01- Full Specifications - Copy FBNV240026.pdf

PDF 2 MB Posted

Attached to
FBNV240026 Replace Cathodic Protection Test Points DMAFB
Solicitation number
FA487724R0022
Issued by

About this file

This document is a detailed specification for a federal contract opportunity (FBNV240026) to replace the cathodic protection test point stations at multiple facilities on Davis-Monthan Air Force Base in Arizona.

The key requirements include: the contractor shall remove and replace cathodic protection test points at 18 different facilities, perform cathodic protection testing at each facility using NEC certified personnel, and provide a fully functional cathodic protection system at each location. Specific facilities and test point locations are listed. The contractor shall also submit various permits and plans related to environmental controls, hazardous materials, and construction activities. The total performance period is 159 calendar days. Relevant submittal requirements, quality control expectations, and site access/traffic control details are also provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

FOR

FBNV 240026

Replace Cathodic Protection at Multiple Facilities

AT

DAVIS-MONTHAN AFB

ARIZONA

10 April 2024

F

B N

V

April 10, 2024, SPECIFICATIOS FBNV 240026

TECHNICAL PROVISIONS OF SPECIFICATIONS

Project No. FBNV 240026

Contractor shall furnish all labor, equipment, appliance, and materials and perform all operations necessary Site Survey/Field Investigation (Execution Only) and Construction/Install the following: The contractor shall replace the Cathodic Protection test point stations at Multiple Facilities. The contractor shall also perform Cathodic Protection Test at each Facility by an NEC certified Cathodic Protection Technician or Cathodic Protection Specialis. The Contractor is responsible to perform the work to provide a fully functional Cathodic Protection system in each of the multiple Facilities at Davis-Monthan AFB, Arizona, in strict accordance with these specifications. The Contractor is responsible for adding, updating, and completing all applicable project FBNV240026 specifications and Plans.

TABLE OF CONTENTS

SECTION AND TITLE

DIVISION 01 – GENERAL REQUIREMENTS

01010 Summary of Work

DIVISION 13 – SPECIAL CONSTRUCTION

13 47 13.16 1130 Cathodic Protection Graphite Tank

Experience Test Board

Experience Cathodic Shunt

Experience Cathodic Protection System Test

Davis-Monthan Air Force Base, Arizona FBNV 240026 Replace Cathodic Protection at Multiple Facilities 10 APR 2024

01010-1

SECTION 01 010 – SUMMARY OF WORK

NOTE: The Davis-Monthan Air Force Base Design Compatibility Guideline requirements and those defined in the following section may directly affect the Contractor’s overhead for completing the scope of work.

Failure on the part of the Contractor to adequately review this section and identify/clarify any requirements herein will not constitute justification of Contractor claims for additional design and/or construction costs.

1. SUMMARY OF WORK

1.1 Work Included in this Contract: The following descriptions are for general reference only, and shall not be construed as a complete list of all operations to be performed.

a. The contractor shall replace the Cathodic Protection test point stations at Multiple Facilities.

1. The contractor shall remove (1) test point station at Facility 253.

2. The contractor shall replace the Cathodic protection test point (TP1) with new test board and shunt at Facility 253.

3. The contractor shall remove (5) test point stations at Facility 254.

4. The contractor shall replace the Cathodic protection test points (TP1, TP2, TP4, TP5 and TP6) with new test boards and shunts at Facility 254.

5. The contractor shall remove (2) test point stations at Facility 261.

6. The contractor shall replace the Cathodic protection test points (TP3 and TP7) with new test boards and shunts at Facility 261.

7. The contractor shall remove (10) test point stations at Facility 269.

8. The contractor shall replace the Cathodic protection test points (TP1, TP2, TP3, TP5, TP6, TP7, TP8, TP9, TP11 and TP12) with new test boards and shunts at Facility 269.

9. The contractor shall remove (2) test point stations at Facility 1550.

10. The contractor shall replace the Cathodic protection test points (TP2 and TP6) with new test boards and shunts at Facility 1550.

11. The contractor shall remove (2) test point stations at Facility 1610.

12. The contractor shall replace the Cathodic protection test points (TP1 and TP3) with new test boards and shunts at Facility 1610.

