This document provides details for a federal solicitation seeking offers for repair work at an airfield parking ramp. The solicitation requests offers to mill and overlay 15 parking spots, restripe pavement, reseal joints, and conduct Portland cement concrete and related repairs at the Joint Base Charleston Aircraft Parking Ramp in South Carolina. A pre-proposal site visit will be held on July 7, 2020 at 9:00 AM EST at the base's visitor control center, with questions due by July 10, 2020 at 12:00 PM EST. The work includes airfield paving services. The soliciting agency is the Department of the Air Force Air Mobility Command.
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF Form 66
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER 1069775 | PROJECT TITLE Repair Aircraft Parking Ramp - Phase I | SOLICITATION/CONTRACT NO. FA441815D0006 / FA441819FA045 | ||||||||||||||||
| TO BE COMPLETED BY THE PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||||||
| NO. OF COPIES REQUIRED | |||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL (Ref spec & para no.) | SD-01 PRECONSTRUCTION SUBMITTALS | SD-02 SHOP DRAWINGS | SD-03 PRODUCT DATA | SD-04 SAMPLES | SD-05 DESIGN DATA | SD-06 TEST REPORTS | SD-07 CERTIFICATES | SD-08 MANUFACTURER'S INSTRUCTIONS | SD-09 MANUFACTURER'S FIELD REPORTS | SD-10 OPERATION & MAINTENANCE DATA | SD-11 CLOSEOUT SUBMITTALS | OTHERS AS SPECIFIED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE |
TO
CIVIL
| ENGINEERING | RETURN SUSPENSE DATE | FOLLOW UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||||||||||
| APPROVED | DISAPPROVED | |||||||||||||||
| 1 | 01 11 00, Para 1.4.2, "Outage Requests"; G | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 2 | 01 11 00, Para 1.4.2, "Road Closure Requests"; G | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 3 | 01 11 00, Para 1.4, "Work Clearance"; G | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 4 | 01 14 00, Para 1.2.1.1, "List of Contact Personnel"; G | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 5 | 01 30 00, Para 1.2, "View Location Map"; G | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 6 | 01 30 00, Para 1.3, "Progress and Completion Pictures"; G | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 7 | 01 30 00, Para 1.5.2, "Resume for the proposed Superintendent"; G | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 8 | 01 32 16.00 20, Para 1.2, "Qualifications"; G | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 9 | 01 32 16.00 20, Para 1.3, "Project Schedule"; G | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 10 | 01 32 16.00 20, Para 1.4.1, "Initial Contract Progress Report (AF IMT 3065)"; G | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 11 | 01 32 16.00 20, Para 1.4.2, "Initial Contract Progress Schedule (AF IMT 3064)"; G | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 12 | 01 32 16.00 20, Para 1.3.3, "Project Schedule Updates"; G | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 13 | 01 32 16.00 20, Para 1.4.1, "Monthly Contract Progress Reports (AF IMT 3065)"; G | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 14 | 01 32 16.00 20, Para 1.4.2, "Monthly Contract Progress Schedules (AF IMT 3064)"; G | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 15 | 01 33 00, Para 1.6, "Submittal Register"; G | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 16 | 01 35 13, Para 3.1.2, "Heavy Equipment and Vehicle List" | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 17 | 01 35 13, Para 3.1.2, "Existing Conditions Survey" | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 