3. AF Form 66 - Renovate Locker Room Restrooms, B3453.xlsx
Air Force Form XLSX spreadsheet 96 KB Posted
- Solicitation number
- FA303024Q0032
About this file
This document is a Submittal Register for the project "Renovate Locker Room Restrooms, B3453" at Goodfellow Air Force Base in Texas. The project requires various preconstruction submittals, including safety plans, utility outage requests, quality control plans, and construction schedules. Key submittals include concrete mix design, reinforcing steel shop drawings, hazardous material documentation, and warranty information. The related federal contract opportunity is Solicitation FA303024Q0032 for demolition and partial renovation of the men's restrooms/locker room at the Louis F. Garland Fire Academy, Building 3453. The contract is a Firm Fixed-Price requirement with a Period of Performance of 150 days after contract award, which is anticipated by 12 August 2024. The contract is a 100% Small Business set-aside with an estimated value between $250,000 and $500,000. A site visit is scheduled for 17 July 2024, and proposals are due by 05 August 2024.
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal Register
| TITLE: | RENOVATE LOCKER ROOM RESTROOMS, B3453 | SUBMITTAL REGISTER | ||||||||||||||||
| LOCATION: | Goodfellow Air Force Base, TX | |||||||||||||||||
| PROJECT NO: | 1137937 | |||||||||||||||||
| CONTRACT NO: | ||||||||||||||||||
| CONTRACTOR SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | ||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) |
| Line | Activity # | Trans-mittal # | Specification Section | Submittal Description | Paragraph # | Classification | Submit | Approval Needed By | Material Needed By | Action Code | Date Of Action | Date FWD to APPR / Auth Date RCD From CONTR | Date FWD To Other Revwr | Date RCD From Other Revwr | Action Code | Date Of Action | Mailed To CONTR/ Date RCD From APPR Authority | Remarks |
| DIVISION 01 - GENERAL REQUIREMENTS | ||||||||||||||||||
| 1 | 010100 | Pre-construction submittals | 1.5.1 | G | ||||||||||||||
| 2 | 010100 | Abnormal Work Schedule Request | 2.2 | G | ||||||||||||||
| 3 | 010100 | Company Safety Plan | 2.3/3.0 | |||||||||||||||
| 4 | 010100 | Accident Prevention Plan | 2.3/3.0 | |||||||||||||||
| 5 | 010100 | Facility Utility Outage Request | 2.5.2 | G | ||||||||||||||
| 6 | 010100 | AF Form 103 - Work Clearance Request | 2.12.1 | G | ||||||||||||||
| 7 | 010100 | AF Form 592 - Welding & Brazing Permit | 3.4 | G | ||||||||||||||
| 8 | 010100 | GAFB Fire Hydrant Usage Request | 3.5 | G | ||||||||||||||
| 9 | 010100 | TX Fire Sprinkler CR | 3.6 | G | ||||||||||||||
| 10 | 010100 | Street Closure Request | 3.7 | G | ||||||||||||||
| 11 | 010100 | Pre-Final and Final Inspection Report | 5.3/5.3.1 | G | ||||||||||||||
| 12 | 010100 | Nucular Density Permit | 6.1 | G | ||||||||||||||
| 13 | 010100 | Temp. Field Office/Storage Location | 5.1 | G | ||||||||||||||
| 14 | 010100 | Project Signage | 5.4.4 | G | ||||||||||||||
| 15 | 010100 | Project As-Builts | 7.1 | G | ||||||||||||||
| 16 | 010100 | DD Form 1354 | 7.1/7.6 | G | ||||||||||||||
| 17 | 010100 | Operation/Maintenance Manuals | 7.2 | G | ||||||||||||||
| 18 | 010100 | 1 Year Construction Warranty | 7.3 | G | ||||||||||||||
| 19 | 010100 | Daily Quality Control Reports | 7.4 | |||||||||||||||
| 20 | 010100 | Construction Schedule and Planning Chart | 7.5 | G | ||||||||||||||
| 21 | 014000 | CSI Certificate TCEQ Form 20699 | 3.4.2/3.4.3 | G | ||||||||||||||
| 22 | 014000 | Class III Back Flow Preventer Testing and Maintenance Records (Fire Hydrants) | 3.4.7 | |||||||||||||||
| 23 | 014000 | Air Emissions Reports | 3.6 | |||||||||||||||
| 24 | 014000 | Hazardous Material and Approval Submittal | 4.2 | G | ||||||||||||||
| 25 | 014000 | Hazardous Material SDS | 4.3 | |||||||||||||||