13. The contractor shall remove (7) test point station at Facility 2612.

14. The contractor shall replace the Cathodic protection test points (TP1, TP2B, TP3, TP4, TP10, TP12A and TP12B) with new test boards and shunts at Facility 2612.

15. The contractor shall remove (1) test point station at Facility 4515.

16. The contractor shall replace the Cathodic protection test point (TP2) with new test board and shunt at Facility 4515.

01010-2

17. The contractor shall remove (1) test point station at Facility 4829.

18. The contractor shall replace the Cathodic protection test point (TP6) with new test board and shunt at Facility 4829.

19. The contractor shall remove (1) test point station at Facility 4832.

20. The contractor shall replace the Cathodic protection test point (TP10) with new test board and shunt at Facility 4832.

21. The contractor shall remove (4) test point stations at Facility 4837.

22. The contractor shall replace the Cathodic protection test point (TP3, TP4, TP5 and TP7) with new test boards and shunts at Facility 4832.

23. The contractor shall remove (4) test point stations at Facility 4841.

24. The contractor shall replace the Cathodic protection test point (TP1A, TP1B, TP3A and TP3B) with new test boards and shunts at Facility 4841.

25. The contractor shall remove (16) test point stations at Facility 4843.

26. The contractor shall replace the Cathodic protection test point (TP1, TP2, TP3, TP4, TP5, TP6, TP7, TP9, TP10, TP11, TP13, TP13A, TP14, TP16, TP17 and TP18) with new test boards and shunts at Facility 4843.

27. The contractor shall remove (6) test point stations at Facility 4876.

28. The contractor shall replace the Cathodic protection test point (TP4, TP6, TP12, TP13, TP14 and

TP15) with new test boards and shunts at Facility 4876.

29. The contractor shall remove (7) test point stations at Facility 4885.

30. The contractor shall replace the Cathodic protection test point (TP2A, TP2B, TP10, TP12, TP13, TP14 and TP19) with new test boards and shunts at Facility 4885.

31. The contractor shall remove (2) test point stations at Facility 4889.

32. The contractor shall replace the Cathodic protection test point (TP5 and TP7) with new test boards and shunts at Facility 4889.

33. The contractor shall remove (5) test point stations at Facility 4891.

34. The contractor shall replace the Cathodic protection test point (TP3, TP14, TP17, TP18 and TP21) with new test boards and shunts at Facility 4891.

35. The contractor shall remove (2) test point stations at Facility 7447.

36. The contractor shall replace the Cathodic protection test point (TP1 and TP2) with new test boards and shunts at Facility 7447.

37. The contractor shall remove (4) test point stations at Facility 7456.

01010-3

38. The contractor shall replace the Cathodic protection test point (TP1A, TP2, TP14 and TP15) with new test boards and shunts at Facility 7456.

See the attached plan sketch (page 8) of the Sacrificial Anode System which indicates the typical location of the Test Point in this Cathodic Protection System. Also see the attached File (page 9) titled

“Cathodic Failures 19’-22’.xlsx” for historical data at each building location and point.

b. The contractor shall perform Cathodic Protection Test at each Facility by NEC certified Cathodic

Protection Technician or Cathodic Protection Specialist.

c. The contractor shall submit an AF Form 103 for Utility Outages and Digging Permits, Per section 1.3.

d. The total performance period cover progress from Notice To Proceed (NTP) to construction completion and beneficial occupancy is 159 calendar days total, including the 31 days shown for project closeout and completion.

1.2 Salvage and Disposal: All salvageable and non-salvageable material obtained by removal of existing material shall be considered as having been included as a factor in the Contractor's bid price.

a. Salvageable material obtained from existing construction may be reused only if so stated elsewhere in the Contract Documents, and then only when the material is approved for reuse by the Contracting Officer.

b. Salvageable material shall remain the property of the Government only when specifically called out in the Contract Documents.

c. Salvageable material not reused or otherwise designated to remain the property of the Government shall become the property of the Contractor and shall be removed and disposed of off base in accordance with the environmental controls specified in this Section.

d. Non-salvageable material: Remove all non-salvageable material from the project site and dispose of it off base, in accordance with the environmental controls specified in this Section.