18 | 01 35 13, Para 3.1.2, "Construction Operations Plan" | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 19 | 01 35 13, Para 3.1.2, "Safety Plan" | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 20 | 01 35 13, Para 3.1.2, "Schedule of Work" | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 21 | 01 35 23, Para 1.4, "Safety Plan Compliance Document (SPCD)"; G | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 22 | 01 35 26, Para 1.6, "Accident Prevention Plan (APP)"; G | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 23 | 01 35 26, Para 1.7, "Activity Hazard Analysis (AHA)"; G | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 24 | 01 35 26, Para 1.11, "Notifications and Reports" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 25 | 01 35 26, Para 1.11.2, "Accident Reports"; G | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 26 | 01 35 26, Para 1.8.1, "Confined Space Entry Permit" | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 27 | 01 35 26, Para 1.8.1, "Hot Work Permit" | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 28 | 01 45 00, Para 1.6, "QC Plan"; G | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 29 | 01 50 00, Para 1.3, "Construction Site Plan"; G | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 30 | 01 50 00, Para 3.4.1, "Traffic Control Plan"; G | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 31 | 01 50 00, Para 1.4, "Backflow Preventers" | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 32 | 01 50 00, Para 2.2.4, "Backflow Preventer Tests" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 33 | 01 50 00, Para 1.4.1, "Backflow Tester" | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 34 | 01 50 00, Para 1.4, "Backflow Preventers" | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 35 | 01 54 00.00 31, Para 1.5.2.1, "Affirmative Procurement Reporting Form"; G | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 36 | 01 57 19.00 31, Para 1.7.1, "Preconstruction Survey"; G | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 37 | 01 57 19.00 31, Para 1.8.3, "Regulatory Notifications"; G | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 38 | 01 57 19.00 31, Para 1.5, "Environmental Protection Plan"; G | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 39 | 01 57 19.00 31, Para 1.6, "Dirt and Dust Control Plan"; G | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 40 | 01 57 19.00 31, Para 3.8.2, "Disposal Requirements" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 41 | 01 57 19.00 31, Para 1.8.4, "Erosion and Sediment Control Inspection Reports" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 42 | 01 57 19.00 31, Para 1.8.5, "Solid Waste Disposal Report"; G | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 43 | 01 57 19.00 31, Para 1.8.2, "Contractor 40 CFR employee training records"; G | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 44 | 01 57 19.00 31, Para 1.8, "Waste Determination Documentation" | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 5 | ||||
| 45 | 01 57 19.00 31, Para 3.6.2, "Waste Determination Documentation" | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 5 | ||||
| 46 | 01 57 19.00 31, Para 1.8.1, "Disposal Documentation for Hazardous and Regulated Waste" | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 5 | ||||
| 47 | 01 57 19.00 31, Para 1.8.2, "Contractor 40 CFR Employee Training Records" | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 5 | ||||
| 48 | 01 57 19.00 31, Para 1.7.2, "Solid Waste Disposal Permit" | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 5 | ||||
