This is an AF Form 66 Schedule of Material Submittals for Project B1130 Commissioning (Project Number VLSB 25-0022) under Solicitation No. F38604-99-1480/FA480325R0003. The form outlines four required submittals for the HVAC commissioning project: 1) Construction Schedule due within 1 week of Notice to Proceed (NTP), 2) Commissioning Plan, 3) Collected Data, and 4) Final report with corrections and recommendations.
The form is divided into two sections - one to be completed by the Project Engineer and another by the Contract Administrator. It includes columns for tracking various submittal requirements including certifications, shop drawings, samples, manufacturer's information, and approval status. The form appears to be a blank template with no entries completed in the tracking columns, suggesting it is being used to communicate submittal requirements to contractors rather than showing completed submissions.
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. F38604-99-1480 Attachment 6
PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:
SCHEDULE OF MATERIAL SUBMITTALS
LI
N
E N
U M
B
ER
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C
A
TI
O N
O F
C O
M P
LI
A
N C
E
SH
O
P D
R A
W
IN
G S
SA
M
P
LE
S
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
ER
'S
R
EC
O M
M
EN
D A
TI
O
N S
M A
N U
FA
C
TU
R
ER
'S
W A
R R
A N
TY
C A
TA
LO
G D
A
TA
O P
ER
A
TI
N
G
IN
ST
R
U C
TI
O
N S
O
TH
ER
R
EQ
U
IR
ED
S
U B
M
IS
SI
O
N D
A
TE
D A
TE
R
EC
EI
V
ED
IN
C
O N
TR
A
C
TI
N G
D A
TE
T
O C
IV
IL
E N
G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
SU
B
M
IT
TA
L
N U
M B
ER
S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
A C
TO
R
R
ES
U B
M
IT
TA
L
FI
N
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPROVED
Construction Schedule x Within 1 week of
NTP
Commissioning Plan x
Collected Data x
Final report with corrections and recommendations x
B1130 Commissioning
TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER
VLSB 25-0022
AF FORM 66 (Computer Generated) PAGE 1 of 2
Attachment 5
FA480325R0003
Solicitation No. F38604-99-1480 Attachment 6
PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:
SCHEDULE OF MATERIAL SUBMITTALS
LI
N
E N
U M
B
ER
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C
A
TI
O N
O F
C O
M P
LI
A
N C
E
SH
O
P D
R A
W
IN
G S
SA
M
P
LE
S
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
ER
'S
R
EC
O M
M
EN
D A
TI
O
N S
M A
N U
FA
C
TU
R
ER
'S
W A
R R
A N
TY
C A
TA
LO
G D
A
TA
O P
ER
A
TI
N
G
IN
ST
R
U C
TI
O
N S
O
TH
ER
R
EQ
U
IR
ED
S
U B
M
IS
SI
O
N D
A
TE
D A
TE
R
EC
EI
V
ED
IN
C
O N
TR
A
C
TI
N G
D A
TE
T
O C
IV
IL
E N
G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
SU
B
M
IT
TA
L
N U
M B
ER
S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
A C
TO
R
R
ES
U B
M
IT
TA
L
FI
N
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPROVED
B1130 Commissioning
TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER
VLSB 25-0022
AF FORM 66 (Computer Generated) PAGE 2 of 2
Attachment 5
FA480325R0003
File details come from the government source that posted it. Updated .