| 26 | 014000 | Hazardous Chemicals Usage Report | 4.4 | |||||||||||||||
| 27 | 014000 | Non-Hazardous Waste Transportation and Disposal Documentation | 5.3 | G | ||||||||||||||
| 28 | 014000 | Hazardous Waste Records and Documentation | 6.1 | G | ||||||||||||||
| 29 | 014000 | Hazardous Waste Transportation and Disposal Documentation | 6.1.7 | G | ||||||||||||||
| 30 | 014000 | Construction and Debris Reports | 12.0/12.2 | G | ||||||||||||||
| DIVISION 02 - DEMOLITION | ||||||||||||||||||
| 024100 | SD-01 Preconstruction Submittals | |||||||||||||||||
| 31 | Demolition Plan | 1.2.2 | G | |||||||||||||||
| DIVISION 03 - CONCRETE | ||||||||||||||||||
| 03 01 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| 32 | Qualifications | 1.5.3 | G | |||||||||||||||
| 33 | Work Plan | 1.5.5 | G | |||||||||||||||
| 34 | Quality Control Plan | 1.5.2 | G | |||||||||||||||
| SD-03 Product Data | ||||||||||||||||||
| 35 | Conventional Concrete | 2.5 | ||||||||||||||||
| 36 | Polymers | 2.6 | ||||||||||||||||
| 37 | Miscellaneous Materials And Equipment | 2.7 | ||||||||||||||||
| SD-05 Design Data | ||||||||||||||||||
| 38 | Formwork | 3.1.3 | G | |||||||||||||||
| 39 | Repair Procedures | 1.5.1 | G | |||||||||||||||
| 40 | Mixture Proportioning | 2.8 | G | |||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| 41 | Mixture Proportioning | 2.8 | ||||||||||||||||
| 42 | Quality Control | 3.1.5 | ||||||||||||||||
| 43 | Quality Control | 3.2.3 | ||||||||||||||||
| 44 | Quality Control | 3.3.3 | ||||||||||||||||
| 45 | Reinforcement And Reinforcement Supports | 2.4 | ||||||||||||||||
| 46 | Conventional Concrete | 2.5 | ||||||||||||||||
| 47 | Polymers | 2.6 | ||||||||||||||||
| 48 | Miscellaneous Materials And Equipment | 2.7 | ||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| 49 | Qualifications | 1.5.3 | ||||||||||||||||
| 03 30 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| 50 | Concrete Curing Plan | 1.6.3.1 | ||||||||||||||||
| 51 | Quality Control Program | 1.6.5 | G | |||||||||||||||
| 52 | Quality Control Personnel Certifications | 1.6.6 | G | |||||||||||||||
| 53 | Quality Control Organizational Chart | 1.6.6 | ||||||||||||||||
| 54 | Laboratory Accreditation | 1.6.8 | G | |||||||||||||||
| SD-02 Shop Drawings | ||||||||||||||||||
| 55 | Reinforcing Steel | 1.6.2.1 | G | |||||||||||||||
| SD-03 Product Data | ||||||||||||||||||
| 56 | Joint Sealants | 2.4.4 | ||||||||||||||||
| 57 | Joint Filler | 2.4.3 | ||||||||||||||||
| 58 | Cementitious Materials | 2.3.1 | ||||||||||||||||
| 59 | Vapor Retarder | 2.4.5 | ||||||||||||||||
| 60 | Concrete Curing Materials | 2.4.1 | ||||||||||||||||
| 61 | Reinforcement | 2.6 | ||||||||||||||||
| 62 | Admixtures | 2.3.4 | ||||||||||||||||
| 63 | Biodegradable Form Release Agent | 2.2.2 | ||||||||||||||||
| 64 | Pumping Concrete | 1.6.3.2 | ||||||||||||||||
| 65 | Nonshrink Grout | 2.4.2 | ||||||||||||||||
| SD-05 Design Data | ||||||||||||||||||
| 66 | Concrete Mix Design | 1.6.1.1 | G | |||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| 67 | Concrete Mix Design | 1.6.1.1 | G | |||||||||||||||
| 68 | Fly Ash | 1.6.4.1 | ||||||||||||||||
| 69 | Pozzolan | 1.6.4.1 | ||||||||||||||||
| 70 | Aggregates | 1.6.4.2 | ||||||||||||||||
| 71 | Compressive Strength Tests | 3.14.3.3 | G | |||||||||||||||
| 72 | Chloride Ion Concentration | 3.14.3.5 | ||||||||||||||||
| 73 | Air Content | 3.14.3.4 | ||||||||||||||||
| 74 | Slump Tests | 3.14.3.1 | ||||||||||||||||
| 75 | Water | 2.3.2 | ||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| 76 | Reinforcing Bars | 2.6.1 | ||||||||||||||||
| 77 | Welder Qualifications | 1.8 | ||||||||||||||||
| 78 | VOC Content for Form Release Agents, Curing Compounds, and Concrete Penetrating Sealers | 1.6.3.3 | ||||||||||||||||
