Attachment 4 TO 1 1 691.pdf
PDF 5 MB Posted
- Attached to
- Aircraft Clear Water Rinse Facility Federal contract opportunity
- Solicitation number
- FA481921R0009
About this file
This notice announces a solicitation for an aircraft clear water rinse facility at Tyndall Air Force Base in Florida. The 325th Contracting Squadron is seeking proposals from qualified vendors to provide the facility. Offerors should review the solicitation and attachments in full, which provide details on the required clear water rinse facility and instructions for proposal submission. Any questions should be directed to the points of contact listed.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TO 1-1-691
TECHNICAL MANUAL
CLEANING AND CORROSION PREVENTION
AND CONTROL,
AEROSPACE AND NON-AEROSPACE EQUIPMENT
F42620-00-D-0038
FA8501-07-F-A080
DISTRIBUTION STATEMENT A - Approved for public release; distribution is unlimited. PA Case Number PA04-11-96. Other requests for this document shall be referred to 406 SCMS/GUEE. Questions concerning technical content shall be referred to AFLCMC/EZPT-CPCO.
Published Under Authority of the Secretary of the Air Force
2 NOVEMBER 2009 CHANGE 17 - 8 NOVEMBER 2019
BASIC AND ALL UPDATES HAVE BEEN MERGED TO MAKE THIS A COMPLETE PUBLICATION.
Dates of issue for original and changed pages are:
Original. . . . . . . .0. . . .2 November 2009 Change . . . . . . . . 1. . . . . . .12 April 2010 Change . . . . . . . . 2 . . . . . . . 11 May 2011 Change . . . . . . . . 3. . . . .15 January 2013 Change . . . . . . . . 4. . . . . .14 March 2013 Change . . . . . . . . 5 . . . . . . 5 August 2013 Change . . . . . . . . 6 . . . . 17 February 2014 Change . . . . . . . . 7 . . . . . . . 29 May 2014 Change . . . . . . . . 8 . . . . . . . 11 July 2014
Change . . . . . . . . 9 . . . . 4 December 2014 Change . . . . . . . 10. . . . .14 January 2015 Change . . . . . . . 11 . . . . . . . . 2 July 2015 Change . . . . . . . 12. . . . . .1 January 2016 Change . . . . . . . 13 . . . . 20 February 2016 Change . . . . . . . 14 . . . . . . . 13 July 2017 Change . . . . . . . 15 . . . . . . . 30 June 2018 Change . . . . . . . 16 . . .29 September 2018 Change . . . . . . . 17. . . .8 November 2019
TOTAL NUMBER OF PAGES IN THIS PUBLICATION IS 400, CONSISTING OF THE FOLLOWING:
Page *Change No. No.
Page *Change No. No.
Page *Change No. No.
Title A - B C Blank i ii iii - viii ix x Blank xi - xii xiii - xiv xv - xvi xvii Deleted xviii Deleted 1-1 1-2 2-1 - 2-7 2-8 2-9 - 2-11 2-12 2-12.1 Added 2-12.2 Blank 2-13 - 2-20 3-1 3-2 3-2.1 - 3-2.2 Deleted 3-3 - 3-6 3-7 - 3-8 3-9 - 3-11 3-12 3-13 3-14 3-15 3-16 3-17 - 3-19 3-20 3-21 - 3-24 3-25 - 3-28 3-29
3-30 - 3-36 3-37 3-38 3-39 3-40 3-41 3-42 - 3-43 3-44 - 3-45 3-46 - 3-48 3-48.1 - 3-48.2 Added 3-49 3-50 3-51 3-52 - 3-53 3-54 - 3-55 3-56 - 3-57 3-58 - 3-59 3-60 - 3-63 3-64 4-1 4-2 4-3 - 4-4 4-4.1 Added 4-4.2 Blank 4-5 - 4-14 4-15 4-16 - 4-18 5-1 - 5-11 5-12 5-13 - 5-15 5-16 5-17 - 5-26 5-27 5-28 5-29 5-30 5-31 - 5-39 5-40 - 5-41
5-42 - 5-46 5-46.1 Added 5-46.2 Blank 5-47 - 5-50 5-51 5-52 Added 5-53 Added 5-54 Blank 6-1 6-2 6-3 6-4 - 6-5 6-6 - 6-31 6-32 6-33 - 6-36 7-1 - 7-2 7-3 7-4 - 7-6 7-7 7-8 - 7-10 7-11 - 7-13 7-14 7-15 - 7-19 7-20 Blank 8-1 - 8-2 8-2.1 8-2.2 Blank 8-3 - 8-5 8-6 8-7 8-8 8-9 8-10 8-11 8-12 - 8-13 8-14 8-14.1 Added 8-14.2 Blank
TO 1-1-691
LIST OF EFFECTIVE PAGES
INSERT LATEST CHANGED PAGES. DESTROY SUPERSEDED PAGES.
NOTE The portion of the text affected by the changes is indicated by a vertical line in the outer margins of the page. Changes to illustrations are indicated by shaded or screened areas, or by miniature pointing hands.
* Zero in this column indicates an original page.
A Change 17 USAF
8-15 8-16 8-16.1 Added 8-16.2 Blank 8-17 8-18 Blank 9-1 - 9-3 9-4 Blank 10-1 Added 10-2 10-3 Added 10-4 Blank A-1 A-2 - A-9 A-10 A-11 - A-12 A-13 A-14 A-15 A-16 - A-19 A-20 - A-21 A-22 - A-54 A-55 - A-57 A-58 Blank B-1 B-2 - B-18 B-19 - B-20 B-20.1 Added B-20.2 Blank B-21 - B-27 B-28 - B-30 B-30.1 - B-30.3 Added B-30.4 Blank B-31 - B-41 B-42 B-43 B-44 - B-45 B-46 Blank Glossary 1 - Glossary 4 Index 1 - Index 4 Index 4.1 Added Index 4.2 Blank Index 5 - Index 8 Index 8.1 - Index 8.2 Deleted Index 9 Index 10 Blank Index 11 - Index 14 Deleted
TO 1-1-691
LIST OF EFFECTIVE PAGES - continued
Page *Change No. No.
Page *Change No. No.
Page *Change No. No.
* Zero in this column indicates an original page.