1.3 Base Outages and Digging Permits (AF Form 103, BCE Work Clearance Request):

a. Utility Outages: Accomplish all work required in connection with utility outages on weekends or off-duty hours, or as directed by the Contracting Officer. The Contractor shall be responsible for all work associated with the utility outages. Notify the Contracting Officer in writing 21 calendar days prior to the desired date for the utility outage.

b. Road Closures: If road closures are needed during the construction of any portion of the project, a traffic control plan shall be generated by the Contractor and submitted for approval by the Contracting Officer. Notify the Contracting Officer in writing 21 calendar days prior to the desired date for closure.

c. The Contractor is responsible for and shall process all digging permits and bluestake requirements through the 355 CES Customer Service Desk (Bldg 4300). The Contractor shall allow for approximately 21 calendar days for the construction areas to be properly marked. The Contractor is also responsible for contacting Arizona 811 and independently marking and potholing for security camera conduit/wiring around the base; and vacuum and oxygen medical lines around the 355 Medical Group. Although the 355 CES Drawing Vault has drawings for security camera conduit/wiring and medical lines, it is not responsible for the bluestaking or actual location of these utilities. The Contractor must mark all areas that he wishes to have the Government bluestake with white paint PRIOR to the submission of the AF Form 103; and shall include a site drawing of the area to be bluestaked with the submission. Upon submission, the Contractor shall provide the Contracting Officer the tracking number in order for the Government to help the Contractor track its progress (if necessary). Once a construction site has been marked, it is the Contractor’s responsibility to maintain the markings with stakes or whiskers.

1.4 Submittal Procedures:

01010-4

a. AF Form 66, Schedule of Material Submittals: An AF Form 66, listing the items of equipment and materials for which submittals are required by the specifications, is provided for the Contractor’s use. The Contractor shall complete the column “Required Submission Date” and submit to the Contracting Officer for approval within 10 calendar days after Notice to Proceed. The approved submittal register will become the scheduling document and will be used to control submittals throughout the life of the contract. During construction, it may be discovered that this list was not all-inclusive and that additional submittals may be required from and shall be submitted by the Contractor, as directed by the Contracting Officer.

b. AF Form 3000, Material Approval Submittal:

1. The AF Form 3000 shall be used for submitting both Government-approved and information-only submittals in accordance with the instructions on the reverse side of the form. The Contracting Officer shall furnish these forms to the Contractor. This form shall be properly completed by filling out the heading blanks and identifying each item submitted. Special care shall be exercised to ensure proper listing of the specification paragraph and/or sheet number of the contract drawings pertinent to the information submitted for each item(s).

2. The Contractor shall forward all material submittals required by the technical specifications using the AF Form 3000 as stated in paragraph b1 above. The Contractor provides the submittals in the number of copies as specified on the AF Form 66 and one original of the completed AF Form 3000 to the Contracting Officer no later than the required submission date specified on the AF Form 66 or 10 calendar days from the Notice to Proceed, whichever is later.

3. Identify each submittal by project, Contractor, drawing or detail number, and specification section number, as appropriate. Mark submittals to show the specific item(s) that will be furnished. Include intended use of the submittal and any other pertinent information necessary for a complete evaluation. If the Contractor provides a submittal which show variations from the contract documents, the Contractor shall completely describe such variations in writing clearly and separately from any other portion of the submittal. Highlighting or marking in any manner the proposed variations is not sufficient to comply with this requirement. This requirement applies irrespective of the provisions of any specification which follow this section and which may be particular to specific item(s).

c. Submit to the Contracting Officer complete information applicable to the item(s) of equipment and materials called for by the Contract Documents, for approval, prior to installing the relevant item(s) of equipment and material. If unapproved item(s) of equipment or material are installed, the Contracting Officer, at his sole discretion and option, may reject the installed equipment and material. If rejected, the Contracting Officer may then pursue, again in his sole discretion and option, remedies including but not limited to the removal and reinstallation of approved item(s) of equipment or material at the Contractor’s expense, extended warranties, and other remedies as may be deemed appropriate and applicable to that portion of the construction.

d. Submittals covering component items forming a system or items that are interrelated shall be scheduled to be coordinated and submitted concurrently. Certifications to be submitted with the pertinent drawings shall be so scheduled.

e. Adequate time (14 calendar days) shall be allowed and shown on the register for distribution, review and approval by both or either the Project Inspector and Contracting Officer.

