Attachment 05 AF form 66 11.12.2024.pdf

PDF 787 KB Posted

Attached to
B1130 HVAC Study Commissioning Federal contract opportunity
Solicitation number
FA480325R0003
Issued by
Department of the Air Force Air Combat Command

About this file

This is an AF Form 66 Schedule of Material Submittals for Project B1130 Commissioning (Project Number VLSB 25-0022) under Solicitation No. F38604-99-1480/FA480325R0003. The form outlines four required submittals for the HVAC commissioning project: 1) Construction Schedule due within 1 week of Notice to Proceed (NTP), 2) Commissioning Plan, 3) Collected Data, and 4) Final report with corrections and recommendations.

The form is divided into two sections - one to be completed by the Project Engineer and another by the Contract Administrator. It includes columns for tracking various submittal requirements including certifications, shop drawings, samples, manufacturer's information, and approval status. The form appears to be a blank template with no entries completed in the tracking columns, suggesting it is being used to communicate submittal requirements to contractors rather than showing completed submissions.

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. F38604-99-1480 Attachment 6

PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:

SCHEDULE OF MATERIAL SUBMITTALS

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C

A

TI

O N

O F

C O

M P

LI

A

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

P

LE

S

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

ER

'S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

ER

'S

W A

R R

A N

TY

C A

TA

LO

G D

A

TA

O P

ER

A

TI

N

G

IN

ST

R

U C

TI

O

N S

O

TH

ER

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

N D

A

TE

D A

TE

R

EC

EI

V

ED

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

SU

B

M

IT

TA

L

N U

M B

ER

S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

A C

TO

R

R

ES

U B

M

IT

TA

L

FI

N

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

Construction Schedule x Within 1 week of

NTP

Commissioning Plan x

Collected Data x

Final report with corrections and recommendations x

B1130 Commissioning

TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER

VLSB 25-0022

AF FORM 66 (Computer Generated) PAGE 1 of 2

Attachment 5

FA480325R0003

Solicitation No. F38604-99-1480 Attachment 6

PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:

SCHEDULE OF MATERIAL SUBMITTALS

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C

A

TI

O N

O F

C O

M P

LI

A

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

P

LE

S

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

ER

'S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

ER

'S

W A

R R

A N

TY

C A

TA

LO

G D

A

TA

O P

ER

A

TI

N

G

IN

ST

R

U C

TI

O

N S

O

TH

ER

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

N D

A

TE

D A

TE

R

EC

EI

V

ED

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

SU

B

M

IT

TA

L

N U

M B

ER

S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

A C

TO

R

R

ES

U B

M

IT

TA

L

FI

N

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

B1130 Commissioning

TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER

VLSB 25-0022

AF FORM 66 (Computer Generated) PAGE 2 of 2

Attachment 5

FA480325R0003

File details come from the government source that posted it. Updated .