documents need to be included after award of contract. No bond documents are required with proposal submission. |
| 2 | Request for Clarification | FA481921R0009+001 | Can offerors submit PPQs in lieu of CPARS? | Yes |
| 3 | Request for Clarification | Attachment+2++APPENDIX+A++2+AUG+2021 | *The system will be designed for radio activation from both aircraft, the tower and airfield operations facility. The new system will include appropriate runway markings and lighting plus a lighted panel informing the pilot it is safe to proceed into the rinse area. | The panel will need to meet UFC and other regulations which govern airfield lighting. The specifics of the panel in terms of color, lumens, location, size, etc. will be determined during the design phase with end user input. |
| As we spoke about yesterday the system is to be designed to be activated from multiple locations including the aircraft so this tells us it needs to be a wireless activation. One thing we did not cover is the lighted panel. Is there any spec on the light size, color, lumens, etc.? | ||||
| 4 | Request for Clarification | Attachment+2++APPENDIX+A++2+AUG+2021 | *Task 2.0 - Demolish Existing Aircraft Clear Water Rinse Facility: Demolish and remove the existing rinse facility, supporting utility lines, and taxiway as determined by the design. The existing facility components will not be needed for the new facility | Correct. A further investigation will need to be conducted as part of the design to confirm the condition of the utilities leading to the system. The existing system will be demolished (removed) and replaced with the new system and will tie in to the utilities. |
| I know we spoke about replacing basically everything, but I think it was mentioned trying to reuse some of the underground and I read this as other than the incoming utilities we are to replace everything else to include trench drains, piping, conduit, etc. Basically, we tie into the main electrical feed, water main, and main drain, and replace everything else. based on task 2.0 by design, we are assuming supporting utilities – our preliminary design that those components (utilities line) we will replace from 5’ to our system. Anything beyond 5’ is usable condition. | ||||
| 5 | Request for Clarification | Attachment+5++Airfield+Utilities+Map | What power size do we have access to? | Refer to provided as builts; Must be confirmed by contractor during design phase |
| 6 | Request for Clarification | Attachment+5++Airfield+Utilities+Map | What is the incoming freshwater line diameter/size and static pressure? | Refer to provided as builts; Must be confirmed by contractor during design phase. A request has been made for the static pressure. However, the use of reservoir tank (as is currently in place) and pumps to pressurize the water going to the nozzles in the wash system should negate any concerns with the static pressure. |
| 7 | Request for Clarification | Attachment+5++Airfield+Utilities+Map | What Amperage is available? | Refer to provided as builts; Must be confirmed by contractor during design phase |
| 8 | Request for Clarification | Attachment+5++Airfield+Utilities+Map | Need to know what the power source is and type available. | Refer to provided as builts; Must be confirmed by contractor during design phase |
| 9 | Request for Clarification | FA481921R0009+001 | What will the operating procedure be? Will it be a “drive through” or “park and rinse”? What will be the specification on time? What sensors will we need? | The rinse will function as a drive through. The system should be adjustable from 10-40 seconds, but it is expected that it will run 20 seconds for each aircraft. The system should be activated via radio and run for the specified time. No sensors are expectd to installed at this time. |
| 10 | Request for Clarification | Attachment+4+++TO+1+1+691 | Do we have access to control wiring on the existing system? | Yes |
| 11 | Request for Clarification | Attachment+1+SOW+29+JUL+2021 | What is the designated “height limit” on equipment at the pump station? | Unless the design prohibits, the new system should not exceed the height of the existing system |
| 12 | Request for Clarification | General Question | Will the government consider that as-builts be provided for the existing design? | Yes; They have been provided |
| 13 | Request for Clarification | Attachment+4+++TO+1+1+691 | what is the degree of the slop on the tarmak? | The slope for that area is unavailable at this time. It will need to be determinded by the designer of record. |
| 14 | Request for Clarification | General Question | Will the government consider allowing a week extension, since it is due on 9/6; Labor Day 2021 | Yes there will be a proposal extension posted with amendment 0001. |