1.5 Quality Control:

a. Provide quality control over the entire project including but not limited to the items of equipment and materials intended for installation, necessary coordination and services to facilitate the performance of the work, site conditions, and the workmanship of the Contractor personnel and any subcontractors.

b. The Contractor shall become familiar with all the details of the work depicted in the Contract Documents and shall verify all field conditions related to the construction prior to commencement of the work. If conditions are discovered by the Contractor prior to commencement of the work which conflict with the Contract Documents, and which will substantially affect the construction as designed and depicted in the Contract Documents, identify and explain the condition(s) in writing to the Contracting Officer within 48

01010-5 hours of discovery of the condition(s); and request clarification from the Contracting Officer before commencing work.

c. If site conditions are discovered by the Contractor during the construction which conflict with the Contract Documents, and which affect either a portion of the current construction, or which will substantially affect the construction as designed and depicted in the Contract Documents, identify and explain the condition(s) in writing to the Contracting Officer within 48 hours of discovery of the condition(s); and request clarification from the Contracting Officer before proceeding. All such requests for information shall completely address aspects of the condition, including but not limited to, engineering judgments and engineered solutions, possible costs or deductions, and time extensions.

d. If site conditions or defects are discovered during the construction, by the Contracting Officer or the Contracting Officer’s designated representative, which are the result of the Contractor’s inadequate quality control or substandard workmanship, whether by the Contractor or a subcontractor, which conflict with the Contract Documents, and which affect either a portion of the current construction, or which will substantially affect the construction as designed and depicted in the Contract Documents, the Contracting Officer may direct the Contractor to identify and explain the condition(s) or defect(s) in writing to the Contracting Officer within 48 hours of discovery of the condition(s). In all such instances, the Contractor shall present viable options to correct the condition or defect, completely addressing aspects of the condition, including but not limited to, engineering judgments and engineered solutions, possible costs or deductions, and time extensions. The Contracting Officer will then review and approve an option for use by the Contractor. The Contractor shall not proceed with the work until receiving the written permission from the Contracting Officer.

e. The Contractor shall comply fully with manufacturer's instructions, including each step in sequence.

If such instructions conflict with the Contract Documents, identify and explain the conflict in writing to the Contracting Officer within 48 hours of discovery of the conflict; and request clarification from the Contracting Officer before proceeding.

f. Exterior surfaces including but not limited to Portland cement concrete, asphalt pavements, and gravel and interior surfaces including but not limited to carpet, tile, ceiling tiles, and gypsum board damaged by construction work or the Contractor’s operations, shall be replaced with materials consistent in quality and workmanship to match existing.

g. It is the Contractor’s responsibility to maintain any and all quality control records and have them available to the Government at all times.

1.6 Experience Requirement: Not Used.

2. CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

2.1 Traffic Regulation:

a. Barriers: Contractor shall furnish all signs, barricades, and flagmen required to control traffic in the construction area.

1. All signs and barricades shall be in accordance with ANSI D6.1, Manual of Uniform Traffic Control Devices.

2. Minimize interference with the flow of traffic. At no time may access to any facility be prevented.

b. Haul routes: As directed by the Contracting Officer. The haul route shall enter and exit through the Swan Road gate, and travel to and from the project site by the most direct route.

1. Immediately clean up any material spilled along the haul route. This shall include clean up of mud tracked on the road by the Contractor’s equipment.

2. For any spill of hazardous material on base, immediately notify the base fire department at 911.

The Contractor is responsible for all costs incurred by the Government in responding to or cleaning up any such spill.

01010-6

c. Access: Contractor shall maintain access to the base work site at all times. The Contractor is to perform his work with a minimum of interference to the flow of traffic.

2.2 Safety:

a. Comply with the Corps of Engineers Manual on General Safety Requirements, EM 385-1-1;

Occupational Safety and Health Act (OSHA), Public Law 91-596; and AFI 91-301, Air Force Occupational Safety, Fire Prevention, and Health (AFOSH) Program.

b. Use of flammable adhesives or other similar flammable materials will be in strict accordance with manufacturer's instructions and the Contractor shall take all necessary safety and fire prevention steps to supervise and assure safe execution of work on the contract. This paragraph is applicable to adhesive materials or any other material involving flammable characteristics.

