This document is a set of responses to a Request for Information (RFI) related to a federal contract opportunity for the demolition and renovation of locker room restrooms at Goodfellow Air Force Base.

The key details are:

  • The contractor can create a temporary opening in a block wall to facilitate the movement of materials and equipment during the project, which the government will later reinstall.
  • The contractor can position a dumpster in the vicinity of the high bay area, on the concrete outside one of the overhead doors, as indicated in the work plan and layout approved by the government.
  • The contract opportunity has a solicitation number of FA303024Q0032 and is for the demolition and partial renovation of the men's restrooms/locker room at the Louis F. Garland Fire Academy, Building 3453.
  • The contract is a Firm Fixed-Price award with a Period of Performance of 150 days, and the anticipated award date is 12 August 2024.
  • The contract is a 100% Small Business Set Aside with a Magnitude of Construction Project between $250,000 and $500,000.
  • A site visit is scheduled for 17 July 2024, and questions are due by 22 July 2024, with proposals due by 05 August 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. It was stated during the site visit that the contractor can knock out a specific portion of the block wall leading to the high bay. The contractor will be able to use the opening to remove debris and use a skid steer if needed. It was further stated that the government will reinstall the wall after the contractor completes the project.

Can you confirm this is correct?

Concur. Refer to AD-101 keynote 17. This temporary opening is for the Contractor to use through construction to facilitate the movement of materials and equipment. It shall be secured after hours and left in place upon completion of the contract and in-filled by the Government at a later date. Existing tables and seating in the high bay can be moved by the Government if needed.

2. Please confirm the contractor can position a dumpster in the vicinity of the high bay, on the concrete, outside of one of the overhead doors.

Concur. Refer to specifications section 2.3 as this requires the Contractor to submit for approval a work plan indicating all items to be included in the Contractor laydown areas.

Refer to G-002 for recommended locations. It also to be noted that laydown areas will be permitted to be located closer to B3458 (as seen in G-002) to prevent damage to vegetated areas and avoid conflict with any known equipment in the area.