This document appears to be an AF Form 66 Schedule of Material Submittals for a federal contract opportunity to Replace Cathodic Protection at Multiple Facilities on Davis-Monthan AFB, solicitation number FA487724R0022.

The key details are:

  • The project is to replace cathodic protection at multiple facilities and perform cathodic protection tests by an NEC certified technician to provide a fully functional system to protect metal structures against corrosion.
  • The contractor is required to submit various documents including a C&D plan, as-builts, O&M manuals, and AF Forms 66 and 3064.
  • All submittals must be provided per the requirements in Sections 01010 and 01011 of the specifications.
  • A site visit is scheduled for August 29, 2024 at 9:30AM Arizona local time.
  • The contract is being procured by the Department of the Air Force, Air Combat Command.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF Form 66

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER :PROJECT TITLE:SOLICITATION/CONTRACT NO.:
FBNV 240026Replace Cathodic Protection, Multiple Facilities
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALNO. OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVAL
CERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSAS-BUILTSOTHERAwarded:
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
1C&D Plan Sec 01010, Para 2.7e2Provide 1 -hard copy and 1-digital copy
2Record As-Builts Sec 01010, Para 4.2bXSee for Spec 01010 for submital requiremnts
3Electronic Record Sec 01010, Para 4.2cXSee for Spec 01010 for submital requiremnts
4Record Documents, Sec 01010, Para 4.3.XSee for Spec 01010 for submital requiremnts
5Operational and Maintenance Manuals, Sec 01010, Para 4.4.XSee for Spec 01010 for submital requiremnts
6Form 66
Sec 01011, Par 1.81Provide 1-digital copy
7AF Form 3064, Sec 01011, Para 1.8.11Provide 1-digital copy
8Interim Design Submittal, Sec 01011, Para 2.4.1XSee for Spec 01011 for submital requiremnts
9Final Design Submittal, Sec 01011, Para 2.4.2XSee for Spec 01011 for submital requiremnts

AF FORM 66

(Computer Generated) PAGE &P of &N