1. Specifications Renovate Locker Room Restrooms .pdf

PDF 2 MB Posted

Attached to
Goodfellow AFB - Demolish and Renovate Locker Room Restrooms for B3453
Solicitation number
FA303024Q0032
Issued by

About this file

This document is a federal solicitation for a contract to provide selective demolition and partial renovation of the men's restrooms and locker room in Building 3453 at Goodfellow Air Force Base in Texas. The anticipated Period of Performance is 150 days after contract award. The anticipated award date is August 12, 2024. This is a Firm Fixed-Price contract set aside for 100% Small Business. The Solicitation Number is FA303024Q0032 and the total estimated value is between $250,000 and $500,000. Proposals are due on August 5, 2024 by 3:00 PM CDT. A site visit is scheduled for July 17, 2024. The contracting agency is the 17th Contracting Squadron of the Department of the Air Force Air Education and Training Command.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Proj. 1137937 Renovate Locker Room Restrooms, B3453 Goodfellow AFB, TX

Project: Renovate Locker Room Restrooms, B3453

Capital Project #1137937

Date: February, 2024

CONSTRUCTION SPECIFICATIONS

PREPARED BY:

17TH CIVIL ENGINEER SQUADRON (AETC)

460 E. KEARNEY BOULEVARD

GOODFELLOW AFB, TX 76908-4104

Proj. 1137937 Renovate Locker Room Restrooms, B3453 Goodfellow AFB, TX

TABLE OF CONTENTS

DIVISION SECTION TITLE

SPECIFICATIONS GROUP

General Requirements Subgroup

DIVISION O1 – GENERAL REQUIREMENTS

010000 GENERAL REQUIREMENTS

010200 UTILITIES

014000 ENVIRONMENTAL PROTECTION

Facility Construction Subgroup

DIVISION 02 – EXISTING CONDITIONS

024119 DEMOLITION

DIVISION 03 – CONCRETE

030100 REHABILITATION OF CONCRETE

033000 CAST-IN-PLACE CONCRETE

DIVISION 05 – METALS

054000 COLD-FORMED METAL FRAMING

DIVISION 09 – FINISHES

092900 GYPSUM BOARD

096723 RESINOUS FLOORING

Facilities Services Subgroup

DIVISION 22 – PLUMBING

220000 PLUMBING GENERAL PURPOSE

DIVISION 31 – EARTHWORK

310000 EARTHWORK

313116.13 CHEMICAL EARTHWORK CONTROL

END OF TABLE OF CONTENTS

RENOVATE LOCKER ROOM RESTROOMS, B3453 PROJ. 1137937

GOODFELLOW AFB, TX

SECTI ON 01 01 00

GENERAL REQUI REMENTS

02/ 24

PART 1 GENERAL

1. 1 SCOPE

The wor k cover ed by t hi s pr oj ect consi st s of t he Cont r act or f ur ni shi ng al l l abor , super vi s i on, qual i t y cont r ol , mat er i al s, equi pment , machi nes, t ool s, ser vi ces, suppl i es, and i nci dent al s and per f or mi ng al l oper at i ons i n connect i on wi t h t he " Renovat e Locker Room Rest r ooms, B3453" pr oj ect , Goodf el l ow AFB, Texas, compl et e and i n st r i ct accor dance wi t h t he pl ans and speci f i cat i ons.

1. 2 PROJECT BACKGROUND

The wor k out l i ned bel ow shal l consi st of but i s not l i mi t ed t o t he f ol l owi ng summar y: sel ect i ve demol i t i on and par t i al r enovat i on of t he men' s l at r i ne\ l ocker r oom i n r ooms 105, 107, and 109 i n t he Loui s F.

Gar l and Fi r e Academy, Bui l di ng 3453.

The Cont r act or shal l be r esponsi bl e f or , but not l i mi t ed t o, per f or mi ng al l necessar y demol i t i on t o st r uct ur al , ar chi t ect ur al , mechani cal , el ect r i cal , pl umbi ng, PA syst em ( speaker s) , and f i r e det ect i on/ pr ot ect i on syst ems wher e i ndi cat ed i n t he pr oj ect document s, i nst al l at i on of new wast e and vent l i nes up t o above- concr et e st ub out s, i nst al l at i on of new concr et e f l oor i ng, r esi nous f l oor f i ni sh, wal l and par t i t i on const r uct i on, and par t i al sheat hi ng r equi r ed t o successf ul l y " make- r eady" f or f ut ur e r enovat i on by ot her s. The Cont r act or shal l be r esponsi bl e f or ensur i ng al l appl i cabl e bui l di ng syst ems wi t hi n t he pr oj ect scope ar e compl et e and f unct i onal . The Per f or mance Per i od f or t he ent i r e pr oj ect shal l be ONE HUNDRED and FI FTY ( 150) cal endar days.