Change 17 B/(C blank)
TABLE OF CONTENTS
Chapter Page
LIST OF ILLUSTRATIONS . . . . . . . . . . . . . vii
LIST OF TABLES . . . . . . . . . . . . . . . . . . . . viii
INTRODUCTION . . . . . . . . . . . . . . . . . . . . xi
SAFETY SUMMARY
1 INTRODUCTION . . . . . . . . . . . . . . . . . . . 1-1
1.1 CORROSION CONTROL
PROGRAM. . . . . . . . . . . . . . . 1-1
1.1.1 Training . . . . . . . . . . . . . . . . . . . 1-1
1.1.2 Maintenance . . . . . . . . . . . . . . . . 1-1
1.1.3 Facilities . . . . . . . . . . . . . . . . . . . 1-1
1.2 SAFETY. . . . . . . . . . . . . . . . . . . 1-1
1.2.1 Responsibility of Supervisors . . . . . 1-1
1.2.2 Materials Handling . . . . . . . . . . . . 1-1
1.3 MATERIALS . . . . . . . . . . . . . . . 1-2
2 CORROSION THEORY . . . . . . . . . . . . . . . 2-1
2.1 INTRODUCTION TO CORRO-
SION THEORY . . . . . . . . . . . . 2-1
2.2 DEFINITION OF
CORROSION . . . . . . . . . . . . . 2-1
2.3 CHEMICAL DEFINITIONS . . . . . 2-1
2.3.1 Atom . . . . . . . . . . . . . . . . . . . . . 2-1
2.3.2 Electron . . . . . . . . . . . . . . . . . . . 2-1
2.3.3 Ions . . . . . . . . . . . . . . . . . . . . . . 2-1
2.3.4 Electrolyte. . . . . . . . . . . . . . . . . . 2-1
2.4 THEORY OF CORROSION . . . . . 2-1
2.4.1 Anode . . . . . . . . . . . . . . . . . . . . 2-1
2.4.2 Cathode . . . . . . . . . . . . . . . . . . . 2-1
2.4.3 Electrolyte. . . . . . . . . . . . . . . . . . 2-1
2.4.4 Electrical Contact . . . . . . . . . . . . . 2-1
2.5 DEVELOPMENT OF
CORROSION . . . . . . . . . . . . . 2-2
2.5.1 Corrosion Under Painted
Surfaces . . . . . . . . . . . . . . . . . 2-2
2.6 FACTORS INFLUENCE
CORROSION . . . . . . . . . . . . . 2-2
2.6.1 Type of Metal . . . . . . . . . . . . . . . 2-2
2.6.2 Dissimilar Metal Coupling (Galvanic
Corrosion). . . . . . . . . . . . . . . . 2-2
2.6.3 Anode and Cathode Surface
Area. . . . . . . . . . . . . . . . . . . . 2-3
2.6.4 Temperature . . . . . . . . . . . . . . . . 2-4
2.6.5 Heat Treatment and Grain
Direction. . . . . . . . . . . . . . . . . 2-4
2.6.6 Electrolytes . . . . . . . . . . . . . . . . . 2-4
2.6.7 Oxygen. . . . . . . . . . . . . . . . . . . . 2-5
2.6.8 Electrolyte Concentration. . . . . . . . 2-5
Chapter Page
2.6.9 Biological Organisms . . . . . . . . . . 2-5
2.6.10 Mechanical Stress. . . . . . . . . . . . . 2-5
2.6.11 Time . . . . . . . . . . . . . . . . . . . . . 2-5
2.7 TYPES OF CORROSION . . . . . . . 2-5
2.7.1 Uniform Surface Corrosion . . . . . . 2-5
2.7.2 Galvanic Corrosion. . . . . . . . . . . . 2-5
2.7.3 Pitting Corrosion . . . . . . . . . . . . . 2-6
2.7.4 Intergranular Corrosion . . . . . . . . . 2-6
2.7.5 Exfoliation Corrosion . . . . . . . . . . 2-6
2.7.6 Crevice/Concentration Cell
Corrosion . . . . . . . . . . . . . . . . 2-6
2.7.7 Corrosion Fatigue. . . . . . . . . . . . . 2-8
2.7.8 Filiform Corrosion . . . . . . . . . . . . 2-8
2.7.9 Fretting Corrosion . . . . . . . . . . . . 2-10
2.7.10 High Temperature Oxidation (Hot
Corrosion). . . . . . . . . . . . . . . . 2-11
2.8 METALS AFFECTED BY
CORROSION . . . . . . . . . . . . . 2-11
2.8.1 Magnesium . . . . . . . . . . . . . . . . . 2-11
2.8.2 Steel. . . . . . . . . . . . . . . . . . . . . . 2-12
2.8.3 Aluminum. . . . . . . . . . . . . . . . . . 2-12
2.8.4 Anodized Aluminum. . . . . . . . . . . 2-12
2.8.5 Titanium . . . . . . . . . . . . . . . . . . . 2-12
2.8.6 Copper and Copper Alloys. . . . . . . 2-13
2.8.7 Cadmium . . . . . . . . . . . . . . . . . . 2-16
2.8.8 CRES/Stainless Steel . . . . . . . . . . 2-16
2.8.9 Nickel and Chromium. . . . . . . . . . 2-16
2.8.10 Silver, Platinum, and Gold. . . . . . . 2-16
2.8.11 Graphite/Carbon Fiber
Composites . . . . . . . . . . . . . . . 2-16
2.9 CORROSIVE
ENVIRONMENTS. . . . . . . . . . 2-16
2.9.1 Moisture . . . . . . . . . . . . . . . . . . . 2-16
2.9.2 Temperature . . . . . . . . . . . . . . . . 2-17
2.9.3 Salt Atmospheres . . . . . . . . . . . . . 2-17
2.9.4 Ozone . . . . . . . . . . . . . . . . . . . . 2-17
2.9.5 Other Industrial Pollutants . . . . . . . 2-17
2.9.6 Sand, Dust, and Volcanic Ash. . . . . 2-18
2.9.7 Solar Radiation . . . . . . . . . . . . . . 2-18
2.9.8 Climate. . . . . . . . . . . . . . . . . . . . 2-18
2.9.9 Factors of Influence in Tropical
Environments . . . . . . . . . . . . . 2-18
2.9.10 Manufacturing . . . . . . . . . . . . . . . 2-19
2.9.11 Storage . . . . . . . . . . . . . . . . . . . . 2-19
2.9.12 Shipment . . . . . . . . . . . . . . . . . . 2-19
2.9.13 Industrial and Ship Emitted Air
Pollutants . . . . . . . . . . . . . . . . 2-19
2.9.14 Animal Damage . . . . . . . . . . . . . . 2-19
2.9.15 Microorganisms . . . . . . . . . . . . . . 2-19
2.10 DEGRADATION OF
NON-METALS . . . . . . . . . . . . 2-20
2.11 PREVENTIVE
MAINTENANCE. . . . . . . . . . . 2-20
Change 17 i
3 PREVENTIVE MAINTENANCE . . . . . . . . . 3-1
SECTION I INTRODUCTION. . . . . . . . . . . 3-1
3.1 PREVENTIVE MAINTENANCE
PROGRAM. . . . . . . . . . . . . . . 3-1
3.1.1 Preventive Maintenance. . . . . . . . . 3-1
SECTION II CLEANING . . . . . . . . . . . . . . 3-6
3.2 INTRODUCTION . . . . . . . . . . . . 3-6
3.2.1 Reasons for Cleaning . . . . . . . . . . 3-6
3.2.2 When to Accomplish Work . . . . . . 3-7
3.2.3 Aircraft Clear Water Rinse (CWR)
Requirements. . . . . . . . . . . . . . 3-7
3.2.4 Immediate Cleaning . . . . . . . . . . . 3-8
3.2.5 Deployed Aircraft Wash
Requirements. . . . . . . . . . . . . . 3-8
3.3 CLEANING COMPOUNDS . . . . . 3-9
3.3.1 Alkaline Cleaners . . . . . . . . . . . . . 3-9
3.3.2 Solvent Emulsion and Aqueous
Cleaners for Turbine Engine Gas Path and General Area Cleaning . . . . . . . . . . . . . . . . . 3-10
3.3.3 Aqueous Parts Washer Cleaning
Solutions. . . . . . . . . . . . . . . . . 3-10
3.3.4 Solvents . . . . . . . . . . . . . . . . . . . 3-11
3.3.5 Miscellaneous Cleaning Agents . . . 3-11
3.3.6 Steam Cleaning . . . . . . . . . . . . . . 3-12
3.3.7 Dilution . . . . . . . . . . . . . . . . . . . 3-12
3.4 CLEANING EQUIPMENT . . . . . . 3-29
3.4.1 High Pressure/Hot Water Wash
Equipment. . . . . . . . . . . . . . . . 3-29
3.4.2 Portable, 15 Gallon, Foam Generat-
ing, Cleaning Unit . . . . . . . . . . 3-29
3.4.3 Portable, 45 Gallon, Foam Generat-
ing Cleaning Unit. . . . . . . . . . . 3-32
3.4.4 Turbine Engine Compressor Clean-
ing Equipment . . . . . . . . . . . . . 3-33
3.4.5 Miscellaneous Large Cleaning
Equipment. . . . . . . . . . . . . . . . 3-33
3.4.6 Spray Cleaning Guns for
Solvents . . . . . . . . . . . . . . . . . 3-33
3.4.7 Pneumatic Vacuum Cleaner . . . . . . 3-33
3.4.8 Universal Wash Unit . . . . . . . . . . . 3-33