| 15 | Request for Clarification | Attachment+5++Airfield+Utilities+Map | The specifications dictate that the system must be capable of rinsing 12 aircraft per hour. Is it required that the system is capable of rinsing at this throughput continuously (24/7)? Or, should the system be capable of rinsing a specific number of aircraft continuously? Example, if the system requirements were such that it must be capable of rinsing 60 vehicles continuously at a rate of 12 per hour, the filter throughput and tank capacities required would differ materially. | The maximum throughput will be 12 aircraft per hour. This expected to occur no more that 2 times in a 24 hour period, once in the AM and once in the PM. It will be used throughout the day as needed, but should not include more than 4 aircraft an hour during the off peak times. |
| 16 | Request for Clarification | Section L, Page 50 of 62, para. B.1 states, “Provide an electronic copy via email of your proposal and all information required by this RFP to Contract Personnel.”; and Section L, Page 51 of 62, para. B.1 states, “Please submit your proposal via email.”; however, Section L, Page 52 of 62, para. 8 states, “Submission of one electronic copy of the initial proposal packages is required via email/DOD SAFE, mailed, or hand-delivered.” |
Please clarify if the Government is requiring proposals to be emailed to the listed contract personnel or submitted via DOD SAFE.
| Proposals should be sent via email to the listed contracting personnel. Make sure you receive acknowledgement of receipt after sending. | ||
| 17 | Request for Clarification | Section L, Page 53 of 62, Volume 3 – Technical, para. iv.1 Archeologist states, “The archeologist must have a minimum professional qualifications in archeology and are a graduate degree in archeology, anthropology, or closely related field.” |
Please clarify if this is a grammatical/clerical error and if the intended sentence should read “archeologist must have minimum professional qualifications in archeology and/or a graduate degree in archeology, anthropology, or closely related field.”, or “archeologist must have minimum professional qualifications in archeology and a graduate degree in archeology, anthropology, or closely related field.”
| The intended sentence should read " “archeologist must have minimum professional qualifications in archeology and/or a graduate degree in archeology, anthropology, or closely related field.” | ||||
| 18 | Request for Clarification | The F-35 platform has been designed and developed after the T.O. 1-1-691 the UFC, and other defining materials were developed. The F-35 has many sensitive area’s as well as a large composite construction component. Is there specific mandates or requirements specific to the F-35 available so as to do no harm to the airframe. Most traditional rinse systems have pressures that exceed acceptable allowances and defining the target impingement pressure will be very important. | Not at this time. The system should be designed to have adjustable pressures. | |
| 19 | Request for Clarification | Is water recovery and recycling desired/required for this rinse system? | No. The new system should replicate the existing system in terms of waster water. Refer to provided as builts; Must be confirmed by contractor during design phase | |
| 20 | Request for Clarification | Is there a water quality report showing the quality of the water that would be provided to the system? (This will define the type of inlet water treatment needed to meet the T.O. requirements) | It will be provided during the design period. However, the water will be potable and does not need to filtered. | |
| 21 | Request for Clarification | Is there a target or maximum number of aircraft rinses per hour and per day? (has to do with the amount of water needed and stored) | Refer to the as builts to determine the size of the existing that should be replaced with a matching size of reservoir tank to meet the expected throughput. | |
| 22 | Request for Clarification | The solicitation requirements in Section L and Section M does not reference teaming arrangements. Will offerors be allowed to submit past performance for both the prime and teaming partner(s)? | Yes | |
| 23 | Request for Clarification | Given the cost of the F-35 and the fact there is not a great deal of data on the platform, has Lockheed Martin or the F-35 Program Office been consulted to determine what sensitive areas of the plane need special attention? Early discussions with LMCO engineers indicated there are a number of areas of concern that need to be factored into the design of a rinse system – has this discussion taken place? | Not at this time. The system should be designed to have adjustable pressures. | |