As par t of t hi s cont r act , t he Cont r act or wi l l sel ect i vel y demol i sh and par t i al l y r enovat e cur r ent condi t i ons based on t he at t ached pr oj ect document s t o al l ow t he Gover nment t o sel f - per f or m t he f i nal r enovat i ons t o make t he subj ect ar eas compl et e and useabl e f ol l owi ng t he cont r act compl et i on by t he Cont r act or .

PART 2 WORKI NG CONDI TI ONS

The wor k f or t hi s pr oj ect shal l be execut ed i n t he best and most wor kmanl i ke manner , by qual i f i ed and ef f i c i ent mechani cs/ t r adesmen, ski l l ed i n t hei r r espect i ve t r ades. Onl y cer t i f i ed j our neymen i n each r espect i ve t r ade, or appr ent i ces under t he di r ect super vi s i on of cer t i f i ed j our neymen, shal l be per mi t t ed t o i nst al l and/ or super vi se i nst al l at i on f or t hi s pr oj ect . I ndi v i dual t r ade wor k f or t hi s pr oj ect shal l be per f or med and qual i t y mai nt ai ned by t he appl i cabl e t r ade, onl y. Al l t r ades shal l coor di nat e t hei r wor k wi t h t hat of ot her t r ades. The Cont r act or shal l coor di nat e and per f or m al l oper at i ons i n a manner t hat wi l l r esul t i n a pr of essi onal and expedi t i ousl y compl et ed pr oj ect . The wor k shal l be i n st r i ct accor dance wi t h pr evai l i ng i ndust r y st andar ds and manuf act ur er ' s i nst r uct i ons.

SECTI ON 01 01 00 Page 1

2. 1 SPECI AL CONSI DERATI ONS

The Fi r e Tr ai ni ng School ( FTS) i s not a secur ed access f aci l i t y , and wi l l not r equi r e escor t s dur i ng nor mal wor ki ng hour s. However , dur i ng weekends and ni ght t i me wor k, t he Cont r act or wi l l be r esponsi bl e f or coor di nat i ng wi t h t he Gover nment t o ensur e appr opr i at e access and escor t s ar e pr ovi ded.

See sect i on 2. 2 Faci l i t y Access f or addi t i onal i nf omat i on. The Fi r e Tr ai ni ng School i s expect ed t o mai nt ai n occupancy and oper abi l i t y wi t h t he except i on of wor k ar eas dur i ng demol i t i on and const r uct i on act i v i t y. Due t o ongoi ng cl asses, t he Cont r act or may be r equi r ed t o per f or m hi gh- deci bel / hi gh- vol ume wor k such as demol i t i on i ncl udi ng; dr i l l i ng, saw cut t i ng, and j ack hammer i ng of t he concr et e s l ab on weekends or af t er hour s, i f necessar y, t o compl et e wor k. The Gover nment wi l l r eser ve t he r i ght t o r equest t hat t he excavat i on el ement of wor k be per f or med af t er hour s or on weekends dependent on t he gas or di esel - power ed equi pment used dur i ng pl umbi ng l i ne i nst al l . Pr oper vent i l at i on of t he wor k ar ea, i ncl udi ng mechani cal equi pment or vent i l at or s must be pr ovi ded at al l t i mes. The Gover nment wi l l pr ovi de f aci l i t y per sonnel as needed t o ensur e t hat t he f aci l i t y i s secur ed at t he end of t he shi f t .

The Cont r act or shal l pr ovi de above cei l i ng and dust pr ot ect i on met hods t o mi t i gat e dust and par t i c l es t r ansf er r i ng t hr oughout t he f aci l i t y due t o demol i t i on and const r uct i on act i v i t i es. Dust pr ot ect i on scr eens and devi ces shal l be mai nt ai ned t hr oughout t he l i f e of t he pr oj ect .

The Cont r act or may be al l owed t o use exi st i ng l ocker r oom wi ndow( s) f or ai r qual i t y and vent i l at i on measur es or equi pment . Locker r ooms wi ndow( s) may al so be used t o pr ovi de access f or Concr et e t r uck chut es and pumps.

