Attachment 02 Criteria Drawings.pptx
PPTX presentation 9 MB Posted
- Attached to
- Repair Marina Infrastructure Federal contract opportunity
- Solicitation number
- FA481920R0024
About this file
This document package outlines the scope of work for repairing marina infrastructure at Tyndall AFB in Florida. The work includes demolishing and reconstructing boat slips, finger piers, boardwalks, pavilions, dry storage areas, and a boat ramp. It also involves installing a new floating dock system with 40 slips and cleaning debris from the water. The project will be completed in five tasks - boat slips and boardwalks, dry storage, boat ramp repairs, debris removal, and a new floating dock. Construction will include installing new pilings, decking, utilities, lighting, and other accessories at the boat slips and boardwalks. The dry storage area will receive fencing, gates, gravel, and pavilions. Repairs to the boat ramp include a new dock section and hardware. The 325th Contracting Squadron at Tyndall AFB is soliciting proposals for completing the work outlined in the statement of work by the dates specified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA481920R00240004 SF 30.pdf | ||
| Porter Corp Specs.pdf | ||
| Marina Site Visit Attendees.pdf | ||
| FA481920R0024 Repair Marina Infrastructure QA.docx | DOCX document | |
| Solicitation Amendment - FA481920R00240003.pdf | ||
| Exterior Finish Pallettes.pdf | ||
| Solicitation Amendment - FA481920R00240002.pdf | ||
| Solicitation - FA481920R0024 Amendment 0001.pdf | ||
| Attachment 07 Sample RFI.PDF | ||
| Attachment 06 AF3065.pdf | ||
| Solicitation - FA481920R0024.pdf | ||
| Attachment 08 Wage Determination (FL20200005).pdf | ||
| Attachment 03 AF Form 66.xls | XLS spreadsheet | |
| Attachment 05 AF 3064.pdf | ||
| Attachment 01 SOW Repair Marina Infrastructure.pdf | ||
| Attachment 04 AF Form 3000.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CRITERIA DRAWINGS: TASK 1 – BOAT SLIPS, BOARDWALK & PAVILLIONS (25 May 2020)
DEMOLITION
#1 Remove existing piles #2 Remove remaining piles, decking & framing #13 to #30 Remove remaining piles, decking & framing #31 to #32 Remove 8 damaged piles & framing #33 & #34 Remove decking, framing & damaged utility boxes #35 Remove broken deck boards & damaged utility boxes #36 Remove decking & framing #37 Remove all framing (Posts & columns remain)
DEMOLITION SCOPE KEY
1 Remove dock boxes 2 Remove decking & mounted items 3 Remove framing 4 Remove existing piles 5 Remove power pedestal/light riser 6 Remove hose bibs & water pipe 7 Remove 400A power panel 8 Remove power lines; panel to transformer 9 Remove table & bench framing (Posts Remain)
CONSTRUCTION
#1 Install new floating dock #3 to #10 Install new finger piers similar to existing #11 to #12 Install new finger pier (on existing piles) #13 to #30 Install new piles & finger piers #13 to #30 Install new piles & finger piers #33 to #34 Install new utility boxes and deck similar to existing #35 Install new decking & utility boxes were removed #36 Install new decking and railing #37 Reconstruct picnic table and shelter with metal roof #38 Install new raised deck with railing for weigh station #39 Install raised deck with railing, stairs and ramp
Dock Box @ Each Slip Typ.
130 SF Fish Cleaning Station w/ Sink
110 SF Fish Cleaning Station w/Sink
8’x8’ Pavilion 400A Power Panel
Power/Light Pedestal Typ.
Power/Light Pedestal Typ.
Power/Light Pedestal Typ.
8’x8’ Pavilion 400A Power Panel
Slip Water Typ.
24’X2’ Finger Pier, typ.
Dock Box @ Each Slip Typ.
Slip Water Typ.
1,2,3,5,6
2,3,4
2,3
1,2*,5*,6*
1,2*,5*,6*
1*,2*,5*,6*
3,9
7,8
7,8
7,8
3,9
3,9
1,2,3,5,6
2,3,4
2,3,4
2,3,5,6
2,3,4*
2,3
2,3,4,5,6
2,3,4*,5,6
* Areas in which demo is limited to damaged items only Boat Ramp Dock See Task 3
Dry Storage See Task 2 Water Debris Clean up See Task 4
CRITERIA DRAWINGS: TASK 1 – BOAT SLIPS, BOARDWALK & PAVILLIONS (25 May 2020)
Cleaning Station w/ Sink
Cleaning Station w/Sink
Power/Light Pedestal Typ.
Power/Light Pedestal Typ.
Power/Light Pedestal Typ.
8’x8’ Pavilion 400A Power Panel
Slip Water Typ.
24’X2’ Finger Pier, typ.
Dock Box @ Each Slip Typ.
Slip Water Typ.
