Copy of FBNV24-0026 RFI LOG.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
FBNV240026 Replace Cathodic Protection Test Points DMAFB
Solicitation number
FA487724R0022
Issued by

About this file

This document is a Request for Information (RFI) Tracker Log related to Solicitation Number FA487724R0022 for the FBNV 24-0026 project to replace cathodic protection test points at multiple facilities on Davis-Monthan Air Force Base in Arizona.

The key details are:

  • The contractor must replace the entire cathodic protection test position stations, including the test board, shunt, and sacrificial anodes. They must also perform cathodic protection tests at each facility using NEC certified technicians.
  • A site visit was held on August 29, 2024 at 9:30AM local time.
  • A technical narrative is required but no design drawings need to be submitted.
  • Certain permits such as air quality, AZPDES, and asbestos/LBP surveys are not required for this project.
  • Material submittals must be provided prior to the contractor placing the order.
  • The specific anode sizes and depths are unknown, but will be provided from previous test position station test results.
  • Some test point locations are under asphalt, concrete or dirt.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Request for Information Tracker Log

Solicitation NumberFA487724R0022
TitleFBNV240026 - Cathodic Protection
RFI No.Date Received From CONSRFIApplicable PartyResponse
RFI - 00019/5/24Summary of Work calls for replacing the Cathodic protection test point with “new test board and shunt”. Please confirm “New Test Board and Shunt” is the only requirement and that test station enclosure or any other materials are excluded.CES"You must replace the entire test position station". Please see the top sheet of the Specifications section as it states: "Contractor shall furnish all labor, equipment, appliance, and materials and perform all

operations necessary Site Survey/Field Investigation (Execution Only) and Construction/Install the following: The contractor shall replace the Cathodic Protection test point stations at Multiple Facilities. The contractor shall also perform Cathodic Protection Test at each Facility by an NEC certified Cathodic Protection Technician or Cathodic Protection Specialis. The Contractor is responsible to perform the work to provide a fully functional Cathodic Protection system in each of the multiple Facilities at Davis-Monthan AFB, Arizona, in strict accordance with these specifications. The Contractor is responsible for adding, updating, and completing all applicable project FBNV240026 specifications and Plans. "You must replace the entire test position station"

RFI - 00029/5/24Will another site visit be possible?CESThis could be arranged. But it will not be to every site TP Station.
RFI - 00039/5/24Section L and Section M of the Solicitation both call for a technical narrative to include a proposed schedule and preliminary design drawings. Is design required on this project? Is a technical narrative, schedule, and drawings required for submission?CESA technical narritive is required but no Design drawings need to be presented.
RFI - 00049/5/24AF3066 Submittal register provided in the specifications and the excel sheet differ. Specifications register calls for following submittals, are these required?
a.Air Quality Activity Permit
b.AZPDES General Permit
c.Asbestos Removal/Demolition Activities
i.Is asbestos present? Is there a current survey that can be provided?
d.LBP Removal/Demolition Activities
i.Is LBP present? Is there a current survey that can be provided?
e.PDEQ Protection of Native Plants
f.SWPP Plan
g.Asbestos manifestsCESNone of these permits are required on this project. A dig permit will be required for all excavations on the base. That will be coordinated through the CE Construction surveylance manager appoited at the time of contract award.
RFI - 00059/5/245.Excel Register calls for following submittals, are these required?
a.Interim Design Submittal
b.Final Design SubmittalCESCE requires a materials submittal for this project prior to contractor placing the order.
RFI - 00069/5/24In Section 01 010 Summary of Work, the work included on each test point station is written as "replacing the cathodic test point with a new test board and shunt" at the listed test points. Will each of the 82 test points listed require sacrificial anode replacement in addition to test board and shunt replacement?CESYes, it will require the excavation and replacement of the anode as stated in the answer to RFI #1 above.
RFI - 00079/5/24If the listed test points do require sacrificial anode replacement what are the specifications on the anodes and installation of the anodes? Size, depth of installation etc.CESThe require sacrificial anode replacement types and sizes are listed in the Copies of the Test Position Station Test sheets results of 2022 which I have sent to SrA Hunter Nope (he is to transmitt these sheets to all bidders). this will indicate the specifications on the anodes including the size. The depths are unknown.
RFI - 00089/5/24What are the conditions of the anode/testing point locations? Are they under asphalt, dirt etc.CESCE Engineering have not visually surveyed all of the locations. But, yes some of these locations are below asphalt, concrete and dirt.
RFI - 0009
RFI - 0010
RFI - 0011
RFI - 0012
RFI - 0013
RFI - 0014
RFI - 0015
RFI - 0016
RFI - 0017
RFI - 0018
RFI - 0019
RFI - 0020
RFI - 0021
RFI - 0022
RFI - 0023
RFI - 0024