The Cont r act or shal l be r esponsi bl e f or r emovi ng and r ei nst al l i ng wi ndows t o t hei r cur r ent condi t i on. Any damage by t he Cont r act or wi l l be t he r esponsi bi l i t y of t he Cont r act or t o r epai r or r epl ace at no addi t i onal cost t o t he Gover nment . The Cont r act or shal l be r esponsi bl e f or secur i ng and weat her pr oof i ng of Cont r act or ar eas at al l t i mes.

The Cont r act or shal l be r esponsi bl e f or ensur i ng al l new sani t ar y sewer and dr ai n l i nes have cor r ect f al l and cont i nual f l ow t o t he exi st i ng sewer manhol e. The Cont r act or shal l s l ope and scr eed concr et ed ar eas as i ndi cat ed t o ensur e necessar y dr ai nage. The Cont r act or shal l pr ovi de vi deo evi dence ver i f y i ng t hat no bel l i es or s l umps exi st i n new sewer l at er al s pr i or t o f i nal accept ance

2. 2 AFTER HOURS & WEEKEND WORK

Request s t o wor k t he weekend or at ni ght beyond nor mal busi ness hour s shal l be submi t t ed by t he Cont r act or a mi ni mum t hr ee ( 3) busi ness days i n advance. The Cont r act or shal l not exceed t he hour s of 4: 30p. m. - 11: 00p. m.

at ni ght . .

2. 3 WORK PLANS

Pr i or t o st ar t of wor k, t he Cont r act or shal l submi t f or appr oval wor k pl ans descr i bi ng t he f ol l owi ng; Mat er i al and equi pment l aydown ar ea, t empor ar y f enci ng, Cont r act or and Subcont r act or par ki ng ar eas, poi nt - of - ent r y ( PoE) f or wor k ar ea access, dumpst er l ocat i on, por t - a- l et l ocat i ons, pr oj ect and war ni ng si gnage, t empor ar y f i el d of f i ces, and al t er nat e r out e s i gnage f or pedest r i ans and st udent s. The Cont r act or shal l ensur e t hat al l mat er i al s, equi pment , t empor ar y f enci ng, admi n i t ems, wor k c l ear ance per mi t s, and submi t t al s ar e submi t t ed, appr oved, and r eady at t he s i t e pr i or t o st ar t of wor k.

SECTI ON 01 01 00 Page 2

PART 3 WORK SCHEDULE

3. 1 NORMAL WORKI NG HOURS

Wor ki ng hour s f or t he Cont r act or wi l l nor mal l y be bet ween t he hour s of 7: 30 A. M. and 4: 30 P. M. excl udi ng Sat ur days, Sundays, and Feder al hol i days.

Ref er t o Sect i on H of t he sol i c i t at i on/ cont r act document f or f ur t her i nf or mat i on on wor ki ng days. I f t he Cont r act or desi r es t o wor k dur i ng per i ods ot her t han above, a r equest must be made t o t he Cont r act i ng Of f i cer i n wr i t i ng t hr ee ( 3) cal endar days i n advance of hi s/ her i nt ent i on. I f t he r equi r ed base per sonnel ar e r easonabl y avai l abl e, t he Cont r act i ng Of f i cer may aut hor i ze t he Cont r act or t o per f or m wor k dur i ng per i ods ot her t han nor mal dut y hour s/ days.

NORMAL WORK HOURS: The Cont r act or shal l schedul e al l wor k t o commence bet ween t he hour s of 7: 30 AM and 4: 30 PM, Monday t hr ough Fr i day, except on t he Feder al hol i days and days desi gnat ed as " Fami l y Days" by Ai r Educat i on and Tr ai ni ng Command ( AETC) as l i s t ed bel ow. Per mi ssi on t o wor k out si de t hese nor mal busi ness hour s may be gr ant ed by t he Cont r act i ng Of f i cer .

Request s t o wor k out si de t he nor mal wor k hour s must be submi t t ed i n wr i t i ng t o t he Cont r act i ng Of f i cer at l east t hr ee ( 3) wor ki ng days i n advance of t he dat e r equest ed.