3.4.9 Aqueous Parts Washers . . . . . . . . . 3-34
3.4.10 Miscellaneous Equipment . . . . . . . 3-35
3.5 CLEANING PROCEDURES . . . . . 3-36
3.5.1 Warnings and Cautions . . . . . . . . . 3-36
3.5.2 Cleaning Methods . . . . . . . . . . . . 3-39
3.5.3 Clear Water Rinsing of Aircraft . . . 3-46
3.5.4 Post Cleaning Procedures . . . . . . . 3-46
3.5.5 Treatment and Disposal of Wash
Rack Waste . . . . . . . . . . . . . . . 3-47
3.5.6 Fungus Growth Removal . . . . . . . . 3-47
Chapter Page
3.5.7 Soil Barriers . . . . . . . . . . . . . . . . 3-48.2
3.5.8 Bird Strike Cleaning . . . . . . . . . . . 3-49
3.5.9 Bodily Fluids Contamination
Cleanup . . . . . . . . . . . . . . . . . 3-51
SECTION III LUBRICATION . . . . . . . . . . . 3-53
3.6 INTRODUCTION . . . . . . . . . . . . 3-53
3.6.1 Conventional Lubricants . . . . . . . . 3-53
3.6.2 Solid Film Lubricants . . . . . . . . . . 3-54
3.6.3 Application of Conventional
Lubricants . . . . . . . . . . . . . . . . 3-54
SECTION IV PRESERVATION . . . . . . . . . . 3-56
3.7 INTRODUCTION . . . . . . . . . . . . 3-56
3.7.1 Operational Preservation . . . . . . . . 3-56
3.7.2 Non-Operational Preservation. . . . . 3-56
3.7.3 Types of CPC’s . . . . . . . . . . . . . . 3-56
3.7.4 Time Limitations of CPC’s . . . . . . 3-57
3.7.5 Description of CPC’s . . . . . . . . . . 3-57
3.7.6 Preservation of Specific Areas . . . . 3-64
3.7.7 Preservation Application
Methods . . . . . . . . . . . . . . . . . 3-64
3.8 APPLICATION OF POLISH AND
WAX . . . . . . . . . . . . . . . . . . . 3-64
4 INSPECTION AND CORROSION PRONE
AREAS. . . . . . . . . . . . . . . . . . . . . . . . . 4-1
SECTION I INSPECTION . . . . . . . . . . . . . 4-1
4.1 Purpose . . . . . . . . . . . . . . . . . . . 4-1
4.1.1 Responsibility . . . . . . . . . . . . . . . 4-1
4.1.2 Frequency of Inspections . . . . . . . . 4-1
4.1.3 General Inspections . . . . . . . . . . . 4-1
4.1.4 Detailed Inspections . . . . . . . . . . . 4-1
4.2 INSPECTION METHODS. . . . . . . 4-1
4.2.1 Visual inspection . . . . . . . . . . . . . 4-1
4.2.2 Depth Gauge . . . . . . . . . . . . . . . . 4-2
4.2.3 Visual Inspection with a
Borescope/Videoscope. . . . . . . . 4-3
4.2.4 Optical Depth Micrometers . . . . . . 4-3
4.2.5 Fluorescent Penetrant
Inspection . . . . . . . . . . . . . . . . 4-5
4.2.6 Eddy Current Inspection . . . . . . . . 4-6
4.2.7 Ultrasonic Inspection . . . . . . . . . . 4-6
4.2.8 Radiographic Inspection . . . . . . . . 4-6
4.3 EVALUATION OF CORROSION
DAMAGE. . . . . . . . . . . . . . . . 4-6
4.4 DEGREES OF CORROSION . . . . 4-6
4.4.1 Light Corrosion . . . . . . . . . . . . . . 4-9
4.4.2 Moderate Corrosion . . . . . . . . . . . 4-9
4.4.3 Severe Corrosion . . . . . . . . . . . . . 4-9
TO 1-1-691
TABLE OF CONTENTS - CONTINUED
ii Change 11
SECTION II CORROSION PRONE AREAS . 4-9
4.5 COMMON AREAS . . . . . . . . . . . 4-9
4.5.1 Fasteners. . . . . . . . . . . . . . . . . . . 4-9
4.5.2 Faying Surfaces and Crevices. . . . . 4-9
4.5.3 Spot Welded Assemblies . . . . . . . . 4-9
4.5.4 Engine Exhaust and Gun Gas Im-
pingement Areas . . . . . . . . . . . 4-10
4.5.5 Wheel Wells and Landing Gear . . . 4-10
4.5.6 Flap and Slat Recesses . . . . . . . . . 4-11
4.5.7 Engine Frontal Areas and Air Inlet
Ducts . . . . . . . . . . . . . . . . . . . 4-11
4.5.8 Wing/Fin-Fold Joints and Wing and
Control Surface Leading Edges . . . . . . . . . . . . . . . . . . . 4-14
4.5.9 Hinges . . . . . . . . . . . . . . . . . . . . 4-14
4.5.10 Control Cables. . . . . . . . . . . . . . . 4-14
4.5.11 Relief Tube Outlets. . . . . . . . . . . . 4-14
4.5.12 Water Entrapment Areas . . . . . . . . 4-14
4.5.13 Bilge Areas . . . . . . . . . . . . . . . . . 4-14
4.5.14 Battery Compartments and Battery
Vent Openings . . . . . . . . . . . . . 4-14
4.5.15 Magnesium Parts . . . . . . . . . . . . . 4-15
4.5.16 Electrical Connectors and Other
Components . . . . . . . . . . . . . . 4-15
4 CORROSION REMOVAL AND SURFACE
TREATMENT . . . . . . . . . . . . . . . . . . . . 4-0
SECTION I CORROSION REMOVAL . . . . . 5-1
5.1 PURPOSE. . . . . . . . . . . . . . . . . . 5-1
5.2 RESPONSIBILITY. . . . . . . . . . . . 5-1
5.3 CORRECTIVE ACTIONS. . . . . . . 5-1
5.4 PAINT REMOVAL. . . . . . . . . . . . 5-1
5.5 CORROSION REMOVAL. . . . . . . 5-1
5.5.1 Mechanical Methods . . . . . . . . . . . 5-2
5.5.2 Non-Powered Tools and
Materials. . . . . . . . . . . . . . . . . 5-2
5.5.3 Power Tools and Materials. . . . . . . 5-4
5.5.4 Abrasive Blasting . . . . . . . . . . . . . 5-7
5.6 SURFACE FINISH. . . . . . . . . . . . 5-11
5.7 PITTING ON CRITICAL
STRUCTURE . . . . . . . . . . . . . 5-11
5.8 CORROSION REMOVAL
PROCEDURES-MECHANICAL 5-11
5.8.1 Warnings and Cautions . . . . . . . . . 5-11
5.8.2 Non-Powered Mechanical Corrosion
Removal . . . . . . . . . . . . . . . . . 5-14
5.8.3 Powered Mechanical Corrosion
Removal . . . . . . . . . . . . . . . . . 5-15
5.8.4 Abrasive Blasting Corrosion
Removal . . . . . . . . . . . . . . . . . 5-15
5.9 CORROSION
REMOVAL-CHEMICAL. . . . . . 5-17
Chapter Page
5.9.1 Aluminum Alloys . . . . . . . . . . . . . 5-17
5.9.2 Magnesium Alloys . . . . . . . . . . . . 5-20
5.9.3 Ferrous Metal (Steel) Alloys Other
Than Stainless Steels
(CRES). . . . . . . . . . . . . . . . . . 5-21
5.9.4 Stainless Steel (CRES) and Nickel
Based Alloys . . . . . . . . . . . . . . 5-26
5.9.5 Copper and Copper Based
Alloys . . . . . . . . . . . . . . . . . . 5-30
5.9.6 Titanium and Titanium Based
Alloys . . . . . . . . . . . . . . . . . . 5-32
5.9.7 Plated and Phosphated Surfaces . . . 5-33
SECTION II SURFACE TREATMENT . . . . . 5-36
5.10 PURPOSE. . . . . . . . . . . . . . . . . . 5-36
5.10.1 Chemical Prepaint Treatments . . . . 5-36
5.10.2 Surface Preparation. . . . . . . . . . . . 5-38
5.10.3 Precautions . . . . . . . . . . . . . . . . . 5-38
5.10.4 Application of Surface
Treatments . . . . . . . . . . . . . . . 5-39
5.10.5 Notes on Conversion Coating/Sur-
face Treatment . . . . . . . . . . . . . 5-40
5.10.6 Post Treatment. . . . . . . . . . . . . . . 5-40
5.10.7 Temporary Preservation. . . . . . . . . 5-41
SECTION III SHOT PEENING . . . . . . . . . . 5-42
5.11 REQUIREMENTS FOR SHOT
PEENING. . . . . . . . . . . . . . . . 5-42
5.12 SHOT PEENING OF METAL
SURFACES. . . . . . . . . . . . . . . 5-42
5.12.1 Types of Peening . . . . . . . . . . . . . 5-42
5.12.2 Shot Peening Application. . . . . . . . 5-43
SECTION IV ROTO-PEENING. . . . . . . . . . 5-43
5.13 ROTO-PEENING (ROTARY FLAP
PEENING) . . . . . . . . . . . . . . . 5-43
