AF Form 66_11Apr24.xlsx
Air Force Form Apr 11, 2024 XLSX spreadsheet 18 KB Posted
- Attached to
- Repair Vehicle Barrier Controls
- Solicitation number
- EEPZ232987
About this file
This document is an AF Form 66, which is a Schedule of Material Submittals for a federal contract opportunity to repair vehicle barrier controls at specified locations.
The key details are:
- The project title is "Repair Vehicle Barrier controls 9017, 9022, 9023, 9026" with a general project number of EEPZ232987.
- The contract requires the submission of various documents such as work/construction plans, as-built drawings, progress schedules, guarantees and warranties, and superintendent qualifications.
- The related federal contract opportunity has a solicitation number of EEPZ232987 and is for the repair of vehicle barrier controls. The estimated value is between $250,000 and $500,000. Site visits are encouraged but not mandatory, with registration required by 07/02/2024. All RFIs must be submitted by 07/11/2024. Contractors must complete CUI training to access contract documents.
- The contracting agency is the Department of the Air Force, Air Education and Training Command.
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General
| Project No: | Project Title: | Date: | 11-Apr-24 | |||||||||||||||||
| EEPZ232987 | Repair Vehicle Barrier controls 9017, 9022, 9023, 9026 | |||||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | |||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | ||||||||||||
| GENERAL | ||||||||||||||||||||
| 1 | Work/Construction/phasing Plan | BASIC | X | |||||||||||||||||
| 3 | As-Built Drawings | BASIC | X | |||||||||||||||||
| 4 | Progress Schedule | BASIC | X | |||||||||||||||||
| 5 | Guarantees and Warranties | BASIC | X | |||||||||||||||||
| 6 | Superintendent's Qualifications and Experience | BASIC | X | |||||||||||||||||
| 7 | Contorl Panel | RFP | X | X | X | X | X | |||||||||||||
| 8 | Fiber Optics | RFP | X |
AF Form 66 (Substitute) GENERAL Page&Pof&N
SCHEDULE OF MATERIAL SUBMITTALS