Feder al Hol i days

2024 2025

FEDERAL HOLI DAY HOLI DAY FAMI LY DAY HOLI DAY FAMI LY DAY

NEW YEAR' S DAY 01 JAN 02 JAN 01 JAN -

MARTI N LUTHER KI NG DAY 15 JAN - 20 JAN -

WASHI NGTON' S BI RTHDAY 19 FEB - 17 FEB -

MEMORI AL DAY 27 MAY 25 MAY 26 MAY 23 MAY

JUNETEENTH NAT' L I NDEPENDENCE

DAY

19 JUN - 19 JUN 20 JUN

I NDEPENDENCE DAY 04 JULY 05 JULY 04 JULY 07 JUL

LABOR DAY 02 SEP 30 AUG 01 SEP 29 AUG

COLUMBUS DAY 14 OCT - 13 OCT -

VETERAN' S DAY 11 NOV - 11 NOV -

THANKSGI VI NG DAY 28 NOV - 27 NOV 28 NOV

CHRI STMAS DAY 25 DEC - 25 DEC 26 DEC

I t i s ant i c i pat ed t hat t he same number of AETC Fami l y days wi l l be decl ar ed each year .

SECTI ON 01 01 00 Page 3

Any Hol i day f al l i ng on a Sat ur day wi l l be obser ved t he pr ecedi ng Fr i day.

Any Hol i day f al l i ng on a Sunday wi l l be obser ved t he f ol l owi ng Monday.

The base coul d c l ose due t o secur i t y pr obl ems, adver se weat her , or ot her event s. Unl ess ot her wi se not i f i ed by t he Gover nment , t he Cont r act or shoul d moni t or l ocal t el evi s i on st at i ons, r adi o st at i ons, or Goodf el l ow' s Facebook page f or not i f i cat i on of a possi bl e base cl osur e or l at e openi ng. The Cont r act or may not r ecei ve any ot her f or m of not i f i cat i on of a base cl osur e f r om t he Gover nment , unl ess cont act ed by t he Cont r act i ng Of f i cer ( CO) or t he Cont r act i ng Of f i cer Repr esent at i ve ( COR) . The Cont r act or i s r esponsi bl e f or not i f y i ng hi s/ her empl oyees. Cont r act or ( s) do not r epor t when t he base i s c l osed due t o secur i t y pr obl ems and/ or adver se weat her .

3. 2 TOBACCO USE I N FACI LI TI ES

Cont r act or s ar e advi sed t hat t he Commander has pl aced r est r i ct i ons on t he smoki ng of t obacco pr oduct s i n AETC f aci l i t i es. AFI 40- 102, Tobacco Use i n t he Ai r For ce, out l i nes t he pr ocedur es used by t he commander t o cont r ol smoki ng i n our f aci l i t i es. Cont r act or empl oyees and vi s i t or s ar e subj ect t o t he same r est r i ct i ons as gover nment per sonnel . Smoki ng i s per mi t t ed onl y i n desi gnat ed smoki ng ar eas. Addi t i onal i nf or mat i on, t o i ncl ude l ocat i ons of desi gnat ed smoki ng ar eas, wi l l be pr ovi ded t o t he cont r act or at t he pr e- per f or mance conf er ence.

3. 3 UTI LI TY CONSERVATI ON

The Cont r act or wi l l be r equi r ed t o par t i c i pat e i n gover nment ener gy conser vat i on pr ogr ams. For t he pur pose of t hi s cont r act , ut i l i t i es such as wat er , el ect r i c i t y, et c. , wi l l be f ur ni shed by t he gover nment at no cost t o t he cont r act or . Long di st ance and Def ense Swi t ched Net wor k ( DSN) t el ephone ser vi ces wi l l not be pr ovi ded. Ref er t o sect i on 01 02 00 Ut i l i t i es f or addi t i on i nf or mat i on.

PART 4 SAFETY AND HEALTH

4. 1 LABOR REQUI REMENTS

Al l Cont r act or oper at i ons shal l be conduct ed and per f or med i n accor dance wi t h Depar t ment of Labor , OSHA r equi r ement s f ound i n 29 CFR 1910 and 29 CFR 1926, Ai r For ce I nst r uct i on 91- 203, AFOSH st andar ds i ncl udi ng but not l i mi t ed t o ANSI , NFPA, ASTM, and CPSC as appl i cabl e, and handbooks, and t he Cor ps of Engi neer s ( COE) Saf et y Manual 385- 1- 1 al l edi t i ons i n ef f ect on t he dat e of t he sol i c i t at i on. The Cont r act or shal l compl y wi t h al l mandat or y r equi r ement s f or l ockout / t ag out , conf i ned space, hazar d communi cat i on, f al l pr ot ect i on, per sonnel pr ot ect i on equi pment , scaf f ol di ng, power ed const r uct i on equi pment , and al l pr oj ect r el at ed saf et y and heal t h r equi r ement s. .