| 49 | 01 57 19.00 31, Para 1.8.5, "Solid Waste Disposal Report" | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 5 | ||||
| 50 | 01 57 19.00 31, Para 3.6.2, "Hazardous Waste/Debris Management" | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 5 | ||||
| 51 | 01 57 19.00 31, Para 1.8.3, "Regulatory Notifications" | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 5 | ||||
| 52 | 01 57 20.00 31, Para , "Material Safety Data Sheets (MSDS)" | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 53 | 01 57 20.00 31, Para 1.8, "Green Procurement" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 54 | 01 57 20.00 31, Para 1.8, "Green Procurement" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 55 | 01 57 20.00 31, Para 1.3, "Recycling Report" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 56 | 01 57 20.00 31, Para 1.3, "Recycling Report" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 57 | 01 74 19.00 31, Para 1.3.3, "Construction Waste Management Plan"; G | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 58 | 01 78 00, Para 1.5.1, "Warranty Management Plan" | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 59 | 01 78 00, Para 1.5.4, "Warranty Tags" | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 60 | 01 78 00, Para 1.4, "Spare Parts Data" | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 61 | 01 78 00, Para 3.9, "Preventative Maintenance" | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | ||||
| 62 | 01 78 00, Para 3.9, "Condition Monitoring" | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | ||||
| 63 | 01 78 00, Para 3.9, "Inspection" | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | ||||
| 64 | 01 78 00, Para 1.5.1, "Instructions" | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | ||||
| 65 | 01 78 00, Para 3.7, "Operation and Maintenance Manuals"; G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | ||||
| 66 | 01 78 00, Para 3.1, "As-Built Drawings"; G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 5 | ||||
| 67 | 01 78 00, Para 3.3, "Record Drawings"; G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 5 | ||||
| 68 | 01 78 00, Para 2.1, "Record GIS Data"; G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 5 | ||||
| 69 | 01 78 00, Para 3.6, "As-Built Record of Equipment and Materials" | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 5 | ||||
| 70 | 01 78 00, Para 3.4, "Final Approved Shop Drawings" | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 5 | ||||
| 71 | 01 78 00, Para 3.5, "Construction Contract Specifications" | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 5 | ||||
| 72 | 01 78 00, Para 3.1, "Interim DD FORM 1354"; G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 5 | ||||
| 73 | 01 78 00, Para 3.1, "Checklist for DD FORM 1354"; G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 5 | ||||
| 74 | 02 41 00, Para 1.2.2, "Demolition Plan"; G | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 75 | 02 41 00, Para 1.1, "Existing Conditions" | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 76 | 02 41 00, Para 1.6, "Notification"; G | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 77 | 03 30 53, Para 1.4, "Installation Drawings"; G | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 78 | 03 30 53, Para 2.2.3.1, "Air-Entraining Admixture" | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 79 | 03 30 53, Para 2.2.3.2, "Water-Reducing or Retarding Admixture" | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 80 | 03 30 53, Para 