5.13.1 Roto-Peening Procedures . . . . . . . . 5-44
5.13.2 Determining Peening/Intensity . . . . 5-45
5.13.3 Peening Process Preparation. . . . . . 5-46
5.13.4 Post Peening Surface Finish . . . . . . 5-46
6 SEALANTS . . . . . . . . . . . . . . . . . . . . . . . 6-1
6.1 PURPOSE. . . . . . . . . . . . . . . . . . 6-1
6.2 APPLICATIONS . . . . . . . . . . . . . 6-1
6.3 SEALING COMPOUNDS. . . . . . . 6-1
6.3.1 Sealant Packaging . . . . . . . . . . . . 6-1
6.3.2 Polysulfide, Polyurethane, and Poly-
thioether Sealing Compounds . . . . . . . . . . . . . . . 6-1
6.3.3 Silicone Sealing Compounds . . . . . 6-2
TO 1-1-691
Change 16 iii
6.3.4 Adhesion Promoters . . . . . . . . . . . 6-2
6.3.5 SAE AMS 3255 Oil and Water Re-
sistant, Expanded Polytetrafluoro-ethylene Sealing Tape (EPTFE) Skyflex . . . . . . . . . . . . . . . . . . 6-2
6.3.6 Av-Dec® Polyurethane Sealant
Tapes and Two Component Sealants . . . . . . . . . . . . . . . . . 6-2
6.4 EQUIPMENT . . . . . . . . . . . . . . . 6-2
6.4.1 Sealant Gun. . . . . . . . . . . . . . . . . 6-2
6.4.2 Application Nozzles . . . . . . . . . . . 6-3
6.4.3 Injection Gun . . . . . . . . . . . . . . . 6-3
6.4.4 Sealant Kits (Semkits®) . . . . . . . . 6-3
6.4.5 Sealant Removal and Application
Tools . . . . . . . . . . . . . . . . . . . 6-3
6.5 SEALANT MIXING. . . . . . . . . . . 6-3
6.5.1 Application Life. . . . . . . . . . . . . . 6-3
6.5.2 Storage Instructions . . . . . . . . . . . 6-4
6.5.3 Mixing MIL-PRF-81733, Type III
Sprayable Sealant Coating . . . . . 6-5
6.6 SEALANT APPLICATION
PROCEDURES . . . . . . . . . . . . 6-22
6.6.1 Cleaning . . . . . . . . . . . . . . . . . . . 6-22
6.6.2 Masking . . . . . . . . . . . . . . . . . . . 6-22
6.6.3 Adhesion Promoters . . . . . . . . . . . 6-25
6.6.4 Brush Spatula or Caulking Gun
Application . . . . . . . . . . . . . . . 6-25
6.6.5 Spray Gun Application . . . . . . . . . 6-26
6.6.6 Peel and Stick Application; SAE
AMS 3255 EPTFE Skyflex® and Av-Dec® HT3935-7 and HT3000 Sealing Tapes . . . . . . . . . . . . . 6-26
6.7 SEALING OF SPECIFIC
AREAS . . . . . . . . . . . . . . . . . 6-27
6.7.1 Faying Surface Sealing . . . . . . . . . 6-27
6.7.2 Fillet Sealing . . . . . . . . . . . . . . . . 6-28
6.7.3 Injection Sealing . . . . . . . . . . . . . 6-28
6.7.4 Fastener Sealing. . . . . . . . . . . . . . 6-29
6.7.5 Integral Fuel Cells/Tanks and Re-
movable Fuel Tanks . . . . . . . . . 6-29
6.7.6 Form-In-Place (FIP) Gasket Sealant
Repair . . . . . . . . . . . . . . . . . . 6-29
6.7.7 SAE AMS 3255 EPTFE (Skyflex®)
and Av-Dec® HT3000 and HT3935-7 Sealing Tape Gasket Repair . . . . . . . . . . . . . . . . . . 6-30
6.7.8 External Aircraft Structure . . . . . . . 6-31
6.7.9 Depressions . . . . . . . . . . . . . . . . . 6-31
6.7.10 Damaged Sealant . . . . . . . . . . . . . 6-31
6.7.11 Extensive Repair . . . . . . . . . . . . . 6-32
6.7.12 High Temperature Areas . . . . . . . . 6-32
6.7.13 Low Temperature Curing. . . . . . . . 6-32
6.8 STORAGE/SHELF LIFE CON-
TROL OF SEALANTS . . . . . . . 6-32
Chapter Page
7 TREATMENT OF SPECIFIC AREAS . . . . . . 7-1
7.1 INTRODUCTION . . . . . . . . . . . . 7-1
7.2 BATTERY COMPARTMENTS,
BOXES, AND ADJACENT
AREAS . . . . . . . . . . . . . . . . . 7-1
7.2.1 Preparation of Solutions for Clean-
ing and Neutralizing Battery Electrolytes . . . . . . . . . . . . . . . 7-1
7.2.2 Cleaning and Neutralizing
Procedures . . . . . . . . . . . . . . . 7-2
7.2.3 Paint Systems . . . . . . . . . . . . . . . 7-2
7.3 RELIEF TUBE AREAS . . . . . . . . 7-2
7.4 CORROSION TREATMENT FOR
STEEL CABLES . . . . . . . . . . . 7-3
7.5 PIANO TYPE HINGES . . . . . . . . 7-3
7.6 INTEGRAL AND EXTERNAL
FUEL TANKS AND DROP
TANKS . . . . . . . . . . . . . . . . . 7-3
7.6.1 Corrosion Removal and Rework of
Pitted Areas of Integral Fuel Tanks . . . . . . . . . . . . . . . . . . . 7-3
7.6.2 Removal of Corrosion and Rework
of Aluminum External Fuel Tanks/Drop Tanks. . . . . . . . . . . 7-4
7.7 FAYING SURFACES AND AT-
TACHMENT POINTS . . . . . . . 7-5
7.7.1 Faying Surfaces, Joints, and
Seams . . . . . . . . . . . . . . . . . . 7-5
7.7.2 Attaching Parts and Hardware . . . . 7-5
7.7.3 Severely Corroded (Rusted)
Hardware . . . . . . . . . . . . . . . . 7-6
7.8 NATURAL AND SYNTHETIC
RUBBER PARTS. . . . . . . . . . . 7-7
7.9 POTABLE WATER TANKS . . . . . 7-7
7.10 SURFACES AND COMPONENTS
EXPOSED TO EXHAUST
GASES, GUN GASES, AND
ROCKET BLAST . . . . . . . . . . 7-7
7.11 ELECTRICAL AND ELECTRONIC
EQUIPMENT . . . . . . . . . . . . . 7-7
7.11.1 Grounding and Bonding
Connections. . . . . . . . . . . . . . . 7-7
7.11.2 Conduit and Junction Boxes. . . . . . 7-7
7.11.3 Wires and Cables . . . . . . . . . . . . . 7-7
7.11.4 Deleted. . . . . . . . . . . . . . . . . . . . 7-7
7.11.5 Moisture and Fungus Proofing of
Electrical and Electronic Equipment. . . . . . . . . . . . . . . . 7-7
7.11.6 Antennas. . . . . . . . . . . . . . . . . . . 7-7
7.12 STRUCTURAL TUBING MEM-
BERS AND ASSEMBLIES . . . . 7-8
TO 1-1-691
iv Change 16
7.12.1 Structural Aluminum Alloy
Tubing . . . . . . . . . . . . . . . . . . 7-8
7.12.2 Structural Magnesium Alloy
Tubing . . . . . . . . . . . . . . . . . . 7-8
7.12.3 Structural Copper Alloys, Stainless
Steel (CRES) Alloys, and Heat Resistant Alloy Tubing . . . . . . . 7-8
7.12.4 Structural Carbon Steel Tubing. . . . 7-8
7.13 NON-STRUCTURAL TUBING
MEMBERS AND
ASSEMBLIES. . . . . . . . . . . . . 7-8
7.13.1 Aluminum Alloy Tubing . . . . . . . . 7-8
7.13.2 Stainless Steel (CRES) Tubing . . . . 7-9
7.13.3 Cadmium Plated Steel Tubing . . . . 7-10
7.13.4 Special Instructions for Tubing Fit-
tings and Sleeves . . . . . . . . . . . 7-10
7.13.5 Removable Installations. . . . . . . . . 7-10
7.14 CORROSION REMOVAL FROM
THIN METAL (0.0625 INCH
THICKNESS AND LESS). . . . . 7-11
7.15 AIR INTAKE DUCTS FOR JET
AIRCRAFT. . . . . . . . . . . . . . . 7-11
7.16 CLOSELY COILED SPRINGS . . . 7-11
7.17 CORROSION PREVENTION ON
ASSEMBLIES AND PARTS RE-
MOVED FROM AIRCRAFT
DURING MAINTENANCE, 30
DAY SHORT TERM STORAGE,
AND OVER 30 DAY LONG
TERM STORAGE
REQUIREMENTS . . . . . . . . . . 7-11
7.17.1 Short Term Storage. . . . . . . . . . . . 7-11
7.17.2 Long Term Storage. . . . . . . . . . . . 7-12
7.18 DEPLETED URANIUM
COUNTERWEIGHTS. . . . . . . . 7-12
7.18.1 Corrosion and Finish Damage Treat-
ment Procedures. . . . . . . . . . . . 7-13
7.19 MONEL RIVETS. . . . . . . . . . . . . 7-14
7.20 BERYLLIUM-COPPER ALLOYS,
BERYLLIUM-ALUMINUM AL-
LOYS, AND BERYLLIUM
OXIDE. . . . . . . . . . . . . . . . . . 7-14
7.20.1 Corrosion Removal and