4. 2 ACCI DENT PREVENT AND COMPANY SAFETY

Al l compani es who conduct busi ness wi t hi n t he st at e of Texas must , i n accor dance wi t h Texas Wor ker ' s Compensat i on l aws ( Texas House Bi l l 62) , have an appr oved company saf et y pol i cy and an Acci dent Pr event i on Pl an.

The pl an, appr oved by t he Texas Wor ker ' s Compensat i on Commi ssi on ( TWCC) and meet i ng al l of t he r equi r ement s of t he COE Saf et y Manual , shal l be submi t t ed For I nf or mat i on Onl y ( FI O) i n accor dance wi t h par agr aph 16, SUBMI TTAL REQUI REMENTS.

SECTI ON 01 01 00 Page 4

4. 3 HOLES/ PI TS/ TRENCHES/ OPENI NGS

Al l hol es/ pi t s/ t r enches/ manway openi ngs, et c, t hat ar e t o be l ef t open shal l be sur r ounded wi t h a 48 i nch hi gh mesh f ence wi t h hi ghl y v i s i bl e or ange pl ast i c coat i ng wi t h war ni ng si gns post ed " Keep Out " and bl i nki ng l i ght f r om dusk t o dawn. Guar dr ai l s, f ences, bar r i cades, and war ni ng l i ght s or ot her i l l umi nat i on shal l be pr ovi ded i n r oadwor k const r uct i on or near vehi cul ar t r af f i c ar eas. Fence shal l be secur el y anchor ed wi t h t ensi on wi r es and post s as r equi r ed t o pr event saggi ng and l ocat ed a mi ni mum of 3 f eet f r om t he openi ng so as t o pr event an i ndi v i dual , shoul d t hey f al l acr oss t he f enci ng, f r om f al l i ng i nt o t he openi ng. Al l exposed t r enches/ Hol es shal l al so be cover ed, when not bei ng wor ked i n, wi t h t hr ee quar t er i nch pl ywood or a met al gr at i ng t hat wi l l pr event anyone f r om ent er i ng t he t r ench/ hol e.

4. 4 RADI ATI ON PERMI TS AND AUTHORI ZATI ONS

Ci vi l i an Cont r act or s or any ot her agency br i ngi ng a r adi oact i ve devi ce,

e. g. , soi l or asphal t densi t y met er , on Goodf el l ow AFB must have pr i or appr oval f r om t he Base Radi at i on Saf et y Of f i cer ( RSO) . An appl i cat i on t o br i ng a r adi oact i ve devi ce on Goodf el l ow AFB shal l be f or war ded t o t he Base RSO t hr ough t he Cont r act i ng Of f i cer at l east 7 days pr i or t o t he ant i c i pat ed use. The appl i cat i on package shal l i ncl ude:

a. Copy of t he appr opr i at e Nucl ear Regul at or y Commi ssi on Li cense or NRC For m 241 or St at e Per mi t ( onl y appl i cabl e i n ar eas wi t h St at e j ur i sdi ct i on ot her wi se St at e per mi t s wi l l not be accept ed) t o oper at e or own a r adi oact i ve devi ce, i . e nucl ear densi t y t est i ng equi pment .

b. Copy of t he oper at or ' s qual i f i cat i ons and r adi at i on saf et y t r ai ni ng.

c. Radi at i on dosi met r y r esul t s f or t he oper at or f or t he pr i or cal endar year , i f appl i cabl e.

d. St at ement of t he expect ed st or age and secur i t y r equi r ement s or ot her par t i cul ar needs of t he Cont r act or .

e. Copi es of t he l ast t wo l eak t est s, as r equi r ed.

f . Under no ci r cumst ances shal l an unl i censed r adi oact i ve devi ce be used on Goodf el l ow AFB. Any quest i ons on Cont r act or ' s r esponsi bi l i t i es r egar di ng t hi s r equi r ement shoul d be di r ect ed t o t he Base RSO, 17 MDOS/ SGOAB, 325- 654- 3126, pr i or t o t he Cont r act or st ar t i ng wor k.

