Atch 6-AF Form 66 Blank 7 March.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Well 3 & Well 5 Repair w/SCADA Automation
- Solicitation number
- FA480325B0002
About this file
The document is an Air Force Form 66 Material Submittal Schedule for a federal contract opportunity related to Well 3 & Well 5 Repair with SCADA Automation at Shaw AFB. The form outlines a detailed timeline for required project submittals, including a construction schedule, equipment submittals, O&M manuals, and various stages of drawing submissions (35%, 65%, 95%, and as-built drawings).
The associated solicitation (FA480325B0002) seeks installation of process equipment, controls systems, and SCADA integration for wells, with a project magnitude between $500,000 and $1,000,000. Key dates include a mandatory site visit on April 18, 2025, at 9:00 AM EST, questions due by April 23, 2025, at 2:00 PM EST, and offer submissions due on May 20, 2025, at 2:00 PM EST. The project requires compliance with Shaw AFB design standards, ANSI, AWWA, NEC, and UPC guidelines. Contact persons are Mr. Darrel Ford and SrA Felix Prose from the Air Force Air Combat Command.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NCOC-A
| PROJECT NUMBER : | PROJECT TITLE: | SOLICITATION/CONTRACT NO.: | |
| SCHEDULE OF MATERIAL SUBMITTALS | |||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR |
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | OTHER | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | |||||||||||||||||||
| 1 | Construction Schedule | x | Within 1 week of NTP | |||||||||||||||||
| 2 | Equipment submittals | x | ||||||||||||||||||
| 3 | O&M Manuals | x | ||||||||||||||||||
| 4 | 35% Drawings | x | ||||||||||||||||||
| 5 | 65% Drawings | x | ||||||||||||||||||
| 6 | 95% Drawings | x | ||||||||||||||||||
| 7 | As-Built Drawings | x | ||||||||||||||||||
| 8 | HMI Graphics | x | x | |||||||||||||||||
| 9 | ||||||||||||||||||||
| 10 | ||||||||||||||||||||
| 11 | ||||||||||||||||||||
| 12 | ||||||||||||||||||||
| 13 | ||||||||||||||||||||
| 14 | ||||||||||||||||||||
| 15 | ||||||||||||||||||||
| 16 | ||||||||||||||||||||
| 17 | ||||||||||||||||||||
| 18 | ||||||||||||||||||||
| 19 |
Solicitation No. F38604-99-1480 Attachment 6
AF FORM 66
(Computer Generated) PAGE &P of &N
File details come from the government source that posted it. Updated .