Treatment . . . . . . . . . . . . . . . . 7-14
7.20.2 Depot Maintenance. . . . . . . . . . . . 7-14
7.21 EMI SEALS AND GASKETS . . . . 7-15
7.21.1 Treatment of EMI Seals and
Gaskets. . . . . . . . . . . . . . . . . . 7-15
8 EMERGENCY PROCEDURES . . . . . . . . . . 8-1
8.1 PURPOSE. . . . . . . . . . . . . . . . . . 8-1
8.2 RESPONSIBILITY. . . . . . . . . . . . 8-1
8.3 EMERGENCY
PREPARATIONS . . . . . . . . . . . 8-1
Chapter Page
8.3.1 Priority Removal List of Equipment
and/or Components. . . . . . . . . . 8-1
8.3.2 Emergency Reclamation Team . . . . 8-2
8.3.3 Emergency Reclamation
Equipment. . . . . . . . . . . . . . . . 8-2
8.3.4 Production Planning . . . . . . . . . . . 8-2
8.4 GENERAL PROCEDURES . . . . . . 8-2.1
8.4.1 Removal of Contaminated Installed
Equipment. . . . . . . . . . . . . . . . 8-8
8.4.2 Disassembly/Removal of
Components . . . . . . . . . . . . . . 8-8
8.4.3 Clean . . . . . . . . . . . . . . . . . . . . . 8-8
8.4.4 Tagging . . . . . . . . . . . . . . . . . . . 8-8
8.5 GENERAL CLEANING
PROCEDURES . . . . . . . . . . . . 8-8
8.5.1 Primary Method . . . . . . . . . . . . . . 8-9
8.5.2 Alternate Methods . . . . . . . . . . . . 8-9
8.5.3 Removing Fire Extinguishing Pow-
der (O-D-1407 Potassium Bicar-bonate [Purple K{PKP}], Sodium Bicarbonate, Ammonium Phos-phate Monobasic) and/or Other Dry Chemical Agents . . . . . . . . 8-10
8.5.4 Removing MIL-F-24385 Aqueous
Film Forming Foam (AFFF) Fire Extinguishing Agent and Other Synthetic Based Foaming Agents Including High-Expansion (Hi- Ex) Foams . . . . . . . . . . . . . . . 8-10
8.5.5 Removal of Carbon Dioxide (CO2), HFC-125, Halon and 3M NOVEC 1230 Fire Extinguishing Agents . . . . . . . . . . . . . . . . . . 8-11
8.5.6 Removal of Protein Type Foam and
Soda-Acid Fire Extinguishing Agents . . . . . . . . . . . . . . . . . . 8-11
8.5.7 Treatment After Landing on a
Foamed Runway . . . . . . . . . . . 8-11
8.5.8 Treatment After Exposure to Volca-
nic Ash. . . . . . . . . . . . . . . . . . 8-11
8.6 SPECIFIC INTERNAL
AREAS . . . . . . . . . . . . . . . . . 8-12
8.6.1 Aircraft Cockpit Area . . . . . . . . . . 8-12
8.6.2 Aircraft Ejection Seats . . . . . . . . . 8-12
8.6.3 Avionic, Electronic, and Electrical
Equipment. . . . . . . . . . . . . . . . 8-13
8.6.4 Photographic Equipment . . . . . . . . 8-13
8.6.5 Graphite or Carbon Fiber/Epoxy, Boron Fiber/Epoxy, and Tungsten Fiber/Epoxy Composite Materials. . . . . . . . . . . . . . . . . 8-13
8.7 SPECIFIC EXTERNAL AREAS OF
AIRCRAFT. . . . . . . . . . . . . . . 8-14
8.7.1 Airframes . . . . . . . . . . . . . . . . . . 8-14
8.7.2 Antennas. . . . . . . . . . . . . . . . . . . 8-14
TO 1-1-691
Change 16 v
8.7.3 Reciprocating Engines. . . . . . . . . . 8-14
8.7.4 Turbine Engines . . . . . . . . . . . . . . 8-15
8.7.5 Treatment for Engines Which Have
Ingested Fire Extinguishing Pow-der (Potassium Bicarbonate [Purple K{PKP}], Sodium Bicar-bonate, Ammonium Phosphate Monobasic) and/or Synthetic Foaming Agents (AFFF, Hi-Ex, AR) . . . . . . . . . . . . . . . . . . . . 8-15
8.7.6 Helicopter Transmission, Rotor
Head, and Rotor Hub . . . . . . . . 8-16
8.7.7 Helicopter Main and Tail Rotor
Blades . . . . . . . . . . . . . . . . . . 8-16
8.7.8 Armament . . . . . . . . . . . . . . . . . . 8-16
8.7.9 Aircraft Fuel Systems . . . . . . . . . . 8-17
9 SOUTHWEST ASIA ENVIRONMENTS . . . . 9-1
9.1 INTRODUCTION . . . . . . . . . . . . 9-1
9.1.1 Climatic Conditions . . . . . . . . . . . 9-1
9.1.2 Aircraft Wash . . . . . . . . . . . . . . . 9-1
9.1.3 Aircraft Clear Water Rinse
(CWR) . . . . . . . . . . . . . . . . . . 9-1
9.1.4 Effects of Desert Environment . . . . 9-1
9.2 PRE-DEPLOYMENT
RECOMMENDATIONS . . . . . . 9-1
9.3 RECOMMENDED ACTIONS
WHILE DEPLOYED . . . . . . . . 9-2
9.3.1 High Efficiency Particulate Air
(HEPA) Filtration . . . . . . . . . . . 9-2
9.3.2 Areas to be Checked and
Cleaned . . . . . . . . . . . . . . . . . 9-2
9.4 POST DEPLOYMENT . . . . . . . . . 9-3
9.5 CORROSION PREVENTIVE
COMPOUNDS (CPC’s) . . . . . . 9-3
9.5.1 Recommended CPC’s . . . . . . . . . . 9-3
10 REMOTELY PILOTED AIRCRAFT CORRO-
SION PREVENTION . . . . . . . . . . . . . . . 10-1
10.1 REMOTELY PILOTED AIRCRAFT
(RPA). . . . . . . . . . . . . . . . . . . 10-1
10.1.1 Definition . . . . . . . . . . . . . . . . . . 10-1
Chapter Page
10.2 CORROSION CONTROL
PROGRAM. . . . . . . . . . . . . . . 10-1
10.3 CARBON FIBER COMPOSITES
AND CORROSION . . . . . . . . . 10-1
10.3.1 Corrosion Concerns . . . . . . . . . . . 10-1
10.3.2 Moisture Absorption . . . . . . . . . . . 10-2
10.4 CORROSIVE
ENVIRONMENTS. . . . . . . . . . 10-2
10.5 APPROVED CLEANING
COMPOUNDS . . . . . . . . . . . . 10-2
10.5.1 MIL-PRF-87937, Type IV and MIL-
PRF-85570, Type II . . . . . . . . . 10-2
10.5.2 MIL-PRF-87937, Type III and MIL-
PRF-85570, Type V . . . . . . . . . 10-2
10.5.3 A-A-59921 (Formerly MIL-C-
43616), Class 1A Emulsion Cleaner. . . . . . . . . . . . . . . . . . 10-2
10.6 AIRCRAFT CLEANING. . . . . . . . 10-2
10.6.1 Frequency of Cleaning . . . . . . . . . 10-3
10.6.2 Wipe Down or Spot Cleaning. . . . . 10-3
APPENDIX A CONSUMABLE
MATERIALS. . . . . . . . . . . . . . . . . . . . . . A-1
A.1 INTRODUCTION . . . . . . . . . . . . A-1
A.1.1 Shelf Life . . . . . . . . . . . . . . . . . . A-1 A.1.2 Consumable Materials
Containers. . . . . . . . . . . . . . . . A-1 A.1.3 Local Purchase . . . . . . . . . . . . . . A-1 A.1.4 Local Environmental Laws and
Regulations . . . . . . . . . . . . . . . A-1 A.1.5 Unit of Issue Codes . . . . . . . . . . . A-1
APPENDIX B EQUIPMENT FOR CLEAN-
ING AND CORROSION PREVENTION
AND CONTROL . . . . . . . . . . . . . . . . . . . B-1
B.1 INTRODUCTION . . . . . . . . . . . . B-1
B.1.1 Unit of Issue Codes . . . . . . . . . . . B-1
GLOSSARY . . . . . . . . . . . . . . . . . . . . . Glossary 1
INDEX . . . . . . . . . . . . . . . . . . . . . . . . . Index 1
TO 1-1-691
vi Change 16
LIST OF ILLUSTRATIONS
Number PageTitle
2-1 Simplified Corrosion Cell . . . . . . . . . . . 2-2 2-2 Elimination of Corrosion by Application of an Organic Film to a Metal Surface . . . . . . . . . . . . . . . . . . . . . . 2-3
2-3 Effect of Sea Water on Galvanic Corrosion . . . . . . . . . . . . . . . . . . . . 2-3
2-4 Galvanic Corrosion in a Flashlight Battery . . . . . . . . . . . . . . . . . . . . . . 2-4
2-5 Effect of Area Relationship in Dissimilar Metal Contacts . . . . . . . . . . . . . . . . . 2-4
2-6 Galvanic Corrosion of Magnesium Adja-cent to a Steel Fastener . . . . . . . . . . . 2-5