4. 5 CONFI NED SPACE ENTRY:

Al l oper at i ons i nvol v i ng ent r y i nt o conf i ned spaces ar e per f or med by t he Cont r act or and shal l meet t he r equi r ement s of OSHA 29 CFR 1910. 146, AFOSH St d 91- 25 ( may be vi ewed at t he websi t e ht t p: / / www. e- publ i shi ng. af . mi l / / shar ed/ medi a/ epubs/ AFOSHSTD91- 25. pdf ) , shal l be br i ef l y descr i bed dur i ng t he pr e- const r uct i on meet i ng wi t h t he Cont r act i ng Of f i cer , and speci f i cal l y compl y wi t h t he f ol l owi ng:

a. Al l ent r y super vi sor s, at t endees, and conf i ned space ent r ant s shal l have been pr oper l y t r ai ned i n t he saf et y hazar ds, pr oper use of Per sonal Pr ot ect i ve Equi pment ( PPE) , ent r y pr ocedur es, and sel f - r escue. Recor ds of t hi s t r ai ni ng must be r eadi l y avai l abl e.

b. Ent r y super vi sor s shal l mai nt ai n a Mast er Ent r y Pl an ( MEP)

SECTI ON 01 01 00 Page 5 consi st i ng of :

( 1) Descr i pt i ons of conf i ned spaces t o be ent er ed i ncl udi ng l ocat i on, c l assi f i cat i on, and accept abl e ent r y condi t i ons.

( 2) Desi gnat i on of aut hor i zed ent r y super vi sor s, ent r ant s, and at t endees.

( 3) I dent i f i cat i on of t he t ypes of t asks t o be per f or med i n t he conf i ned space i ncl udi ng dur at i on.

( 4) Pr ocedur es f or ent r y and emer gency r escue.

( 5) I dent i f i cat i on of Per sonal Pr ot ect i ve Equi pment ( PPE) , communi cat i on equi pment , r escue equi pment , t est i ng equi pment , and moni t or i ng equi pment ; condi t i ons under whi ch t hey wi l l be used; and ver i f i cat i on of condi t i on of equi pment .

( 6) Desi gnat i on of f r equency and t ype of at mospher i c moni t or i ng.

( 7) Desi gnat i on of cont r ol s r equi r ed ( e. g. , l ockout / t agout , vent i l at i on, et c. ) .

( 8) Pr ocedur es f or communi cat i on dur i ng conf i ned space oper at i ons.

c. Al l AFOSH St d 91- 25, chapt er 7 r equi r ement s wi l l be met and document ed. I f bot h Cont r act or and Gover nment wi l l be accompl i shi ng conf i ned space ent r y, al l pr ocedur es ( per mi t s r equi r ed, oper at i ons pl an, and pr ocedur es) shal l be document ed by t he Ent r y Super vi sor pr i or t o oper at i ons. The Gover nment wi l l br i ef known hazar ds and t he Fi r e Chi ef wi l l appr ove or di sappr ove r escue.

d. Al l conf i ned spaces shal l be t est ed by a qual i f i ed per son usi ng a pr oper l y cal i br at ed moni t or f or per cent oxygen, l ower expl osi ve l i mi t ( LEL) , and t oxi c i t y each t i me bef or e ent r y and per i odi cal l y dur i ng oper at i ons t hat have t he pot ent i al t o al t er at mospher i c condi t i ons.

4. 6 WELDI NG, CUTTI NG, AND BRAZI NG:

I nspect i on of al l wel di ng, cut t i ng, and br azi ng oper at i ons shal l be compl et ed by Fi r e Pr ot ect i on pr i or t o any oper at i on. The Cont r act or shal l pr ovi de t he appr opr i at e oper abl e f i r e ext i ngui sher . Fi r e ext i ngui sher s shal l compl y wi t h NFPA 10. Cont r act or shal l compl y be wi t h OSHA STD 29 CFR 1910. 252 Wel di ng, Cut t i ng, and Br azi ng ( Gener al Requi r ement s) and AFMAN 91- 203 Ai r For ce Occupat i onal Saf et y, Fi r e, and Heal t h St andar ds, whi ch may be vi ewed at t he f ol l owi ng websi t e:

ht t ps: / / st at i c. e- publ i shi ng. af . mi l / pr oduct i on/ 1/ af _se/ publ i cat i on/ af man91- 203/ af man91- 203. pdf .

Ai r For ce For m 592 USAF Wel di ng, Cut t i ng, and Br azi ng per mi t wi l l be i ssued pr i or t o any oper at i on and shal l be kept on si t e t i l l compl et i on of oper at i on or per mi t expi r es. Cont act Fi r e Pr ot ect i on at 325- 654- 3532/ 33/ 34 f or i ssuance of per mi t .