2.2.9, "Curing Materials" | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 81 | 03 30 53, Para 2.2.6, "Expansion Joint Filler Strips | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 82 | 03 30 53, Para 3.1.3.3, "Batching and Mixing Equipment" | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 83 | 03 30 53, Para 3.2, "Conveying and Placing Concrete" | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 84 | 03 30 53, Para 2.2.7, "Formwork" | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 85 | 03 30 53, Para 2.3, "Mix Design Data"; G | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 86 | 03 30 53, Para 2.3, "Ready-Mix Concrete" | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 87 | 03 30 53, Para 2.2.5, "Mechanical Reinforcing Bar Connectors" | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 88 | 03 30 53, Para 2.2.2, "Aggregates" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 89 | 03 30 53, Para 2.1.3, "Concrete Mixture Proportions"; G | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 90 | 03 30 53, Para 3.8.3, "Compressive Strength Testing"; G | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 91 | 03 30 53, Para 3.8.3, "Slump"; G | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 92 | 03 30 53, Para 3.8.3, "Air Content" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 93 | 03 30 53, Para 2.2.4, "Water" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 94 | 03 30 53, Para 2.2.1, "Cementitious Materials" | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 95 | 03 30 53, Para 2.2.1.2, "Pozzolan" | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 96 | 03 30 53, Para 2.2.2, "Aggregates" | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 97 | 03 30 53, Para 2.3, "Delivery Tickets" | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 98 | 32 01 11.51, Para 1.3, "Mechanical paint removal equipment" | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 99 | 32 01 11.51, Para 1.4, "Test Section Results" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 100 | 32 01 19, Para 3.1, "Equipment" | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 101 | 32 01 19, Para 1.3.1, "Materials"; G | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 102 | 32 01 19, Para 1.3.1, "Certified Copies of the Test Reports"; G | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 103 | 32 01 29.61, Para 1.4.1, "Concrete Mix Design" | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 104 | 32 01 29.61, Para 2.1.4.1, "Concrete Mix Design" | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 105 | 32 01 29.61, Para 2.1.10, "Rigid Proprietary Repair Products" | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 106 | 32 01 29.61, Para 2.1.11, "Polymeric Proprietary Repair Products" | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 107 | 32 01 29.61, Para 2.1.5.1, "Pigmented Liquid Membrane-Forming Compound" | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 108 | 32 01 29.61, Para 2.1.5.1, "Pigmented Liquid Membrane-Forming Compound" | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 109 | 32 01 29.61, Para 2.1.10.6, "Aggregate Service Record" | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 110 | 32 01 29.61, Para 3.5.1, "Absorbent Curing Material" | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 111 | 32 01 29.61, Para 2.1.8, "Joint Filler" | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 112 | 32 01 29.61, Para 2.1.7, "Joint Sealant" | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 113 | 32 01 29.61, Para 1.4.1, "Concrete Mix