2-7 Pitting of an Aluminum Wing Assembly . . . . . . . . . . . . . . . . . . . . 2-6
2-8 Cross-Section of Corrosion Pits . . . . . . . 2-6 2-9 Cross-Section of 7075-T6 Aluminum
Alloy . . . . . . . . . . . . . . . . . . . . . . . 2-7 2-10 Grain Structure of a Corroding Aluminum
Surface . . . . . . . . . . . . . . . . . . . . . . 2-7 2-11 Intergranular Corrosion of 7075-T6 Alumi-num Adjacent to Steel Fastener. . . . . . 2-7 2-12 Example of Exfoliation . . . . . . . . . . . . . 2-7 2-13 Another Example of Exfoliation . . . . . . . 2-7 2-14 Concentration Cell Corrosion . . . . . . . . . 2-9 2-15 Stress Corrosion Cracking . . . . . . . . . . . 2-9 2-16 Galvanic Series of Metals and Alloys in
Sea Water . . . . . . . . . . . . . . . . . . . . 2-10 2-17 Filiform Corrosion Found Under Paint
Coating on a Magnesium Panel. . . . . . 2-11 2-18 Schematic of the Development of Filiform
Corrosion on an Aluminum Alloy . . . . 2-11 2-19 Magnesium Corrosion Products. . . . . . . . 2-12 2-20 Steel Corrosion Products (Rust) . . . . . . . 2-13 2-21 Aluminum Surface Corrosion
Products . . . . . . . . . . . . . . . . . . . . . 2-14 2-22 Cadmium Plated Surface Conditions . . . . 2-15 2-23 Failed Chromium Plating . . . . . . . . . . . . 2-17 3-1 Foam Generating Cleaning Unit (15
Gallons) . . . . . . . . . . . . . . . . . . . . . 3-30 3-2 Foam Generating Cleaning Unit (45
Gallons) . . . . . . . . . . . . . . . . . . . . . 3-31 3-3 Universal Wash Unit . . . . . . . . . . . . . . . 3-32 3-4 Top Loading Type . . . . . . . . . . . . . . . . 3-36 3-5 Front Loading Type . . . . . . . . . . . . . . . 3-36 3-6 Use of Aircraft Washing Applicator . . . . . 3-40 3-7 Aircraft Cleaning Procedure . . . . . . . . . . 3-41 3-8 Automatic Water Spray Nozzle . . . . . . . . 3-44 4-1 Depth Dimension of Corrosion Pits . . . . . 4-4 4-2 Fiber Optic Borescope. . . . . . . . . . . . . . 4-4 4-3 Optical Depth Micrometer (Analog Me-chanical Read Out Type) . . . . . . . . . . 4-7 4-4 Optical Depth Micrometer (Digital Read
Out Type) . . . . . . . . . . . . . . . . . . . . 4-8
Number PageTitle
4-5 Typical Use of a Straight Edge to Deter-mine if Suspect Areas Have Been Pre-viously Reworked . . . . . . . . . . . . . . . 4-9
4-6 Corrosion Around Fasteners . . . . . . . . . . 4-10 4-7 Galvanic Corrosion of Aluminum Adjacent to Steel Fasteners . . . . . . . . . . . . . . . 4-10 4-8 Spot Weld Corrosion . . . . . . . . . . . . . . . 4-11 4-9 Spot Welded Skin Corrosion
Mechanism . . . . . . . . . . . . . . . . . . . 4-11 4-10 Gun Blast Area Corrosion Points. . . . . . . 4-12 4-11 Exhaust Trail Area Corrosion Points . . . . 4-12 4-12 F-15 Nose Landing Gear Wheel Well . . . 4-12 4-13 Flaps Lowered to Expose Recess
Areas . . . . . . . . . . . . . . . . . . . . . . . 4-12 4-14 Reciprocating Engine Frontal Area Corro-sion Points. . . . . . . . . . . . . . . . . . . . 4-13 4-15 Jet Engine Frontal Area Corrosion
Points . . . . . . . . . . . . . . . . . . . . . . . 4-13 4-16 Corrosion Prone Point of Air Inlet. . . . . . 4-13 4-17 Corrosion in Air Intake Duct . . . . . . . . . 4-14 4-18 Wing Fold Joint . . . . . . . . . . . . . . . . . . 4-15 4-19 Hinge Corrosion Points . . . . . . . . . . . . . 4-16 4-20 Piano Hinge Lugs . . . . . . . . . . . . . . . . . 4-16 4-21 Control Cables . . . . . . . . . . . . . . . . . . . 4-16 4-22 Personnel Relief Tube Vent . . . . . . . . . . 4-16 4-23 Common Water Entrapment Areas. . . . . . 4-17 4-24 Bilge Areas . . . . . . . . . . . . . . . . . . . . . 4-17 4-25 Battery Compartment . . . . . . . . . . . . . . 4-18 5-1 3M Co. Scotch-BriteTM Flap Brush and
Mandrel . . . . . . . . . . . . . . . . . . . . . 5-4 5-2 Abrasive Flap Wheels with Spindle
Mount. . . . . . . . . . . . . . . . . . . . . . . 5-4 5-3 3M Co. Radial Bristle Disc . . . . . . . . . . 5-5 5-4 3M Co. Roloc Discs . . . . . . . . . . . . . . . 5-6 5-5 3M Co. Inline Bristle Disc . . . . . . . . . . . 5-7 5-6 Abrasive Blasting Equipment . . . . . . . . . 5-10 5-7 Shaping Reworked Areas . . . . . . . . . . . . 5-13 5-8 Acceptable Clean-Up of Pitting Corrosion on Critical Structure . . . . . . . . . . . . . 5-13 5-9 Limited Clearance. . . . . . . . . . . . . . . . . 5-14 5-10 A Water-Break Free Surface Compared with One with Breaks . . . . . . . . . . . . 5-40 5-11 Magnetic Almen Strip Holder . . . . . . . . . 5-46.1 5-12 “A” Test Strip Magnetic to SAE J442 Stri-pholder Arc Height Conversion Graph . . . . . . . . . . . . . . . . . . . . . . . 5-47
5-13 “A” Test Strip Arc Height Magnetic to SAE J442 Stripholder Conversion Chart, 0.001 Inch . . . . . . . . . . . . . . . 5-48
Change 16 vii
5-14 “N” Arc Height Magnetic to SAE J442 Stripholder Conversion Graph. . . . . . . 5-49
5-15 “N” Arc Height Magnetic to SAE J442 Stripholder Conversion Chart, 0.001 Inch . . . . . . . . . . . . . . . . . . . . . . . . 5-50
5-16 Arc Height Plotting Chart . . . . . . . . . . . 5-51 5-17 Example of Coverage . . . . . . . . . . . . . . 5-52 5-18 Flap Deflection Ranges . . . . . . . . . . . . . 5-53 6-1 Pneumatic Sealant Gun . . . . . . . . . . . . . 6-6 6-2 Sealant Application Nozzles . . . . . . . . . . 6-7 6-3 Countersink Application Nozzles. . . . . . . 6-8 6-4 Rivet Application Nozzles . . . . . . . . . . . 6-9 6-5 Sealant and Adhesive Smoothing
Tools . . . . . . . . . . . . . . . . . . . . . . . 6-10 6-6 Sealant Injection Guns. . . . . . . . . . . . . . 6-11 6-7 Injection Style Semkit®. . . . . . . . . . . . . 6-12 6-8 Non-Metallic Spatula . . . . . . . . . . . . . . 6-26 6-9 Faying Surface Sealing . . . . . . . . . . . . . 6-28 6-10 Typical Fillet Seal. . . . . . . . . . . . . . . . . 6-29 6-11 Typical Injection Seal . . . . . . . . . . . . . . 6-30 6-12 Typical Methods of Sealing Fasteners . . . 6-31
Number PageTitle
6-13 Typical Lap Skin Sealing . . . . . . . . . . . . 6-33 6-14 Sealing Procedures for Typical Aircraft
Fitting. . . . . . . . . . . . . . . . . . . . . . . 6-34 6-15 Typical Spar Cap Sealing. . . . . . . . . . . . 6-35 6-16 Sealing of Access Doors . . . . . . . . . . . . 6-36 7-1 Beryllium-Copper Spiral Contact with En-vironmental Fluorosilicone Seal . . . . . 7-16 7-2 Dorsal Longeron EMI Seal . . . . . . . . . . 7-17 7-3 Stainless Steel (CRES) EMI Screen. . . . . 7-17 7-4 Bonding Cable from Airframe to Graphite/
Epoxy Avionics Bay Door . . . . . . . . . 7-18 7-5 EMI Bonding Washers in an Avionics
Bay . . . . . . . . . . . . . . . . . . . . . . . . 7-19 9-1 Soil Makeup in the SWA Area . . . . . . . . 9-2 9-2 Global Dust Producing Regions . . . . . . . 9-2 9-3 Open Circuit Board. . . . . . . . . . . . . . . . 9-3 B-1 Back Mounted Full Facepiece
