AF Form 66_11Apr24.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- Repair Vehicle Barrier Controls
- Solicitation number
- EEPZ232987
About this file
This document is an AF Form 66, which is a Schedule of Material Submittals for a federal contract opportunity to repair vehicle barrier controls at specified locations.
The key details are:
- The project title is "Repair Vehicle Barrier controls 9017, 9022, 9023, 9026" with a general project number of EEPZ232987.
- The contract requires the submission of various documents such as work/construction plans, as-built drawings, progress schedules, guarantees and warranties, and superintendent qualifications.
- The related federal contract opportunity has a solicitation number of EEPZ232987 and is for the repair of vehicle barrier controls. The estimated value is between $250,000 and $500,000. Site visits are encouraged but not mandatory, with registration required by 07/02/2024. All RFIs must be submitted by 07/11/2024. Contractors must complete CUI training to access contract documents.
- The contracting agency is the Department of the Air Force, Air Education and Training Command.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General
| Project No: | Project Title: | Date: | 11-Apr-24 | |||||||||||||||||
| EEPZ232987 | Repair Vehicle Barrier controls 9017, 9022, 9023, 9026 | |||||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | |||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | ||||||||||||
| GENERAL | ||||||||||||||||||||
| 1 | Work/Construction/phasing Plan | BASIC | X | |||||||||||||||||
| 3 | As-Built Drawings | BASIC | X | |||||||||||||||||
| 4 | Progress Schedule | BASIC | X | |||||||||||||||||
| 5 | Guarantees and Warranties | BASIC | X | |||||||||||||||||
| 6 | Superintendent's Qualifications and Experience | BASIC | X | |||||||||||||||||
| 7 | Contorl Panel | RFP | X | X | X | X | X | |||||||||||||
| 8 | Fiber Optics | RFP | X |
AF Form 66 (Substitute) GENERAL Page&Pof&N
SCHEDULE OF MATERIAL SUBMITTALS