Design" | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 114 | 32 01 29.61, Para 2.1.4.1, "Concrete Mix Design" | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 115 | 32 01 29.61, Para 1.4.1, "Test Results" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 116 | 32 01 29.61, Para 1.4.1.2, "Gradation" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 117 | 32 01 29.61, Para 2.1.1.4, "Gradation" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 118 | 32 01 29.61, Para 1.4.1.1, "Cement" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 119 | 32 01 29.61, Para 2.1.4.1, "Slump" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 120 | 32 01 29.61, Para 2.1.4.1, "Air Content" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 121 | 32 01 29.61, Para 2.1.10.1, "Compressive Strength" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 122 | 32 01 29.61, Para 1.4.2, "Mixer Calibration and Efficiency" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 123 | 32 01 29.61, Para 1.4.2, "Concrete Uniformity" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 124 | 32 01 29.61, Para 2.1.10.2, "Bond Strength" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 125 | 32 01 29.61, Para 2.1.11, "Polymeric Proprietary Repair Products" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 126 | 32 01 29.61, Para 1.4.1.1, "Cement" | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 127 | 32 01 29.61, Para 1.4.1.2, "Aggregate" | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 128 | 32 01 29.61, Para 2.1.3, "Admixtures" | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 129 | 32 01 29.61, Para 3.5.1, "Absorbent curing material" | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 130 | 32 01 29.61, Para 2.1.5.1, "Pigmented Liquid Membrane-Forming Compound" | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 131 | 32 01 29.61, Para 2.1.5.1, "Pigmented Liquid Membrane-Forming Compound" | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 132 | 32 01 29.61, Para 2.1.8, "Joint Filler" | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 133 | 32 01 29.61, Para 2.1.7, "Joint Sealant" | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 134 | 32 12 13, Para 3.7, "Sampling and Testing" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 135 | 32 12 15.13, Para 2.1, "Placement Plan"; G | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 136 | 32 12 15.13, Para 2.1.6, "Diamond Grinding Plan"; G | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 137 | 32 12 15.13, Para 2.4, "Mix Design"; G | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 138 | 32 12 15.13, Para 3.1, "Contractor Quality Control"; G | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 139 | 32 12 15.13, Para 2.2, "Aggregates" | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 140 | 32 12 15.13, Para 2.3, "Asphalt Cement Binder" | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 141 | 32 12 15.13, Para 2.4.1, "Warm-mix Additive" | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 142 | 32 12 15.13, Para 2.2, "Aggregates"; G | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 143 | 32 12 15.13, Para 3.1.3.10, "QC Monitoring" | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 144 | 32 12 15.13, Para 2.3, "Asphalt Cement Binder"; G | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 145 | 32 12 15.13, Para 3.7, "Testing Laboratory" | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 146 | 32 12 15.13, Para 2.4.1, "Warm-mix Additive" | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 147 | 32 17 23, Para 