Respirator . . . . . . . . . . . . . . . . . . . . B-43 B-2 Front Mounted Full Facepiece
Respirator . . . . . . . . . . . . . . . . . . . . B-44 B-3 Hooded Air Respirator System . . . . . . . . B-45
LIST OF TABLES
Number PageTitle
2-1 Corrosion of Metals - Type of Attack and Appearance of Corrosion Products . . . 2-15
3-1 Aircraft Wash Intervals . . . . . . . . . . . . . 3-2 3-2 Cleaning of Specific Areas and
Components. . . . . . . . . . . . . . . . . . . 3-12 3-3 Deicing/Anti-Icing Fluid Residue Inspec-tion and Cleaning Procedures . . . . . . . 3-28 3-4 Recommended Dilution of Low Tempera-ture Cleaner . . . . . . . . . . . . . . . . . . . 3-45 3-4.1 Fungus Growth Removal from Organic
Materials . . . . . . . . . . . . . . . . . . . . . 3-47 3-5 Common Military Greases and Their
Uses . . . . . . . . . . . . . . . . . . . . . . . . 3-55 3-6 Time Limitations for CPC’s . . . . . . . . . . 3-57 3-7 Corrosion Preventive Compounds . . . . . . 3-57 3-8 Preservation of Specific Areas and
Components. . . . . . . . . . . . . . . . . . . 3-60 4-1 NDI Inspection Tools for Various Types of
Corrosion . . . . . . . . . . . . . . . . . . . . 4-2 5-1 Grades of Abrasive Mats . . . . . . . . . . . . 5-3 5-2 Grades of Steel Wool . . . . . . . . . . . . . . 5-3 5-3 Recommended Powered Abrasives for
Corrosion Removal . . . . . . . . . . . . . . 5-8 5-4 Recommended Non-Powered Abrasives for
Corrosion Removal . . . . . . . . . . . . . . 5-10 5-5 Typical Chemical Corrosion Removal Pro-cedures for Aluminum Alloy Parts and Assemblies . . . . . . . . . . . . . . . . . . . 5-18
Number PageTitle
5-6 Typical Chemical Corrosion Removal Pro-cedures for Magnesium Alloys . . . . . . 5-22
5-7 Typical Chemical Corrosion Removal Pro-cedures for Ferrous Metals Other Than Stainless Steel (CRES) . . . . . . . . . . . 5-26
5-8 Typical Chemical Corrosion Removal Pro-cedures for Stainless Steel (CRES) and Nickel Based Alloys . . . . . . . . . . . . . 5-28
5-9 Control of Corrosion Removal/Pickling Action of Nitric-Acid-Hydrofluoric Solutions . . . . . . . . . . . . . . . . . . . . . 5-30
5-10 Typical Chemical Corrosion Removal Pro-cedures for Copper and Copper Alloys. . . . . . . . . . . . . . . . . . . . . . . 5-32
5-11 Typical Chemical Corrosion Removal of Titanium and Titanium Base Alloys. . . . . . . . . . . . . . . . . . . . . . . 5-34
5-12 Typical Chemical Corrosion Removal Pro-cedures for Plated and Phosphated Surfaces . . . . . . . . . . . . . . . . . . . . . 5-36
5-13 Prepaint Treatments for Metal Surfaces . . . . . . . . . . . . . . . . . . . . . 5-41
5-14 Tool Speed Operation Requirements . . . . 5-44 5-15 Standard Peening Intensity (Isp) for Com-plete Coverage Arc-Height (All Num-bers in Inches) . . . . . . . . . . . . . . . . . 5-45
6-1 Sealing Compounds . . . . . . . . . . . . . . . 6-13
TO 1-1-691
LIST OF ILLUSTRATIONS - CONTINUED
viii Change 16
6-2 Time Requirements for Sealants When Used at 75° F (24° C) and 50%
RH. . . . . . . . . . . . . . . . . . . . . . . . . 6-22
8-1 Priority Guide for Emergency Treatment of Aircraft, Missiles, and Equipment . . . . . . . . . . . . . . . . . . . . 8-3
8-2 Suggested List of Emergency Reclamation Items . . . . . . . . . . . . . . . . . . . . . . . 8-3
Number PageTitle
10-1 Air Force RPA Tiers . . . . . . . . . . . . . . . 10-1 A-1 Unit of Issue Codes . . . . . . . . . . . . . . . A-1 A-2 Consumable Materials . . . . . . . . . . . . . . A-2 B-1 Unit of Issue Codes . . . . . . . . . . . . . . . B-1 B-2 Equipment for Cleaning and Corrosion
Prevention and Control . . . . . . . . . . . B-2
TO 1-1-691
LIST OF TABLES - CONTINUED
Change 11 ix/(x blank)
INTRODUCTION
1 PURPOSE.
The purpose of this manual is to provide information on materials and procedures for the prevention and repair of corrosion damage to aircraft and missile weapon systems and related equipment. Supervisory and maintenance personnel shall use this manual as a guide for all corrosion control and maintenance efforts. Contractors who maintain and repair corrosion of aircraft, missiles, and related equipment shall also use this manual. Use this manual in conjunction with and in support of the appropriate systems specific aircraft, missile, or equipment technical orders (TO’s). In the case of a conflict between this manual and a systems specific air-craft, missile, or equipment manual, the system specific manual shall take precedence over this manual. Paragraph 6 lists related technical publications used by personnel in-volved in cleaning and corrosion control.
2 SCOPE.
The material in this manual provides basic cleaning, corro-sion prevention and control, and corrective maintenance in-formation to be used at organizational, intermediate, and de-pot levels. This manual is divided into eight chapters, two appendices, a glossary, and an alphabetical index. Chapter 1 explains the appropriate usage of this manual. Chapter 2 ex-plains what corrosion is, why it occurs, the various forms it can take, and how to recognize it. Chapter 3 outlines ac-cepted procedures, methods, and materials to be used in maintenance cleaning in Section I, lubrication in Section II, and preservation in Section III of aircraft, missiles, and re-lated equipment. Chapter 4 describes inspection techniques for detecting corrosion in Section I and discusses corrosion prone areas in Section II. Chapter 5 outlines the approved methods for the removal of corrosion damage in Section I and the application of surface treatments in Section II. Chap-ter 6 covers recommended materials and procedures for the application of sealing compounds to aircraft, missile, and related equipment structures. Chapter 7 describes the recom-mended procedures for treating and protecting against corro-sion in specific areas. Chapter 8 outlines emergency proce-dures to be followed after exposure of aircraft to salt water, fire extinguishing chemicals, etc., Appendix A lists the rec-ommended materials for cleaning, corrosion prevention, sur-face treatment, and preservation of aircraft, missiles, and re-lated equipment. Appendix B lists equipment used for cleaning, corrosion removal, conversion coating, and sealing of aircraft, as well as associated safety equipment including personal protective equipment (PPE) for these operations.
3 LIST OF ABBREVIATIONS AND ACRONYMS.
All abbreviations used in this manual are in accordance with
ASME Y14.38.