2.3 Blasting: No blasting will be permitted.

2.4 Grade Control: Not used.

2.5 Environmental Control:

a. The Contractor shall be required meet or exceed the requirements and compliances of the 355 CES/CEAN, Civilian Contractor Environmental Guide dated 15 Aug 2006.

b. Obtain permits from the Pima County Department of Environmental Quality, Air Quality Division, for installation of new equipment or use of Contractor equipment which generate air pollution, for earth-moving activities related to new construction, and for asbestos removal or demolition. These permits shall be included as a submittal on the AF Form 66, Schedule of Material Submittals. Submit copies of permits to the Contracting Officer prior to beginning construction. All permit costs shall be considered as having been included as a factor in the Contractor's bid price.

c. Contractor shall comply with State of Arizona Storm Water Pollution Prevention Plan requirements and submit an approved SWPPP to the Contracting Officer for all work that meets minimum disturbance requirements as set forth by the Arizona Department of Environmental Quality (ADEQ). Treat areas subject to dust-producing activities with liquid palliatives which will not harm regrowth of vegetation, or other such method of dust control which complies with PCAQCD regulations.

d. No open burning of trash, brush, or refuse will be permitted.

f. The Contractor shall segregate hazardous or regulated materials, and non-hazardous or non-regulated materials during demolition; and handle, transport, store, and dispose of these hazardous and non-hazardous materials in accordance with applicable federal, state, and local laws, ordinances, or other rulings having the effect of law, including but not limited to the items listed below. In addition, the Contractor shall obtain proper disposal manifests for both hazardous and regulated materials, and for non-hazardous or non-regulated materials, and submit these manifests to the Contracting Officer. These manifests shall be included as a submittal on the AF Form 66, Schedule of Material Submittals. Submit original manifest—with original signature of the Contractor’s superintendent or authorized representative attesting to the validity of the manifest—to the Contracting Officer within 3 calendar days of disposal. All handling, transporting, and disposal costs shall be considered as having been included as a factor in the Contractor's bid price. Any questions regarding proper handling or disposal of hazardous or non-hazardous materials may be directed through the Contracting Officer to the Environmental Quality Flight at 228-4829.

1. Resource Conservation and Recovery Act (42 USC 6901)

2. Clean Water Act (33 USC 1251)

3. Clean Air Act (42 USC 7401-7642)

4. Toxic Substances Control Act (15 USC 260)

5. National Environmental Policy Act (42 USC 4321-4347)

6. Hazard Communication (OSHA Std 29 CFR 1910.1200) http://www.deq.pima.gov/air/pdf/AQAPapplication.pdf

01010-7

g. The Contractor will be held responsible for complying with all federal, state, and local environmental regulations included as part of the processes in performing the work included in this project.

2.6 Security:

a. For entry to the base, submit an entry authorization request letter for each individual requiring access to the project, at least 10 calendar days prior to beginning work. A copy of the format of this letter may be obtained from the Contracting Officer on or before the pre-performance conference. Valid identification with a photograph together with the base pass will be required for all individuals when entering the base.

b. All passes issued must be returned to the Contracting Officer upon termination of the employee or completion of the project, whichever is sooner.

2.7 Project Identification Sign: Not used.

2.8. Project Progress Photographs: Not used.

2.9. Fenced Contractor’s and Storage Yards: The Contractor shall install and maintain a temporary, fenced Contractor’s yard (in the base’s Contractor’s area) and a temporary, fenced storage yard (near the project site if approved) in locations designated by the Contracting Officer. The temporary fencing shall be of sufficient strength and height to minimize and restrict entry by unauthorized personnel. The temporary fencing shall be provided with visual screening for the full height and length, using tan-colored screening or a similar color selected and approved by the Contracting Officer. The temporary fencing and screening shall remain in place and be maintained for the life of this contract.

2.10. Material Handling and Storage:

a. Handle, store, and protect all products in accordance with manufacturer's instructions.

b. At the end of each work day, park and store all equipment and materials in the location designated by the Contracting Officer.