2.1.2, "Application Equipment List"; G | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 148 | 32 17 23, Para 3.2, "Exterior Surface Preparation" | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 149 | 32 17 23, Para 1.3.1, "Safety Data Sheets"; G | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 150 | 32 17 23, Para 2.2.2.1, "Reflective media for airfields"; G | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 151 | 32 17 23, Para 2.2.1, "Waterborne Paint"; G | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 152 | 32 17 23, Para 2.2.2.1, "Reflective Media for Airfields"; G | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 153 | 32 17 23, Para 2.2.1, "Waterborne Paint"; G | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | ||||
| 154 | 32 17 23, Para 1.3.2, "Qualifications"; G | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 155 | 32 17 23, Para 2.2.2.1, "Reflective Media for Airfields" | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 156 | 32 17 23, Para 2.2.1, "Waterborne Paint" | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 157 | 32 17 23, Para 1.3.1, "Volatile Organic Compound"; G | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 0 | ||||
| 158 | 32 17 23, Para 2.2.1, "Waterborne Paint"; G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 0 | 0 |
&CPAGE &P OF &N
&L&"Arial Narrow,Bold"&8AF Form 66&"Arial Narrow,Regular"
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
Import Data from SpecsIntact Import Data from SpecsIntact
Data
| 01 11 00 | 1.4.2 | "Outage Requests" | 1 | G | |
| 01 11 00 | 1.4.2 | "Road Closure Requests" | 1 | G | |
| 01 11 00 | 1.4 | "Work Clearance" | 1 | G | |
| 01 14 00 | 1.2.1.1 | "List of Contact Personnel" | 1 | G | |
| 01 30 00 | 1.2 | "View Location Map" | 1 | G | |
| 01 30 00 | 1.3 | "Progress and Completion Pictures" | 1 | G | |
| 01 30 00 | 1.5.2 | "Resume for the proposed Superintendent" | 1 | G | |
| 01 32 16.00 20 | 1.2 | "Qualifications" | 1 | G | |
| 01 32 16.00 20 | 1.3 | "Project Schedule" | 1 | G | CENM |
| 01 32 16.00 20 | 1.4.1 | "Initial Contract Progress Report (AF IMT 3065)" | 1 | G | CENM |
| 01 32 16.00 20 | 1.4.2 | "Initial Contract Progress Schedule (AF IMT 3064)" | 1 | G | CENM |
| 01 32 16.00 20 | 1.3.3 | "Project Schedule Updates" | 7 | G | CENM |
| 01 32 16.00 20 | 1.4.1 | "Monthly Contract Progress Reports (AF IMT 3065)" | 7 | G | |
| 01 32 16.00 20 | 1.4.2 | "Monthly Contract Progress Schedules (AF IMT 3064)" | 7 | G | |
| 01 33 00 | 1.6 | "Submittal Register" | 1 | G | |
| 01 35 13 | 3.1.2 | "Heavy Equipment and Vehicle List" | 1 | ||
| 01 35 13 | 3.1.2 | "Existing Conditions Survey" | 1 | ||
| 01 35 13 | 3.1.2 | "Construction Operations Plan" | 1 | ||
| 01 35 13 | 3.1.2 | "Safety Plan" | 1 | ||
| 01 35 13 | 3.1.2 | "Schedule of Work" | 1 | ||
| 01 35 23 | 1.4 | "Safety Plan Compliance Document (SPCD)" | 1 | G | |
| 01 35 26 | 1.6 | "Accident Prevention Plan (APP)" | 1 | G | |
| 01 35 26 | 1.7 | "Activity Hazard Analysis (AHA)" | 1 | G | |
| 01 35 26 | 1.11 | "Notifications and Reports" | 6 | ||
| 01 35 26 | 1.11.2 | "Accident Reports" | 6 | G | |
| 01 35 26 | 1.8.1 | "Confined Space Entry Permit" | 7 | ||
| 01 35 26 | 1.8.1 | "Hot Work Permit" | 7 | ||
| 01 45 00 | 1.6 | "QC Plan" | 1 | G | |
| 01 50 00 | 1.3 | "Construction Site Plan" | 1 | G | |
| 01 50 00 | 3.4.1 | "Traffic Control Plan" | 1 | G | |
| 01 50 00 | 1.4 | "Backflow Preventers" | 3 | ||
| 01 50 00 | 2.2.4 | "Backflow Preventer Tests" | 6 | ||
| 01 50 00 | 1.4.1 | "Backflow Tester" | 7 | ||
| 01 50 00 | 1.4 | "Backflow Preventers" | 7 | ||