| 24 | Request for Clarification | Given the requirement of the ability to rinse 12 aircraft in a 60-minute time frame, is the rinse water to be recovered, filtered, and reused? | No. The new system should replicate the existing system in terms of waster water. Refer to the provided as builts | |
| 25 | Request for Clarification | Is there a water quality report for the water at the location of the connection for the rinse system? To meet T.O. 1-1-691, an inlet water pretreatment system will be needed and knowing to what extent this delivery water needs to be filtered will be required. | It will be provided during the design period. However, the water will be potable and does not need to filtered. | |
| 26 | Request for Clarification | The system will require 600-800amps of 480v 3phase 60hz power, potable water, a sanitary sewer connection, and a storm water sewer connection: Do you have a site map showing where these utilities are located and their sizes? | Refer to provided as builts; Must be confirmed by contractor during design phase | |
| 27 | Request for Clarification | The existing over carriage and under carriage nozzle layout is not suitable for multiple platforms or the F-35, will above ground over carriage nozzles be allowed? | No; Nozzles to provide water to the upper surfaces of the aircraft should be installed in the trench similar to the existing system and designed to spray the upper surface of the aircraft. | |
| 28 | Request for Clarification | Per question 31, if above grade nozzles are not allowed, would open vaults with recessed over carriage nozzles be allowed? These would be the taxiway in the grass. | Yes | |
| 29 | Request for Clarification | How deep is the water table at the rinse pad? How deep can excavations be made? To rinse 12 aircraft in an hour will require delivery of 2000+ gallons of water per aircraft. Can this be stored in underground tanks or will make up water and rinse water have to be held above ground? | The depth of the water table will need to be determined as part of the design. Underground tanks are allowed and required to meet airfield obstruction requirements. The current system has underground tanks and are expected to be replaced in kind as part of the project. Refer to the provided as builts for the size of the existing underground tanks. | |
| 30 | Request for Clarification | Given the hardware that is required to do the job properly, housing the inlet water treatment, water delivery, water storage, and water recovery hardware will require a building or a series of modified ISO containers. Where should we plan on locating these facilities? | ISO containers will not be allowed. The new system should remain within the footprint of the existing system. | |
| 31 | Request for Clarification | Would the use of modified ISO containers be allowed to house the system and water storage if a suitable building location is not available within reason of the rinse location? | No | |
| 32 | Request for Clarification | Does the system require automatic wind correction to allow use of the rinse system in wind between 5knots – 25knots? | No | |
| 33 | Request for Clarification | Modern rinse systems incorporate over carriage nozzles that adjust the angle and spray pattern based on the aircraft using the rinse system (F-35, F-15, F-16). Will this be required so the pilot would choose the aircraft rinse needed and get a specific airframe rinse? | This will be investigated further. At this time the system the should be designed to support the F-35 | |
| 34 | Request for Clarification | Is there a requirement for sustainment and factory maintenance for the first year of operation, allowing the base personnel to learn the system and determine if an ongoing maintenance contract would be needed? | Per page 42 para. E. of the SOW The project should include a one year warranty and training to the base personnel to include manuals and documentation to operate and maintain the aircraft | |
| 35 | Request for Clarification | Can you identify the direction of travel of the aircraft – is this a one-way system or would aircraft need to enter from either side? | One way. The direction of travel will be determined during the design phase based on input form the end user. | |
| 36 | Request for Clarification | Are there discharge limits or water quality requirements for water going to the sanitary sewer line? | The new system should replicate the existing system in terms of the discharge water. Refer to the provided as builts for the storm and sanitary sewer discharge. | |
| 37 | Request for Clarification | Does the effluent water need to be passed through an oil-water separator or sand-oil interceptor before being | ||
| pushed to the sanitary sewer line? | The new system should replicate the existing system in terms of the discharge water. Refer to the provided as builts for the storm and sanitary sewer discharge. | |||
