Atch 5-Pricing Sheet-Well Automation-8 March.xlsx

XLSX spreadsheet 36 KB Posted

Attached to
Well 3 & Well 5 Repair w/SCADA Automation
Solicitation number
FA480325B0002
Issued by

About this file

The file contains a pricing sheet for multiple Contract Line Item Numbers (CLINs) related to a Well Automation Project for Shaw Air Force Base. The solicitation (FA480325B0002) requires installation of process equipment, controls systems, system integration, and remote SCADA access for Wells 3 and 5, with a project magnitude between $500,000 and $1,000,000. Key project components include chemical analyzers, eye wash stations, Allen Bradley VFDs, level sensors, flow meters, PLC programming, automation setup, chemical feed pumps, and network infrastructure.

Critical solicitation dates include a site visit on 18 April 2025, questions deadline of 23 April 2025, and offer submissions due on 20 May 2025 at 2:00 PM EST. The project will be executed for the Department of the Air Force Air Combat Command, with technical requirements mandating compliance with Shaw AFB Design and Construction Standards, ANSI, AWWA, NEC, and UPC guidelines. Contractors must submit questions to Contracting Officer Mr. Darrel Ford and Contract Specialist SrA Felix Prose, with offer packages to be opened on 22 May 2025.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN0001

Project:Well AutomationProject Engineer:Christopher Smith
Location:Department:20 CES
Contractor:Date:4/8/25
Address:Total
PR No.:

Line No. Item Units Quantity Material Costs Labor Costs Direct Cost Line Total

Unit CostTotalLabor Hours per UnitLabor HoursAvg. Rate ($/hr)Total
1Chem AnalyzersLS
2Eye wash stationsEA
365'' TVEA
455'' TVEA
5Studio 5000 Purchase and installEA
6Factory Talk Purchase and installEA
7Allen Bradley VFDEA
8Stripper level system upgradeEA
9DemoLS
10Ultrasonic Level sensorsEA
11Flow MetersEA
12PLC ProgramingEA
13PLC Automation setup TestingEA
14Chemical Feed PumpsEA
15Sample tableEa
16LabelingEA
17Managed SwitchesEA
18
19
20
21SuperintendentWK
22Project ManagerWK
23DesignEA
Total:
Total Material Cost:
Total Labor Cost:
Direct Cost:
Total Line Item Cost:
Overhead:
Subtotal:
Profit:
Subtotal:
Bond:
Total Contract Price:

CLIN0002

Project:Well AutomationProject Engineer:Christopher Smith
Location:Department:20 CES
Contractor:Date:12/18/24
Address:Total
PR No.:

Line No. Item Units Quantity Material Costs Labor Costs Direct Cost Line Total

Unit CostTotalLabor Hours per UnitLabor HoursAvg. Rate ($/hr)Total
1Chem AnalyzersLS
2Eye wash stationsEA
3Allen Bradley VFDEA
4Stripper level system upgradeEA
5DemoLS
6Ultrasonic Level sensorEA
7Flow MetersEA
8PLC ProgramingEA
9PLC Automation setup TestingEA
10Chemical Feed PumpsEA
11Sample tableEa
12LabelingEA
13
14
15
16
17SuperintendentWK
18Project ManagerWK
19DesignEA
Total:
Total Material Cost:
Total Labor Cost:
Direct Cost:
Total Line Item Cost:
Overhead:
Subtotal:
Profit:
Subtotal:
Bond:2.5%
Total Contract Price:

Marquee CLIN3

Project:ARCENT MarqueeProject Engineer:Tony Satcher
Location:Department:20 CES
Contractor:Date:6/3/21
Address:Total$164,881.34
PR No.:

Line No. Item Units Quantity Material Costs Labor Costs Direct Cost Line Total

Unit CostTotalLabor Hours per UnitLabor Cost per UnitLabor HoursAvg. Rate ($/hr)Total
1DuctLF1600$6.00$9,600.000.0378$2.2760.5$60.05$3,632.00$3,200.00$16,432.00
2ConcreteCY35$155.00$5,425.000.55$33.0019.3$60.00$1,155.00$2,106.00$8,686.00
3Cable(15 kV)LF2400$15.88$38,100.000.0334$2.0180.2$60.18$4,824.00$42,924.00
4Transformer (1 phase) including all hardwareEA1$10,850.00$10,850.0048$2,400.0048.0$50.00$2,400.00$13,250.00
5Sectionalizing CabinetsEA1$5,000.00$5,000.0035$1,750.0035.0$50.00$1,750.00$6,750.00
6Mobilization/DemobilizationLS1$5,000.00$5,000.00
7TestingLS1$7,000.00$7,000.00
8BoringLF100$92.00$9,200.00$5,000.00$14,200.00
9SuperintendentWK340$2,175.00120.0$54.38$6,525.00$6,525.00
10Project ManagerWK240$2,325.0080.0$58.13$4,650.00$4,650.00
11DesignEA1$7,525.02$7,525.02
Total:$78,175.00$24,936.00$29,831.02$132,942.02
Total Material Cost:$78,175.00
Total Labor Cost:$24,936.00
Direct Cost:$29,831.02
Total Line Item Cost:$132,942.02
Overhead:10%$13,294.20
Subtotal:$146,236.22
Profit:10%$14,623.62
Subtotal:$160,859.84
Bond:2.5%$4,021.50
Total Contract Price:$164,881.34

File details come from the government source that posted it. Updated .