| 01 54 00.00 31 | 1.5.2.1 | "Affirmative Procurement Reporting Form" | 3 | G | |
| 01 57 19.00 31 | 1.7.1 | "Preconstruction Survey" | 1 | G | |
| 01 57 19.00 31 | 1.8.3 | "Regulatory Notifications" | 1 | G | |
| 01 57 19.00 31 | 1.5 | "Environmental Protection Plan" | 1 | G | |
| 01 57 19.00 31 | 1.6 | "Dirt and Dust Control Plan" | 1 | G | |
| 01 57 19.00 31 | 3.8.2 | "Disposal Requirements" | 6 | ||
| 01 57 19.00 31 | 1.8.4 | "Erosion and Sediment Control Inspection Reports" | 6 | ||
| 01 57 19.00 31 | 1.8.5 | "Solid Waste Disposal Report" | 6 | G | |
| 01 57 19.00 31 | 1.8.2 | "Contractor 40 CFR employee training records" | 7 | G | |
| 01 57 19.00 31 | 1.8 | "Waste Determination Documentation" | 11 | ||
| 01 57 19.00 31 | 3.6.2 | "Waste Determination Documentation" | 11 | ||
| 01 57 19.00 31 | 1.8.1 | "Disposal Documentation for Hazardous and Regulated Waste" | 11 | ||
| 01 57 19.00 31 | 1.8.2 | "Contractor 40 CFR Employee Training Records" | 11 | ||
| 01 57 19.00 31 | 1.7.2 | "Solid Waste Disposal Permit" | 11 | ||
| 01 57 19.00 31 | 1.8.5 | "Solid Waste Disposal Report" | 11 | ||
| 01 57 19.00 31 | 3.6.2 | "Hazardous Waste/Debris Management" | 11 | ||
| 01 57 19.00 31 | 1.8.3 | "Regulatory Notifications" | 11 | ||
| 01 57 20.00 31 | "Material Safety Data Sheets (MSDS)" | 1 | |||
| 01 57 20.00 31 | 1.8 | "Green Procurement" | 6 | ||
| 01 57 20.00 31 | 1.8 | "Green Procurement" | 6 | ||
| 01 57 20.00 31 | 1.3 | "Recycling Report" | 6 | ||
| 01 57 20.00 31 | 1.3 | "Recycling Report" | 6 | ||
| 01 74 19.00 31 | 1.3.3 | "Construction Waste Management Plan" | 1 | G | |
| 01 78 00 | 1.5.1 | "Warranty Management Plan" | 3 | ||
| 01 78 00 | 1.5.4 | "Warranty Tags" | 3 | ||
| 01 78 00 | 1.4 | "Spare Parts Data" | 3 | ||
| 01 78 00 | 3.9 | "Preventative Maintenance" | 8 | ||
| 01 78 00 | 3.9 | "Condition Monitoring" | 8 | ||
| 01 78 00 | 3.9 | "Inspection" | 8 | ||
| 01 78 00 | 1.5.1 | "Instructions" | 8 | ||
| 01 78 00 | 3.7 | "Operation and Maintenance Manuals" | 10 | G | |
| 01 78 00 | 3.1 | "As-Built Drawings" | 11 | G | |
| 01 78 00 | 3.3 | "Record Drawings" | 11 | G | |
| 01 78 00 | 2.1 | "Record GIS Data" | 11 | G | A |
| 01 78 00 | 3.6 | "As-Built Record of Equipment and Materials" | 11 | ||
| 01 78 00 | 3.4 | "Final Approved Shop Drawings" | 11 | ||
| 01 78 00 | 3.5 | "Construction Contract Specifications" | 11 | ||
| 01 78 00 | 3.1 | "Interim DD FORM 1354" | 11 | G | |
| 01 78 00 | 3.1 | "Checklist for DD FORM 1354" | 11 | G | |
| 02 41 00 | 1.2.2 | "Demolition Plan" | 1 | G | |
| 02 41 00 | 1.1 | "Existing Conditions" | 1 | ||
| 02 41 00 | 1.6 | "Notification" | 7 | G | |
| 03 30 53 | 1.4 | "Installation Drawings" | 2 | G | |
| 03 30 53 | 2.2.3.1 | "Air-Entraining Admixture" | 3 | ||
| 03 30 53 | 2.2.3.2 | "Water-Reducing or Retarding Admixture" | 3 | ||
| 03 30 53 | 2.2.9 | "Curing Materials" | 3 | ||
| 03 30 53 | 2.2.6 | "Expansion Joint Filler Strips | Premolded" | 3 | |
| 03 30 53 | 3.1.3.3 | "Batching and Mixing Equipment" | 3 | ||
| 03 30 53 | 3.2 | "Conveying and Placing Concrete" | 3 | ||
| 03 30 53 | 2.2.7 | "Formwork" | 3 | ||
| 03 30 53 | 2.3 | "Mix Design Data" | 3 | G | |
| 03 30 53 | 2.3 | "Ready-Mix Concrete" | 3 | ||
| 03 30 53 | 2.2.5 | "Mechanical Reinforcing Bar Connectors" | 3 | ||
| 03 30 53 | 2.2.2 | "Aggregates" | 6 | ||
| 03 30 53 | 2.1.3 | "Concrete Mixture Proportions" | 6 | G | |
| 03 30 53 | 3.8.3 | "Compressive Strength Testing" | 6 | G | |
| 03 30 53 | 3.8.3 | "Slump" | 6 | G | |
| 03 30 53 | 3.8.3 | "Air Content" | 6 | ||
| 03 30 53 | 2.2.4 | "Water" | 6 | ||
| 03 30 53 | 2.2.1 | "Cementitious Materials" | 7 | ||
