This document contains a submittal register and federal contract opportunity for replacing carpet in Building 34 at FE Warren AFB, Wyoming. The contractor shall supply, deliver, and install carpet for rooms 290, 292, 293, 294, 295, and 299 by 13 March 2024. The submittal register requires the contractor to submit a hazardous materials authorization form, carpet tile color choices, and a one-year workmanship warranty. A statement from the installer confirming prices are at or below tier 1 contract rates must be included with the quote. The site visit date to arrange measurements will be coordinated by the contracting specialist. The Department of the Air Force Global Strike Command is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch 6 Solicitation Questions and Answers.pdf | ||
| FA461324Q00100002 Amd 02.pdf | ||
| FA461324Q00100001 Amd 01.pdf | ||
| Solicitation Questions 12March24.pdf | ||
| Solicitation Questions 12March24.pdf | ||
| Atch 1 Statement of Work 26 Feb 24.pdf | ||
| Solicitation - FA461324Q0010.pdf | ||
| Atch 4 HazMat Authorization Request.pdf | ||
| Atch 2 Asbestos and Lead Report.pdf | ||
| Atch 3 Drawing.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 01
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT: Replace Carpet Bldg. 34 Rooms 290, 292, 293, 294, 295, and 299 | SOLICITATION/CONTRACT NO. | ||
| AF FORM 66 | Page 1 of 1 | Tririga # 11258583 | ||
| TO BE COMPLETED BY ARCHITECT-ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR |
LINE NUMBER ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL CERTIFICATION OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION SCHEDULE OF MATERIALS TECHNICAL DATA INSTALLATION INSTRUCTIONS OPERATING INSTRUCTIONS MSDS SHEETS TEST REPORTS MANUFACTURER'S WARRANTY REQUIRED SUBMISSION DATE fergusog: Enter the due date from the Contractor (DD/MMM/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (DD/MMM/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (DD/MMM/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(DD/MMM/YY)
SUBMITTAL NUMBER
fergusog: Enter the Submittal Number
CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(DD/MMM/YY)
REMARKS
fergusog: Enter any comments pertaining to the sumittal
1 Hazmat Authorization Form. To be filled out by contractor for hazardous materials used. X X App'd fergusog: Enter date the Contractor was notified of submittal approval
(DD/MMM/YY)
fergusog: Enter any comments pertaining to the sumittal Disapp'd fergusog: Enter date the Contractor was notified of submittal disapproval
(DD/MMM/YY)
| 2 | Carpet tiles. Color choices for user to choose | X | X | X | X | X | X |
| 3 | Warranty. One year workmanship warranty by contractor. | X | X |
Section 02 SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | SCHEDULES, LISTINGS,REPORTS, PLANS | MANUFACTURER'S RECOMMENDATION | TECHNICAL DATA | OPERATING INSTRUCTIONS | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBER | CONTR NOTI | ACTOR FIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS |
| A | D |
| 12 |
| 13 |
| 14 |
| 15 |
| 16 |
| 17 |
| 18 |
| 19 |
| 20 |
| 21 |
| 22 |
| 23 |
| 24 |
| 25 |
| 26 |
| 27 |
| 28 |
| 29 |
| 30 |
| 31 |
| 32 |
| 33 |
| 34 |
| 35 |
Resubmittals SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | SCHEDULES, LISTINGS,REPORTS, PLANS | MANUFACTURER'S RECOMMENDATION | TECHNICAL DATA | OPERATING INSTRUCTIONS | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBER | CONTR NOTI | ACTOR FIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS |