This document is a Submittal Register for the project "Renovate Locker Room Restrooms, B3453" at Goodfellow Air Force Base in Texas. The project requires various preconstruction submittals, including safety plans, utility outage requests, quality control plans, and construction schedules. Key submittals include concrete mix design, reinforcing steel shop drawings, hazardous material documentation, and warranty information. The related federal contract opportunity is Solicitation FA303024Q0032 for demolition and partial renovation of the men's restrooms/locker room at the Louis F. Garland Fire Academy, Building 3453. The contract is a Firm Fixed-Price requirement with a Period of Performance of 150 days after contract award, which is anticipated by 12 August 2024. The contract is a 100% Small Business set-aside with an estimated value between $250,000 and $500,000. A site visit is scheduled for 17 July 2024, and proposals are due by 05 August 2024.

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal Register

TITLE:RENOVATE LOCKER ROOM RESTROOMS, B3453SUBMITTAL REGISTER
LOCATION:Goodfellow Air Force Base, TX
PROJECT NO:1137937
CONTRACT NO:
CONTRACTOR SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITY
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
LineActivity #Trans-mittal #Specification SectionSubmittal DescriptionParagraph #ClassificationSubmitApproval Needed ByMaterial Needed ByAction CodeDate Of ActionDate FWD to APPR / Auth Date RCD From CONTRDate FWD To Other RevwrDate RCD From Other RevwrAction CodeDate Of ActionMailed To CONTR/ Date RCD From APPR AuthorityRemarks
DIVISION 01 - GENERAL REQUIREMENTS
1010100Pre-construction submittals1.5.1G
2010100Abnormal Work Schedule Request2.2G
3010100Company Safety Plan2.3/3.0
4010100Accident Prevention Plan2.3/3.0
5010100Facility Utility Outage Request2.5.2G
6010100AF Form 103 - Work Clearance Request2.12.1G
7010100AF Form 592 - Welding & Brazing Permit3.4G
8010100GAFB Fire Hydrant Usage Request3.5G
9010100TX Fire Sprinkler CR3.6G
10010100Street Closure Request3.7G
11010100Pre-Final and Final Inspection Report5.3/5.3.1G
12010100Nucular Density Permit6.1G
13010100Temp. Field Office/Storage Location5.1G
14010100Project Signage5.4.4G
15010100Project As-Builts7.1G
16010100DD Form 13547.1/7.6G
17010100Operation/Maintenance Manuals7.2G
180101001 Year Construction Warranty7.3G
19010100Daily Quality Control Reports7.4
20010100Construction Schedule and Planning Chart7.5G
21014000CSI Certificate TCEQ Form 206993.4.2/3.4.3G
22014000Class III Back Flow Preventer Testing and Maintenance Records (Fire Hydrants)3.4.7
23014000Air Emissions Reports3.6
24014000Hazardous Material and Approval Submittal4.2G
25014000Hazardous Material SDS4.3
26014000Hazardous Chemicals Usage Report4.4
27014000Non-Hazardous Waste Transportation and Disposal Documentation5.3G
28014000Hazardous Waste Records and Documentation6.1G
29014000Hazardous Waste Transportation and Disposal Documentation6.1.7G
30014000Construction and Debris Reports12.0/12.2G
DIVISION 02 - DEMOLITION
024100SD-01 Preconstruction Submittals
31Demolition Plan1.2.2G
DIVISION 03 - CONCRETE
03 01 00SD-01 Preconstruction Submittals
32Qualifications1.5.3G
33Work Plan1.5.5G
34Quality Control Plan1.5.2G
SD-03 Product Data
35Conventional Concrete2.5
36Polymers2.6
37Miscellaneous Materials And Equipment2.7
SD-05 Design Data
38Formwork3.1.3G
39Repair Procedures1.5.1G
40Mixture Proportioning2.8G
SD-06 Test Reports
41Mixture Proportioning2.8
42Quality Control3.1.5
43Quality Control3.2.3
44Quality Control3.3.3
45Reinforcement And Reinforcement Supports2.4
46Conventional Concrete2.5
47Polymers2.6
48Miscellaneous Materials And Equipment2.7
SD-07 Certificates
49Qualifications1.5.3
03 30 00SD-01 Preconstruction Submittals
50Concrete Curing Plan1.6.3.1
51Quality Control Program1.6.5G
52Quality Control Personnel Certifications1.6.6G
53Quality Control Organizational Chart1.6.6
54Laboratory Accreditation1.6.8G
SD-02 Shop Drawings
55Reinforcing Steel1.6.2.1G
SD-03 Product Data
56Joint Sealants2.4.4
57Joint Filler2.4.3
58Cementitious Materials2.3.1
59Vapor Retarder2.4.5
60Concrete Curing Materials2.4.1
61Reinforcement2.6
62Admixtures2.3.4
63Biodegradable Form Release Agent2.2.2
64Pumping Concrete1.6.3.2
65Nonshrink Grout2.4.2
SD-05 Design Data
66Concrete Mix Design1.6.1.1G
SD-06 Test Reports
67Concrete Mix Design1.6.1.1G
68Fly Ash1.6.4.1
69Pozzolan1.6.4.1
70Aggregates1.6.4.2
71Compressive Strength Tests3.14.3.3G
72Chloride Ion Concentration3.14.3.5
73Air Content3.14.3.4
74Slump Tests3.14.3.1
75Water2.3.2
SD-07 Certificates
76Reinforcing Bars2.6.1
77Welder Qualifications1.8
78VOC Content for Form Release Agents, Curing Compounds, and Concrete Penetrating Sealers1.6.3.3
79Safety Data Sheets1.6.3.4
80Field Testing Technician and Testing Agency1.6.6.2G
DIVISION 05 - METALS
05 40 00SD-02 Shop Drawings
81Framing Components1.6.1G
SD-03 Product Data
82Studs, Joists2.1
83Recycled Content of Steel Products2.1S
SD-07 Certificates
84Load-Bearing Cold-Formed Metal Framing1.4
85Welds3.2.1
DIVISION 09 - FINISHES
09 29 00SD-03 Product Data
86Cementitious Backer Units2.1.1
87Accessories2.1.4
88VOC Content of Joint Compound2.1.2S
SD-07 Certificates
89Asbestos Free Materials2.1G
90Indoor Air Quality1.3.1S
09 67 23SD-02 Shop Drawings
91Installation Drawings2.1G
SD-03 Product Data
92Manufacturer's Catalog Data1.2.2G
SD-04 Samples
93Hardboard Mounted Epoxy Flooring1.5.3G
94Mockups1.5.1G
SD-05 Design Data
95Design Mix Data1.2.3G
SD-07 Certificates
96Listing of Product Installations1.5.2
97Referenced Standards Certificates1.5
SD-11 Closeout Submittals
98Warranty1.6
DIVISION 22 - PLUMBING
99220000Product Data1.2.BG
100220000Test Reports1.2.C
101220000Operation and Maintenance1.2.D
102220000Closeout Submittals1.2.E
DIVISION 31 - EARTHWORK
31 00 00SD-01 Preconstruction Submittals
103Shoring3.1.3G
104Disposition of Surplus Materials3.7G
SD-06 Test Reports
105Material Test Report3.8G
106Borrow Site Testing3.2.2G
107Pipe Inspection Report3.5.1.5G
31 31 16.13SD-01 Preconstruction Submittals
108Termiticide Application Plan3.1.3G
SD-03 Product Data
109Termiticides2.2.1
SD-05 Design Data
110Mixing Formulation3.2.2
SD-06 Test Reports
111Soil Moisture1.6.1
112Calibration Test3.2.1
SD-07 Certificates
113Qualifications1.4.2G
SD-08 Manufacturer’s Instructions
114Termiticides2.2.1
SD-11 Closeout Submittals
115Verification of Measurement3.3.1
116Warranty1.7
117Pest Management Report3.4
AF Form 66
(a)No later than 30 calendar days after Notice to Proceed (NTP)
(b) Prior to starting Phase Two & prior to demo/construction
(c) No later than 1 Calendar Day afer Removal of Equipment
(d) Prior to Final Inspection
(e) Final Inspection
(f) As required per Statement of Work
(g) Prior to Notice to Proceed