| 03 30 53 | 2.2.1.2 | "Pozzolan" | 7 | ||
| 03 30 53 | 2.2.2 | "Aggregates" | 7 | ||
| 03 30 53 | 2.3 | "Delivery Tickets" | 7 | ||
| 32 01 11.51 | 1.3 | "Mechanical paint removal equipment" | 3 | ||
| 32 01 11.51 | 1.4 | "Test Section Results" | 6 | ||
| 32 01 19 | 3.1 | "Equipment" | 3 | ||
| 32 01 19 | 1.3.1 | "Materials" | 4 | G | |
| 32 01 19 | 1.3.1 | "Certified Copies of the Test Reports" | 6 | G | |
| 32 01 29.61 | 1.4.1 | "Concrete Mix Design" | 3 | ||
| 32 01 29.61 | 2.1.4.1 | "Concrete Mix Design" | 3 | ||
| 32 01 29.61 | 2.1.10 | "Rigid Proprietary Repair Products" | 3 | ||
| 32 01 29.61 | 2.1.11 | "Polymeric Proprietary Repair Products" | 3 | ||
| 32 01 29.61 | 2.1.5.1 | "Pigmented Liquid Membrane-Forming Compound" | 3 | ||
| 32 01 29.61 | 2.1.5.1 | "Pigmented Liquid Membrane-Forming Compound" | 3 | ||
| 32 01 29.61 | 2.1.10.6 | "Aggregate Service Record" | 3 | ||
| 32 01 29.61 | 3.5.1 | "Absorbent Curing Material" | 4 | ||
| 32 01 29.61 | 2.1.8 | "Joint Filler" | 4 | ||
| 32 01 29.61 | 2.1.7 | "Joint Sealant" | 4 | ||
| 32 01 29.61 | 1.4.1 | "Concrete Mix Design" | 5 | ||
| 32 01 29.61 | 2.1.4.1 | "Concrete Mix Design" | 5 | ||
| 32 01 29.61 | 1.4.1 | "Test Results" | 6 | ||
| 32 01 29.61 | 1.4.1.2 | "Gradation" | 6 | ||
| 32 01 29.61 | 2.1.1.4 | "Gradation" | 6 | ||
| 32 01 29.61 | 1.4.1.1 | "Cement" | 6 | ||
| 32 01 29.61 | 2.1.4.1 | "Slump" | 6 | ||
| 32 01 29.61 | 2.1.4.1 | "Air Content" | 6 | ||
| 32 01 29.61 | 2.1.10.1 | "Compressive Strength" | 6 | ||
| 32 01 29.61 | 1.4.2 | "Mixer Calibration and Efficiency" | 6 | ||
| 32 01 29.61 | 1.4.2 | "Concrete Uniformity" | 6 | ||
| 32 01 29.61 | 2.1.10.2 | "Bond Strength" | 6 | ||
| 32 01 29.61 | 2.1.11 | "Polymeric Proprietary Repair Products" | 6 | ||
| 32 01 29.61 | 1.4.1.1 | "Cement" | 7 | ||
| 32 01 29.61 | 1.4.1.2 | "Aggregate" | 7 | ||
| 32 01 29.61 | 2.1.3 | "Admixtures" | 7 | ||
| 32 01 29.61 | 3.5.1 | "Absorbent curing material" | 7 | ||
| 32 01 29.61 | 2.1.5.1 | "Pigmented Liquid Membrane-Forming Compound" | 7 | ||
| 32 01 29.61 | 2.1.5.1 | "Pigmented Liquid Membrane-Forming Compound" | 7 | ||
| 32 01 29.61 | 2.1.8 | "Joint Filler" | 7 | ||
| 32 01 29.61 | 2.1.7 | "Joint Sealant" | 7 | ||
| 32 12 13 | 3.7 | "Sampling and Testing" | 6 | ||
| 32 12 15.13 | 2.1 | "Placement Plan" | 2 | G | |
| 32 12 15.13 | 2.1.6 | "Diamond Grinding Plan" | 3 | G | |
| 32 12 15.13 | 2.4 | "Mix Design" | 3 | G | |
| 32 12 15.13 | 3.1 | "Contractor Quality Control" | 3 | G | |
| 32 12 15.13 | 2.2 | "Aggregates" | 4 | ||
| 32 12 15.13 | 2.3 | "Asphalt Cement Binder" | 4 | ||
| 32 12 15.13 | 2.4.1 | "Warm-mix Additive" | 4 | ||
| 32 12 15.13 | 2.2 | "Aggregates" | 6 | G | |
| 32 12 15.13 | 3.1.3.10 | "QC Monitoring" | 6 | ||
| 32 12 15.13 | 2.3 | "Asphalt Cement Binder" | 7 | G | |
| 32 12 15.13 | 3.7 | "Testing Laboratory" | 7 | ||
| 32 12 15.13 | 2.4.1 | "Warm-mix Additive" | 7 | ||
| 32 17 23 | 2.1.2 | "Application Equipment List" | 3 | G | |
| 32 17 23 | 3.2 | "Exterior Surface Preparation" | 3 | ||
| 32 17 23 | 1.3.1 | "Safety Data Sheets" | 3 | G | |
| 32 17 23 | 2.2.2.1 | "Reflective media for airfields" | 3 | G | |
| 32 17 23 | 2.2.1 | "Waterborne Paint" | 3 | G | |
| 32 17 23 | 2.2.2.1 | "Reflective Media for Airfields" | 6 | G | |
| 32 17 23 | 2.2.1 | "Waterborne Paint" | 6 | G | |
| 32 17 23 | 1.3.2 | "Qualifications" | 7 | G | |
| 32 17 23 | 2.2.2.1 | "Reflective Media for Airfields" | 7 | ||
| 32 17 23 | 2.2.1 | "Waterborne Paint" | 7 | ||
| 32 17 23 | 1.3.1 | "Volatile Organic Compound" | 7 | G | |
| 32 17 23 | 2.2.1 | "Waterborne Paint" | 8 | G |