3. PROJECT CLOSE-OUT

3.1 Pre-Inspection Final Cleaning:

a. Clean all surfaces exposed to view.

b. Polish transparent and glossy surfaces.

c. Clean equipment and fixtures.

d. Clean debris from work site.

e. Remove temporary labels.

f. Properly dispose of all hazardous and non-hazardous materials off base in accordance with the environmental controls specified in this Section.

3.2 Record Disks, Documents, and Disks: N/A

End of Section 01010

Year Facilty

2022 253 TP1

2022 254 TP1 TP2 TP4 TP5 TP6

2022 261 TP3 TP7

2022 269 TP1 TP2 TP3 TP5 TP6 TP7 TP8 TP9 TP11 TP12

2022 1550 TP2 TP6

2022 1610

2022 2612 TP1 TB2B TP3 TP4 TP10 TP12A TP12B

2022 4515 TP2

2022 4829 TP6

2022 4832 TP10

2022 4837 TP3 TP4 TP5 TP7

2022 4841 TP1A TP1B TP3A TP3B

2022 4843 TP1 TP2 TP3 TP4 TP5 TP6 TP7 TP9 TP10 TP11 TP13 TP13A TP14 TP16

2022 4876 TP4 TP6 TP12 TP13 TP14 TP15

2022 4885 TP2A TP2B TP10 TP12 TP13 TP14 TP19

2022 4889 TP5 TP7

2022 4891 TP3 TP14 TP17 TP18 TP21

2022 7447 TP1 TP2

2022 7456 TP1A TP2 TP14 TP15

TP17 TP18

NO. OF COPIES REQUIRED

Awarded:

Pre-Con:

NTP:

Const. Start:

Const. End:

Finalled:

APPROVED DISAPPROVED

AF Form 103 Job Order Sec 01010, Para 1.3c 1

Hazardous Material Usage Sec 01010, Para 2.5c Env Cont Guide Sec 3.3 Hazardous Material

HAZMAT Usage Reports Sec 01010, Para 2.5c Env Cont Guide Sec 3.4 HAZMAT Usage

Air Quality Activity Permit Sec 01010, Para 2.5d Env Cont Guide Sec 3.3 Air Quality

AZPDES General Permit Sec 01010, Para 2.5d Env Cont Guide Sec 3.3 SWPP

Asbestos Removal/Demolition Activity Permit Sec 01010, Para 2.5d Env Cont Guide Sec 3.3 Asbestos

LBP Removal/Demolition Activity Permit Sec 01010, Para 2.5d Env Cont Guide Sec 3.3 Lead-Based Paint

Pima County Department of Environmental Quality (PDEQ Sec 01010, Para 2.5d Env Cont Guide Sec 3.3 Protection of Native Plants

Asbestos Removal/Demolition Abatement Plan Sec 01010, Para 2.5e Env Cont Guide Sec 3.3 Asbestos

Construction & Demolition Debris Diversion Plan Sec 01010, Para 2.5e Env Cont Guide Sec 3.3 C&D Plan

SWPP Plan Sec 01010, Para 2.5f 1

LI

NE

N

UM

BE

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER

Replace Cathodic Protection at Multiple FacilitiesFBNV240026

DA

TE

R

EC

EI

VE

D

IN

C

ON

TR

AC

TI

NG

DA

TE

T O

CI

VI

L

EN

GI

NE

ER

IN

G

RE

TU

RN

S

US

PE

NS

E

DA

TE

SU

BM

IT

TA

L

NU

MB

ER

S

P re co ns tr uc tio n Su bm itt al s

S ho p

D ra w in gs

P ro du ct

D at a

S am pl es

D es ig n D at a

T es t R ep or ts

C er tif ic at es

M an uf ac tu re r's

In st ru ct io ns

M an uf ac tu re r's

F ie ld R ep or ts

O pe ra tio n an d M ai nt en an ce M an ua l

C lo se ou t S ub m itt al

REMARKS

RE

QU

IR

ED

S

UB

MI

SS

IO

N

DA

TE

FI

NA

L

AP

PR

OV

AL

DATE CONTRACTOR NOTIFIED

CO

NT

RA

CT

OR

R

ES

UB

MI

TT

AL

(1st of the month for projects >60days) (End of project for projects <60 days)