4. 7 FI RE ALARM SYSTEM:

The Cont r act or shal l r emove f i r e det ect i on devi ces i n accor dance wi t h ( I AW) pr oj ect document s, and r et ur n t o t he Gover nment . Any exi st i ng f i r e spr i nkl er heads and associ at ed pi pi ng ar e expect ed t o r emai n, and t he Cont r act or shal l ensur e t o pr ot ect f r om damage. Any damage by t he Cont r act or r equi r i ng r epai r or r epl acement shal l be bor ne by t he Cont r act or at no addi t i onal cost t o t he

SECTI ON 01 01 00 Page 6

Gover nment . Pr i or t o per f or mi ng any wor k or di sconnect i ng or shut t i ng of f any f i r e al ar m, f i r e spr i nkl er syst em, or hood and duct syst em, t he Ci v i l Engi neer Al ar ms shop at 325- 654- 1678 and Fi r e Pr ot ect i on 325- 654- 3532/ 33/ 34 shal l be not i f i ed by t he Cont r act or . Af t er compl et i ng wor k on any f i r e pr ot ect i on al ar m syst em, spr i nkl er , or commer ci al cooki ng suppr essi on syst em, t he pr oper compl et i on document s and/ or i nspect i on and t est document s, shal l be compl et ed and submi t t ed t o t he Cont r act i ng Of f i cer , t hat compl y wi t h NFPA 72, NFPA 13, NFPA 96, or NFPA 24 as appl i cabl e.

4. 8 BASE FI RE REGULATI ONS

The Cont r act or shal l compl y wi t h Base Fi r e Regul at i ons as set f or t h i n DAFMAN 91- 203 AI R FORCE OCCUPATI ONAL SAFETY, FI RE AND HEALTH STANDARDS i n ef f ect as of t he dat e of t hi s sol i c i t at i on. Al l wor k shal l be i n st r i ct compl i ance wi t h NFPA- 101. The Cont r act or shal l cal l ( 325) 654- 7000 f or al l emer genci es. The Cont r act or shal l use no expl osi ves or f i r e i n per f or mi ng t he wor k.

PART 5 STREET CLOSI NGS

Tr ai ni ng exer ci ses ar e expect ed t o cont i nue i n t he hi gh bay ar eas dur i ng demol i t i on and const r uct i on act i v i t i es. The Cont r act or shal l make al l ef f or t s t o avoi d bl ocki ng PoE i nt o t he Hi gh Bay ar eas. Under no ci r cumst ance shal l t he Cont r act or l eave company t r ucks or vehi c l es par ked or unat t ended bl ocki ng hi gh bay ent r ances. Cont r act or shal l pr ovi de saf et y measur es such as r ef l ect or s, s i gnage, f l ashi ng l i ght s or f enci ng as necessar y t o ensur e saf et y t o pedest r i an/ vehi cul ar t r af f i c near t he hi gh bay ar ea.

PART 6 DI SPOSI TI ON OF WASTE AND EXCESS MATERI ALS

6. 1 WASTE DETERMI NATI ON

The Cont r act or shal l make wast e det er mi nat i ons f or al l wast es gener at ed i n t he per f or mance of t hi s cont r act , i n accor dance wi t h t he pr ovi s i ons set out i n 40 Code of Feder al Regi st er ( CFR) Par t 261, at t he t i me and poi nt of gener at i on. The Cont r act or shal l pr oper l y sampl e, anal yze, or by use of pr ocess knowl edge cl assi f y al l wast es i n accor dance wi t h Ti t l e 30 Texas Admi ni st r at i ve Code ( TAC) , Chapt er 335, Subchapt er R at no addi t i onal cost t o t he Gover nment . Unl ess t he Cont r act or can demonst r at e t hat a wast e i s non- hazar dous, t he Cont r act or shal l manage t he wast e as a hazar dous wast e unt i l sampl e t est r esul t s pr ove ot her wi se. Al l non- hazar dous wast es, speci al wast es, and hazar dous wast es ( i ncl udi ng but not l i mi t ed t o const r uct i on debr i s, mat er i al cont ai ner s, mat er i al r esi dues, and unwant ed excess mat er i al s) r esul t i ng f r om t he per f or mance of wor k under t hi s cont r act shal l be r emoved f r om and di sposed of of f Goodf el l ow AFB by t he Cont r act or at no addi t i onal cost t o t he Gover nment and i n accor dance wi t h al l appl i cabl e Feder al , St at e, and l ocal l aws, r ul es, and r egul at i ons.