| 79 | Safety Data Sheets | 1.6.3.4 | ||||||||||||||||
| 80 | Field Testing Technician and Testing Agency | 1.6.6.2 | G | |||||||||||||||
| DIVISION 05 - METALS | ||||||||||||||||||
| 05 40 00 | SD-02 Shop Drawings | |||||||||||||||||
| 81 | Framing Components | 1.6.1 | G | |||||||||||||||
| SD-03 Product Data | ||||||||||||||||||
| 82 | Studs, Joists | 2.1 | ||||||||||||||||
| 83 | Recycled Content of Steel Products | 2.1 | S | |||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| 84 | Load-Bearing Cold-Formed Metal Framing | 1.4 | ||||||||||||||||
| 85 | Welds | 3.2.1 | ||||||||||||||||
| DIVISION 09 - FINISHES | ||||||||||||||||||
| 09 29 00 | SD-03 Product Data | |||||||||||||||||
| 86 | Cementitious Backer Units | 2.1.1 | ||||||||||||||||
| 87 | Accessories | 2.1.4 | ||||||||||||||||
| 88 | VOC Content of Joint Compound | 2.1.2 | S | |||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| 89 | Asbestos Free Materials | 2.1 | G | |||||||||||||||
| 90 | Indoor Air Quality | 1.3.1 | S | |||||||||||||||
| 09 67 23 | SD-02 Shop Drawings | |||||||||||||||||
| 91 | Installation Drawings | 2.1 | G | |||||||||||||||
| SD-03 Product Data | ||||||||||||||||||
| 92 | Manufacturer's Catalog Data | 1.2.2 | G | |||||||||||||||
| SD-04 Samples | ||||||||||||||||||
| 93 | Hardboard Mounted Epoxy Flooring | 1.5.3 | G | |||||||||||||||
| 94 | Mockups | 1.5.1 | G | |||||||||||||||
| SD-05 Design Data | ||||||||||||||||||
| 95 | Design Mix Data | 1.2.3 | G | |||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| 96 | Listing of Product Installations | 1.5.2 | ||||||||||||||||
| 97 | Referenced Standards Certificates | 1.5 | ||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| 98 | Warranty | 1.6 | ||||||||||||||||
| DIVISION 22 - PLUMBING | ||||||||||||||||||
| 99 | 220000 | Product Data | 1.2.B | G | ||||||||||||||
| 100 | 220000 | Test Reports | 1.2.C | |||||||||||||||
| 101 | 220000 | Operation and Maintenance | 1.2.D | |||||||||||||||
| 102 | 220000 | Closeout Submittals | 1.2.E | |||||||||||||||
| DIVISION 31 - EARTHWORK | ||||||||||||||||||
| 31 00 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| 103 | Shoring | 3.1.3 | G | |||||||||||||||
| 104 | Disposition of Surplus Materials | 3.7 | G | |||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| 105 | Material Test Report | 3.8 | G | |||||||||||||||
| 106 | Borrow Site Testing | 3.2.2 | G | |||||||||||||||
| 107 | Pipe Inspection Report | 3.5.1.5 | G | |||||||||||||||
| 31 31 16.13 | SD-01 Preconstruction Submittals | |||||||||||||||||
| 108 | Termiticide Application Plan | 3.1.3 | G | |||||||||||||||
| SD-03 Product Data | ||||||||||||||||||
| 109 | Termiticides | 2.2.1 | ||||||||||||||||
| SD-05 Design Data | ||||||||||||||||||
| 110 | Mixing Formulation | 3.2.2 | ||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| 111 | Soil Moisture | 1.6.1 | ||||||||||||||||
| 112 | Calibration Test | 3.2.1 | ||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| 113 | Qualifications | 1.4.2 | G | |||||||||||||||
| SD-08 Manufacturer’s Instructions | ||||||||||||||||||
| 114 | Termiticides | 2.2.1 | ||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| 115 | Verification of Measurement | 3.3.1 | ||||||||||||||||
| 116 | Warranty | 1.7 | ||||||||||||||||
| 117 | Pest Management Report | 3.4 | ||||||||||||||||
| AF Form 66 | ||||||||||||||||||
| (a)No later than 30 calendar days after Notice to Proceed (NTP) | ||||||||||||||||||
| (b) Prior to starting Phase Two & prior to demo/construction | ||||||||||||||||||
| (c) No later than 1 Calendar Day afer Removal of Equipment | ||||||||||||||||||
| (d) Prior to Final Inspection | ||||||||||||||||||
| (e) Final Inspection | ||||||||||||||||||
| (f) As required per Statement of Work | ||||||||||||||||||
| (g) Prior to Notice to Proceed |