2 Days Prior to Construction

7 Days after Reciept of Permit

7 Days after Reciept of Permit

7 Days after Reciept of Permit

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT TITLE: PROJECT NUMBER:

7 Days after Reciept of Permit

7 Days after Reciept of Asbestos Demolition Permit

AF FORM 66 (Computer Generated) PAGE 1 of 3

Pre-Con:

NTP:

Const. Start:

Const. End:

Finalled:

APPROVED DISAPPROVED

LI

NE

N

UM

BE

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER

Replace Cathodic Protection at Multiple FacilitiesFBNV240026

DA

TE

R

EC

EI

VE

D

IN

C

ON

TR

AC

TI

NG

DA

TE

T O

CI

VI

L

EN

GI

NE

ER

IN

G

RE

TU

RN

S

US

PE

NS

E

DA

TE

SU

BM

IT

TA

L

NU

MB

ER

S

P re co ns tr uc tio n Su bm itt al s

S ho p

D ra w in gs

P ro du ct

D at a

S am pl es

D es ig n D at a

T es t R ep or ts

C er tif ic at es

M an uf ac tu re r's

In st ru ct io ns

M an uf ac tu re r's

F ie ld R ep or ts

O pe ra tio n an d M ai nt en an ce M an ua l

C lo se ou t S ub m itt al

REMARKS

RE

QU

IR

ED

S

UB

MI

SS

IO

N

DA

TE

FI

NA

L

AP

PR

OV

AL

DATE CONTRACTOR NOTIFIED

CO

NT

RA

CT

OR

R

ES

UB

MI

TT

AL

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT TITLE: PROJECT NUMBER:

Asbestos Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Asbestos Removal

Non-Regulated Waste Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Regulated Hazardous Waste

Regulated Waste Disposal Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Regulated Hazardous Waste

Regulated Waste Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Regulated Hazardous Waste

Recycling Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Waste & Recyclables

Non-Hazardous Waste Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Waste & Recyclables

18 Progress Photographs Sec 01010, Para 2.9

19 Record As-Builts Sec 01010, Para 3.2.2.a

20 Record Disks Sec 01010, Para 3.2.2.b 1

21 Warranty/Guarantee Items Sec 01010, Para 3.2.2.c.1

22 O&M Manual Sec 01010, Para 3.2.2.d 2

28 Contractor to add Submittals as required or requested.

7 Days After Reciept of Manifest

3 days after Disposal

Coordinated Prior to Removal from Installation

3 Days after Disposal (1st of the month for projects >60days) (End of project for projects <60 days)(1st of the month for projects >60days) (End of project for projects <60 days)

AF FORM 66 (Computer Generated) PAGE 2 of 3

Pre-Con:

NTP:

Const. Start:

Const. End:

Finalled:

APPROVED DISAPPROVED

LI

NE

N

UM

BE

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER

Replace Cathodic Protection at Multiple FacilitiesFBNV240026

DA

TE

R

EC

EI

VE

D

IN

C

ON

TR

AC

TI

NG

DA

TE

T O

CI

VI

L

EN

GI

NE

ER

IN

G

RE

TU

RN

S

US

PE

NS

E

DA

TE

SU

BM

IT

TA

L

NU

MB

ER

S

P re co ns tr uc tio n Su bm itt al s

S ho p

D ra w in gs

P ro du ct

D at a

S am pl es

D es ig n D at a

T es t R ep or ts

C er tif ic at es

M an uf ac tu re r's

In st ru ct io ns

M an uf ac tu re r's

F ie ld R ep or ts

O pe ra tio n an d M ai nt en an ce M an ua l

C lo se ou t S ub m itt al

REMARKS

RE

QU

IR

ED

S

UB

MI

SS

IO

N

DA

TE

FI

NA

L

AP

PR

OV

AL

DATE CONTRACTOR NOTIFIED

CO

NT

RA

CT

OR

R

ES

UB

MI

TT

AL

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT TITLE: PROJECT NUMBER:

AF FORM 66 (Computer Generated) PAGE 3 of 3

03-01010 SUMMARY OF WORK - Replace Cathodic Protection at Multi Facs.pdf
CATHODIC FAILURES 19'-22'.pdf
2022 FAILS
05-FBNV240026 AF Form 66.pdf
AF Form 66

File details come from the government source that posted it. Updated .