Appendix A - Cost Breakdown.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Repair Vehicle Barrier Controls
- Solicitation number
- EEPZ232987
About this file
This document is an Appendix A - Cost Breakdown worksheet for a federal contract opportunity. It provides a detailed cost proposal breakdown for the "Repair Vehicle Barrier Controls" project, including pricing for bonds and insurance, mobilization, architecture and engineering design, materials, equipment, labor, and miscellaneous charges. The overall construction project grand total is requested. The related federal contract opportunity is for expanding the storage area of a hazardous waste storage facility, which includes site work, foundation, block walls, roof, rolling door, explosion-proof electrical equipment, and fire protection piping and sprinklers. The solicitation number is EEPZ232987, the opportunity type is a Solicitation, and the estimated range of magnitude is between $250,000 and $500,000. A site visit is highly encouraged but not mandatory, with specific instructions for attending. All RFIs must be submitted by 4:30 PM CST on 11 July 2024.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Appendix A |
| CONSTRUCTION PRICE PROPOSAL BREAKDOWN |
| VENDOR'S INFORMATION |
| Name: |
| Address: |
| Phone Number: |
| Email: |
| Cage Code: |
| SOLICITATION INFORMATION | ||||
| Title of Project: | ||||
| Solicitation Number: | ||||
| Days proposal good for: | ||||
| BONDS AND INSURANCE | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| Certificate of Insurance | 1 | |||
| Performance Bonds | 1 | |||
| Payment Bonds | 1 | |||
| Bid Bonds | 1 | |||
| MOBILIZATION | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| ARCHITECTURE AND ENGINEERING DESIGN | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| 35% Design's | ||||
| 65% Design's | ||||
| 95% Design's | ||||
| 100% Design's (Construction Set) | ||||
| MATERIAL | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| EQUIPMENT | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| LABOR | HOURS | UNIT OF ISSUE | RATE | AMOUNT |
| MISCELLANEOUS CHARGES | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| CONSTRUCTION PROJECT | GRAND TOTAL | |||
| GENERAL INFORMATION | ||||
| The purpose of the requested information in the attached worksheets is to assist government personnel in the review and evaluation of proposals submitted by offerors. Offerors are reminded that the responsibility for providing adequate supporting data and attachments lies solely with them. Further, the offeror must also bear the burden of proof in establishing reasonableness of proposed pricing; therefore, it is in the offeror’s best interest to submit a fully supportable and well-prepared cost proposal. The basis and rationale for all proposed costs should be provided as part of the proposal so that Government personnel can place reliance on the information as current, complete and accurate. Further, FAR 15.403-4 sets forth those circumstances in which offerors are required to submit certified cost or pricing data. (Updated Nov. 19, 2013) |