8,9
8,9
8,9
CONSTRUCTION SCOPE KEY
1 Install new 2’x24’ finger piers similar to existing 2 Install new fish cleaning station with sink & roof similar to existing 3 Install new 2’x24’ finger piers on existing piles 4 Install new boardwalk 5 Repair existing boardwalk 6 Install deck box for each slip 7 Install hose bib and power pedestal/light riser for each slip similar to existing.
4,7
8 Install new 400A power panel 9 Install 4-500 MCM CU from transformer to each panel 10 Repair pavilion & picnic table Install metal railing 6 Motorized boat lifts, replace piles with ones that extend to new roof structure. Utilize existing lifts at Bonita Bay Marina if possible. To be built to a similar design as lifts at Bonita Bay.
5,6,7
5,6,7
5,6,7
5,6,7
4,6,7
4,6,7
Dry Storage See Task 2
Boat Ramp Dock See Task 3 Water Debris Clean up See Task 4
NOTES
Finger piers shall match the previously rehabilitated finger piers with rub rails and docking hardware.
All fasteners shall be stainless steel.
Finger pier piles shall be 10”x10” prestressed concrete with minimum 12 ft embedment.
Lumber shall be treated in accordance with AWPA Use Category System.
All decking shall be composite to match existing.
Fish cleaning stations shall include sink, plumbing, roof and lighting.
Missing/broken shore power posts & boxes shall be replaced similar to existing.
See Statement of Work for additional requirements.
CRITERIA DRAWINGS: TASK 2 – Dry Storage (25 May 2020)
Additional Details None None None None Black vinyl coated chain link fencing, posts to be concreted into ground.
None None No digging planned All pavilions will have concrete pad (4” dig depth), picnic bench and grill. All pavilions will meet Installation Facility Standard None None None 4800 sqft of new gravel road at 3” dig depth, other 4800 sqft is utilizing existing dry storage lot gravel area None
DEMOLITION SCOPE KEY
Remove existing damaged fencing Remove remaining rubble in area
CONSTRUCTION SCOPE KEY
Install approximately 1700 ft of 7ft fencing Install Keypad entry/Auto vehicle gate (14ft opening, sliding) Install vehicle gate (14ft opening) Re-gravel lot (average added depth approximately 2”)
Install two poles for volleyball net, bury poles 4ft Install 6-10X10 Pavilions, 1-20X40 Pavilion, Install pedestrian gate (4ft wide) Install power to large pavilion, power for 4 lights, 4 outlets. Tap marina slip power Install gravel road, 20ft wide, 480 ft long, 10 ft of that width utilizes existing gravel dry storage area View blocking fencing , utilizing slats inserted into chain link fence design Wood poles with standard electric utility lighting, overhead. No digging planned Existing structures do not require new gravel
1,5
2,8
Notes See statement of work for additional requirements
Finger Piers See Task 1
CRITERIA DRAWINGS: TASK 3 –REPAIR BOAT RAMP (25 May 2020)
NOTES
Lumber shall be treated in accordance with AWPA Use Category System.
Pile embedment 12’ min Decking & edging to match the fueling station materials Docking hardware to include strakes, bumpers and cleats
Boardwalk See Task 1
DEMOLITION SCOPE KEY
Remove remaining dock framing (piles remain)
CONSTRUCTION SCOPE KEY
Install 4 new timber piles similar to existing Install new 5’x50’ dock framing Install composite decking and aluminum edging Install docking hardware Repair ramp panel subsidence Install rip rap at perimeter of ramp panels
Ele. 0.00 Finger Piers See Task 1 5’x50’ Dock at Ramp
CRITERIA DRAWINGS: TASK 4 –Water Debris Clean up (25 May 2020)
DEMOLITION SCOPE KEY
Remove debris seen during construction, method cannot be dredging Identified points are known points of possible debris
CRITERIA DRAWINGS: TASK 5 – 40 Slip Floating Dock (25 May 2020)
Floating dock system, lighting, electrical and plumbing components shall be similar to previous Piles shall have minimum 12 ft embedment.
Lumber shall be treated in accordance with AWPA Use Category System.
Decking (if used) shall be composite to match Marina decking.
Gangway shall be aluminum Project provide complete restoration of docks
(2) 400A Power Panels
Sleeved Timber Piles Typ.
Water & Shore Power Each Slip Typ.
Double PWC Port 2” Water Line 1” Water Line Water & Shore Power Each Slip Typ.
4 - 500 MCM in 4” Conduit
Typ. all slips
DEMOLITION SCOPE KEY
Remove (64) damaged piles Remove remaining dock utilities Remove 400A power panel Remove 600 ft 4-500mcm (panel to transformer)
Install 600 ft 4-500mcm (panel to transformer) Install new 400A power panel Install 64 new sleeved timber piles Install new EZ Dock similar to existing Install (1) corner storage box at each slip Install accessories at each slip: edging, bumpers & cleats Install power riser with light at each slip Install hose bib at each slip Install double PWC Port
EZ Dock – 40 Slip Floating Dock System
Typ. all slips
Typ. all slips
Typ. all slips image1.png image2.png image3.emf image4.png image5.png image6.png image7.png