AFCPCO Air Force Corrosion Prevention and Con-trol Office
AFFF Aqueous Film Forming Foam AFPHIS Animal and Plant Health Inspection Ser-vices AISI American Iron and Steel Institute AOR Area of Responsibility BOD Biological Oxygen Demand CaCO3 Calcium Carbonate CaSO4.2H2O Anhydrous Calcium Sulfate CBR Chemical, Biological, Radiological CBRNE Chemical, Biological, Radiological, Nuclear, and High-Yield Explosive CC Cubic Centimeters CFM Cubic Feet Per Minute CPC Corrosion Preventive Compounds CRES Corrosion Resistant Steels CrO3 Chromic Acid CWR Clear Water Rinse °C Degrees Celsius °F Degrees Fahrenheit DFT Dry Film Thickness DI Deionized DTIC Defense Technical Information Center EA Each EPA Environmental Protection Agency EPTFE Expanded Polytetrafluoroethylene ft Foot/Feet FIP Form-In-Place HAP Hazardous Air Pollutants HCFC Hydrochlorofluorocarbon HEPA High Efficiency Particulate Air ID Inside Diameter in Inch IVD Ion Vapor Deposited KSI Kilograms per Square Inch LG Landing Gear LOX Liquid Oxygen MEK Methyl Ethyl Ketone mg/L Milligrams per Liter mm Hg Millimeters of Mercury MOS Maximum Operating Speed NDI Non-Destructive Inspection NRA Nuclear Regulatory Agency NSN National Stock Number OD Outside Diameter ODC Ozone Depleting Compounds
Change 17 xi
ODS Ozone Depleting Substances PDM Program Depot Maintenance pH Potential of Hydrogen PMB Plastic Media Blast PMF Pre-Mixed and Frozen PN Part Number PPE Personal Protective Equipment ppm Parts Per Million PSI Pounds Per Square Inch QPD Qualified Products Database QPL Qualified Products List RH Relative Humidity RPM Rotations Per Minute RTU Ready-To-Use SDS Safety Data Sheets SE Support Equipment SLED Shelf Life Extension Document SPD System Program Director SPM System Program Manager SWA Southwest Asia TDS Total Dissolved Solids TNP Touch-N-PrepTM
TO Technical Order TPH Total Petroleum Hydrocarbon TSS Total Suspended Solids VOC Volatile Organic Compound
4 RELATED PUBLICATIONS.
NOTE
When searching Technical Order (TO) numbers in the Enhanced Technical Information Management System (ETIMS) catalog, please use the wildcard (*) after typing in the TO number. Many TOs are not available in paper format, (i.e., digital (WA-1) or Compact Disk (CD-1)). This ensures TOs in all media formats will populate the search.
The following publications contain information in support of this technical manual.
List of Related Publications
Number Title AFI 20-114 Air and Space Equipment
Structural Management AFI 32-1067 Water Systems AFI 32-7001 Environmental Management
List of Related Publications - Continued
Number Title AFI 40-201 Managing Radioactive Mate-rials in the U.S. Air Force AFI 23-101 AF Material Management AFMAN 10-2503 Operations in a Chemical, Biological, Radiological, Nuclear, and High-Yield Ex-plosive (CBRNE) Environ-ment
AFMAN 24-204-IP Preparing Hazardous Materi-als for Military Air Ship-ments
AFMAN 91-223 Aviation Safety Investiga-tions and Reports
AF-PAM 91-212 Bird/Wildlife Aircraft Strike Hazard (BASH) Manage-ment Techniques
AFI 91-203 Air Force Consolidated Oc-cupational Safety Instruction
ASME Y14.38 Abbreviations and Acronyms for Use on Drawings and Related Documents
DOD 4140.27-M Shelf Life Management Manual
DOD 6050.5LR Hazardous Material Control and Management (HMC&M)
MIL-HDBK-729 Corrosion and Corrosion Prevention-Metals
TO 00-5-1 AF Technical Order System TO 00-20-1 Aerospace Equipment Main-tenance Inspection, Docu-mentation, Policy and Proce-dures
TO 00-20-2 Maintenance Data Documen-tation
TO 00-25-107 Maintenance Assistance TO 00-25-172 Ground Servicing of Aircraft and Static Grounding/Bond-ing
TO 00-25-234 General Shop Practice Re-quirements for the Repair, Maintenance, and Test of Electronic Equipment
TO 00-25-235 Safety Procedures and Equipment for Confined Space Entry (Including Mis-sile Propellant Tanks) xii Change 17
List of Related Publications - Continued
Number Title TO 00-35D-54 USAF Material Deficiency
Reporting and Investigating System
TO 00-85A-03-1 Preservation, Packaging and Packing - External Aircraft Fuel Tanks, Fuel Cells
TO 00-110A-1 Guidelines for Identification and Handling of Aircraft and Material Contaminated with Radioactive Debris (Fallout)
TO 1-1-3 Inspection and Repair of Aircraft Integral Tanks and Fuel Cells
TO 1-1-8 Application and Removal of Organic Coatings, Aerospace and Non-Aerospace Equip-ment
TO 1-1-17 Storage of Aircraft and Mis-siles Systems
TO 1-1-24 Maintenance Repair and Electrical Requirements for Fiberglass Airborne Ra-domes
TO 1-1-689-1 Cleaning and Corrosion Control, Volume I, Corrosion Program and Corrosion Theory
TO 1-1-689-3 Cleaning and Corrosion Control, Volume III, Avion-ics and Electronics
TO 1-1-689-5 Cleaning and Corrosion Control, Volume V, Consum-able Materials and Equip-ment for Avionics
TO 1-1-690 General Advanced Compos-ite Repair Processes
TO 1-1A-1 Engineering H/B Series for Aircraft Repair - General Manual for Structural Repair
TO 1-1A-8 Engineering Manual Series for Aircraft and Missiles Repair Structural Hardware
TO 1-1A-9 Engineering Series for Air-craft Repair Aerospace Metal General Data and Usage Factors
TO 1-1A-12 Fabrication, Maintenance and Repair of Transparent Plastic
TO 1-1A-14 Installation Practices for Air-craft Electric and Electronic Wiring
List of Related Publications - Continued
Number Title TO 1-1A-15 General Maintenance In-structions for Support Equip-ment (SE)
TO 2-1-111 Standard Maintenance Prac-tices, Navy, USAF and Army, P&W Aircraft En-gines
TO 2J-1-13 Cleaning of Gas Turbine Aircraft Engines and Parts
TO 2J-1-18 Preparation for Shipment and Storage of Gas Turbine Engines
TO 2J-1-32 Standard Maintenance Prac-tice Instructions - GE Air-craft Engines, Model TF-34-
GE-100, A, -400, A, B,
TF58-GE-3, -5, -8B, -10,
-16, -100 (USCG), -400B,
-402, T64-GE-6B, -7, A,
100, -413, -415, -416, -416A, F404-GE-400,
YF404-GE-400, F110-GE-
400, YT700-GE-401, T700-
GE-401, 4
TO 4B-1-32 Maintenance and O/H In-structions - All Type Aircraft Brakes
TO 4S-1-182 General O/H & Maintenance Instr. All FSC 1620 Landing Gear & Components
TO 4W-1-61 Operation, Service, and Maintenance Instructions-All Aircraft Wheels
TO 10-1-179 Corrosion Control Manual for Photographic Equipment
TO 13A1-1-1 Repair, Cleaning, Inspection and Testing Aircraft Safety Belts, Shoulder Harness, and Miscellaneous Personnel Restraint Equipment
TO 31-1-221 Field Instructions for Paint-ing and Preserving Electron-ics Command Equipment
TO 33B-1-1 Nondestructive Inspection Methods
TO 34-1-3 Inspection and Maintenance of Machinery and Shop Equipment
TO 35-1-3 Corrosion Prevention, Paint-ing, and Marking of USAF Support Equipment (SE)
Change 11 xiii
List of Related Publications - Continued
Number Title TO 35-1-4 Processing and Inspection of
Support Equipment for Stor-age and Shipment
TO 36-1-191 Technical and Managerial Reference for Motor Vehicle Maintenance
TO 42A1-1-1 Evaluation and Service Test-ing of Materials - Cleaning, Painting, Sealing, Protective Treating, Anti-Corrosion, Inspection Materials, and Related Items
TO 42A3-1-2 General Use of Cements, Sealants, and Coatings
List of Related Publications - Continued
Number Title TO 42B-1-6 Corrosion Preventive Lubri-cants and Anti-Seize Com-pounds
TO 42C-1-2 Anti-Icing, Deicing, and De-frosting of Parked Aircraft
TO 42C-1-12 Quality Control of Chemi-cals
TO 42C2-1-7 Electro Deposition of Metals and Metal Surface Treat-ments to Meet Air Force Maintenance Requirements xiv Change 11
1 RECORD OF APPLICABLE TIME COMPLIANCE
TECHNICAL ORDERS (TCTOS).
List of Time Compliance Technical Orders
TCTO
Number
TCTO
Title
TCTO
Date
None
2 HARDNESS CRITICAL ITEMS (HCI).
The HCI symbol ( ) establishes special require-ments limiting changes and substitutions and that the specific parts listed must be used to ensure hardness is not degraded.
If included, items with nuclear survivability requirements are marked with the HCI symbol ( ). All changes to, or pro-posed substitutions of, HCIs must be approved by the ac-quiring activity.
3 ELECTROSTATIC DISCHARGE SENSITIVE
(ESDS) ITEMS.
All ESDS parts shall be handled in accordance with the ESDS device handling procedures in TO 00-25-234.
If included, items containing ESDS parts are marked with the ESDS symbol ( ).
4 RESPONSIBILITY FOR CHANGES TO THIS
MANUAL.
This manual is maintained for technical content by the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .