This document contains a material submittals schedule template for a federal construction project. The template includes columns for the project and contract numbers, item descriptions, required submission dates from the contractor, dates the submittals were received and sent to the civil engineering team for review, return suspense dates, submittal numbers, and dates for approval or disapproval notifications to the contractor. The related federal contract opportunity is a solicitation by the 325th Contracting Squadron at Tyndall AFB, Florida to complete repair work outlined in the statement of work on the base's marina infrastructure. The solicitation number, project name, opportunity type, issuing agency, and a brief description are provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA481920R00240004 SF 30.pdf | ||
| Porter Corp Specs.pdf | ||
| Marina Site Visit Attendees.pdf | ||
| FA481920R0024 Repair Marina Infrastructure QA.docx | DOCX document | |
| Solicitation Amendment - FA481920R00240003.pdf | ||
| Exterior Finish Pallettes.pdf | ||
| Solicitation Amendment - FA481920R00240002.pdf | ||
| Solicitation - FA481920R0024 Amendment 0001.pdf | ||
| Attachment 07 Sample RFI.PDF | ||
| Attachment 06 AF3065.pdf | ||
| Solicitation - FA481920R0024.pdf | ||
| Attachment 08 Wage Determination (FL20200005).pdf | ||
| Attachment 02 Criteria Drawings.pptx | PPTX presentation | |
| Attachment 05 AF 3064.pdf | ||
| Attachment 01 SOW Repair Marina Infrastructure.pdf | ||
| Attachment 04 AF Form 3000.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| [ enter here ] | Project Title: | ||
| [ enter here ] | Solicitation / Contract Number: |
[ enter here ]
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||
| Number of Copies Required | Remarks | |||||||||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Manufacturer's Warranty | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Submittal Numbers | Date Contractor | ||||
| Notified | Contractor Resubmittal | Final Approval | ||||||||||||||||||||
| Approved | Disapproved | |||||||||||||||||||||
| 1 | ||||||||||||||||||||||
| 2 | ||||||||||||||||||||||
| 3 | ||||||||||||||||||||||
| 4 | ||||||||||||||||||||||
| 5 | ||||||||||||||||||||||
| 6 | ||||||||||||||||||||||
| 7 | ||||||||||||||||||||||
| 8 | ||||||||||||||||||||||
| 9 | ||||||||||||||||||||||
| 10 | ||||||||||||||||||||||
| 11 | ||||||||||||||||||||||
| 12 | ||||||||||||||||||||||
| 13 | ||||||||||||||||||||||
| 14 | ||||||||||||||||||||||
| 15 | ||||||||||||||||||||||
| 16 | ||||||||||||||||||||||
| 17 | ||||||||||||||||||||||
| 18 | ||||||||||||||||||||||
| 19 | ||||||||||||||||||||||
| 20 | ||||||||||||||||||||||
| 21 | ||||||||||||||||||||||
| 22 | ||||||||||||||||||||||
| 23 | ||||||||||||||||||||||
| 24 | ||||||||||||||||||||||
| 25 |
&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).
&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
File details come from the government source that posted it. Updated .