| 38 | Request for Clarification | Does the domestic water need to be pre-treated to remove salts, sediments, hardness, etc before coming into | ||
| contact with the F-35’s? | No | |||
| 39 | Request for Clarification | Please clarify if Contractor or the local utility provider GCEC is responsible for the tranformer utility modifications | Transformer modifications should be coordinated throught GCEC. | |
| 40 | Request for Clarification | Please provide a funded CLIN for all contractors to carry for GCEC scope of work. | This will provided once the contract is awarded | |
| 41 | Request for Clarification | Please provide expected water pressure available at rinse location. | Refer to provided as builts; Must be confirmed by contractor during design phase. A request has been made for the static pressure. However, the use of reservoir tank (as is currently in place) and pumps to pressurize the water going to the nozzles in the wash system should negate any concerns with the static pressure. | |
| 42 | Request for Clarification | Please clarify if this project is tax exempt. | Unknown | |
| 43 | Request for Clarification | Please clarify if Contractor or the local utility provider GCEC is responsible for modifications to the UG utility modifications. Where does this responsibility start or end? | Coordination should be made with GCEC to confirm. Typically power from the transformers to the final location is outside of GCEC responsibilities. | |
| 44 | Request for Clarification | Are there discharge limits or water quality requirements for water going to the sanitary sewer line? | The new system should replicate the existing system in terms of the discharge water. Refer to the provided as builts for the storm and sanitary sewer discharge connections. | |
| 45 | Request for Clarification | Can you identify the direction of travel of the aircraft – is this a one way system or would aircraft need to enter from either side? | One way. The direction of travel will be determined during the design phase based on input from the end user. | |
| 46 | Request for Clarification | Is there a requirement for sustainment and factory maintenance for the first year of operation, allowing the base personnel to learn the system and determine if an ongoing maintenance contract would be needed? | Per page 42 para. E. of the SOW The project should include a one year warranty and training to the base personnel to include manuals and documentation to operate and maintain the aircraft | |
| 47 | Request for Clarification | Modern rinse systems incorporate over carriage nozzles that adjust the angle and spray pattern based on the aircraft using the rinse system ( F-35, F-15, F-16). Will this be required so the pilot would choose the aircraft rinse needed and get a specific airframe rinse? | This will be investigated further. At this time the system the should be designed to support the F-35 | |
| 48 | Request for Clarification | Does the system require automatic wind correction so as to allow use of the rinse system in wind between 5knots – 25knots? | No | |
| 49 | Request for Clarification | Would the use of modified ISO containers be allowed to house the system and water storage if a suitable building location is not available within reason of the rinse location? | No | |
| 50 | Request for Clarification | Given the hardware that is required to do the job properly, housing the inlet water treatment, water delivery, water storage, and water recovery hardware will require a building or a series of modified ISO containers. Where should we plan on locating these facilities? | ISO containers will not be allowed. The new system should remain within the footprint of the existing system. | |
| 51 | Request for Clarification | How deep is the water table at the rinse pad? How deep can excavations be made? To rinse 12 aircraft in an hour will require delivery of 2000+ gallons of water per aircraft. Can this be stored in underground tanks or will make up water and rinse water have to be held above ground? | Based on existing systems (number of spray nozzels and flow rate (gpm)) and time per aricraft (20 secs to wash each aircraft) the anticipated quantity of water required per aircraft is approximately 200 gallons for each rinse. This equates to 2400 gallons per hour. This is a maximum number of aircraft. It is anticipated that no more than 36 aircraft will utilize the sytem in a 24 hour period. A large holding tank (as is currently in place) will be used to maintain an adequate amount of water for the system. | |
| 52 | Request for Clarification | The existing over carriage and under carriage nozzle layout is not suitable for multiple platforms or the F-35. Will above ground over carriage nozzles be allowed? | No; Nozzles to provide water to the upper surfaces of the aircraft should be installed in the trench similar to the existing system and designed to spray the upper surface of the aircraft. | |
| 53 | Request for Clarification | For the previous question, if above grade nozzles are not allowed, would open vaults with recessed over carriage nozzles be allowed? | Nozzles to provide water to the upper surfaces of the aircraft should be installed in the trench similar to the existing system and designed to spray the upper surface of the aircraft. | |
| 54 | Request for Clarification | The system will require 600-800amps of 480v 3phase 60hz power, potable water, a sanitary sewer connection, and a storm water sewer connection: Please provide a utility site map showing where these utilities are located and their sizes? | Refer to provided as builts | |
| 55 | Request for Clarification | Is there a water quality report for the water at the location of the connection for the rinse system? To meet T.O. 1-1-691, an inlet water pretreatment system will be needed and knowing to what extent this delivery water needs to be filtered will be required. | The water quality report is not available at this time. It will be provided during the design. However, no filtering is expected. | |
| 56 | Request for Clarification | Given the requirement of the ability to rinse 12 aircraft in a 60-minute time frame, is the rinse water to be recovered, filtered, and reused? | No; The new system should be designed to replace the existing system in kind. Refer to provided as builts for disposal of waste water | |
| 57 | Request for Clarification | Given the cost of the F-35 and the fact there is not a great deal of data on the platform, has Lockheed Martin or the F-35 Program Office been consulted to determine what sensitive area’s of the plane need special attention? Early discussions with LMCO engineers indicated there are a number of area’s of concern that need to be factored into the design of a rinse system – has this discussion taken place? | No | |
| 58 | Request for Clarification | Please clarify the project period of performance. The FOPR Page 1 states 280 days. The FOPR Page 8 states 180 Days. Appendix A States 280 Days. SOW 1.1-B states 300 Days. | 280, all documents will be revised to reflect the 280 day period of performance. | |
| 59 | Request for Clarification | Attachment 1 SOW Dated 29 Jul 2021, paragraph 4.0, Table 1 states that 35% design is not applicable. Paragraph 6.1.5.B states that the contractor shall prepare and submit for approval a draft 35%. Please confirm 35% submittal for design is not required. | a 35% design will not be required. However, the kickoff meeting and design charette will serve to set the expectations for the design for subsequent submittals. | |
| 60 | Request for Clarification | Please provide any pertinent electrical data of the existing electrical equipment feeding the existing water rinse system. | Refer to provided as builts; Must be confirmed by contractor during design phase | |
| 61 | Request for Clarification | Please indicate the amperage and voltage of the existing electrical connection to the existing water rinse system. | Refer to provided as builts; Must be confirmed by contractor during design phase | |
| 62 | Request for Clarification | Please indicate the pathway and construction of the underground electrical feed to the existing water rinse system. | Refer to provided as builts; Must be confirmed by contractor during design phase | |
| 63 | Request for Clarification | Please confirm the size of the existing water main connected to the water line feeding the existing water rinse system. | Refer to provided as builts; Must be confirmed by contractor during design phase | |
| 64 | Request for Clarification | Please provide size of the existing gravity main that the current pressurized main is attached to. | Refer to provided as builts; Must be confirmed by contractor during design phase | |
| 65 | Request for Clarification | Please provide pump data/location for the pressurized main. | Refer to provided as builts; Must be confirmed by contractor during design phase | |
| 66 | Request for Clarification | Please confirm the size of the existing pressurized main. | Refer to provided as builts; Must be confirmed by contractor during design phase | |
| 67 | Request for Clarification | Attachment 2 - Appendix A dated 2 Aug 2021, paragraph 2.1 states the new system will include appropriate runway markings and lighting plus a lighted panel informing the pilot it is safe to proceed into the rinse area. Are there existing markings/lighting that need to be removed as part of this scope? | Yes. Due to the need to remove and replace portions of the taxiway, new lighting will need to be installed to replace existing lighting that is demolished. |