Under no ci r cumst ances shal l t he Cont r act or di spose of wast es or excess mat er i al i n t r ash dumpst er s, st or m sewer s, sani t ar y sewer s, cr eeks, st r eams, or ot her pr oper t y of Goodf el l ow AFB. The Cont r act or and t he Gover nment wi l l be co- gener at or s of al l wast es r esul t i ng f r om t he per f or mance of t hi s cont r act . Ref er t o Sect i on 01400- Envi r onment al Pr ot ect i on, par agr aph 3, DI SPOSAL OF WASTES, f or speci al r equi r ement s on di sposal of wast e t ypes.

6. 2 DUMPI NG OF CONCRETE TRUCKS

Dumpi ng/ cl eani ng out of concr et e t r ucks on Goodf el l ow AFB i s pr ohi bi t ed.

SECTI ON 01 01 00 Page 7

Concr et e t r uck chut es onl y may be r i nsed at t he const r uct i on s i t e.

Wast ewat er and concr et e f r om t hi s r i nse shal l be col l ect ed i n a hi gh- densi t y pol yet hyl ene ( HDPE) pl ast i c- l i ned box or pi t pr ovi ded by t he Cont r act or at t he s i t e. At t he end of pour i ng oper at i ons, t he Cont r act or shal l excavat e al l t he wast e and l i ner and pr oper l y di spose of same. The pi t shal l be compl et el y backf i l l ed and t he si t e r est or ed t o or i gi nal condi t i ons.

6. 3 CONTRACTOR SALVAGE

Al l equi pment and mat er i al s t o be r emoved f r om t he pr oj ect s i t e not speci f i cal l y i dent i f i ed f or t ur n- i n t o t he Gover nment shal l become t he pr oper t y of t he Cont r act or upon i ssuance of t he Not i ce t o Pr oceed ( NTP) .

The Cont r act or shal l t ur n- i n al l mat er i al s speci f i cal l y desi gnat ed f or t ur n- i n t o t he Gover nment t o a l ocat i on at Goodf el l ow AFB, as desi gnat ed by t he Cont r act i ng Of f i cer . The Cont r act or shal l obt ai n a r ecei pt f r om t he Gover nment empl oyee r esponsi bl e f or r ecei v i ng t he r et ur ned equi pment or mat er i al as evi dence of compl i ance. A copy of t he r ecei pt ( s) shal l be submi t t ed t o t he Cont r act i ng Of f i cer pr i or t o f i nal i nspect i on of t he pr oj ect . The f ol l owi ng i t ems shal l be r et ur ned t o t he Gover nment :

1. Al l f i r e det ect i on devi ces as not ed above.

2. Any f i r e ext i ngui sher s af f ect ed by demol i t i on.

3. Exi st i ng wooden benches i n t he men' s l ocker r oom ar eas.

PART 7 STORAGE AREAS

Ther e ar e no Gover nment f ur ni shed cover ed or secur e st or age ar eas.

Li mi t ed st or age may be per mi t t ed at t he di scr et i on of t he Cont r act i ng Of f i cer and on a space avai l abl e basi s. The l ocat i on on Goodf el l ow AFB of t he Cont r act or ' s t empor ar y f i el d of f i ce, st or age, and ot her const r uct i on bui l di ngs r equi r ed t empor ar i l y i n t he per f or mance of t he wor k, shal l r equi r e wr i t t en appr oval of t he Cont r act i ng Of f i cer . Pl ans showi ng t empor ar y f i el d of f i ce, st or age, and ot her const r uct i on bui l di ngs shal l be submi t t ed f or Gover nment Appr oval ( GA) . Ut i l i t i es at t he st or age ar ea may or may not be avai l abl e f or Cont r act or use. The Gover nment i mpl i es no r esponsi bi l i t y f or l ost or st ol en mat er i al s, equi pment , or t ool s, t he secur i t y of whi ch l i es sol el y wi t h t he Cont r act or . Cont r act or shal l keep hi s st or age ar eas cl ean, neat , and or der l y.

Cont r act or shal l mow gr ass and weedy veget at i on when i t r eaches a hei ght of 6 i nches. Mowi ng shal l be t o a hei ght of 3 i nches. Mowi ng shal l be accompl i shed wi t h a r ot ar y mower t hat l eaves t he cl i ppi ngs evenl y di st r i but ed on t he soi l sur f ace. Mowi ng shal l be accompl i shed dur i ng per i ods and i n a manner t hat t he soi l and gr ass wi l l not be damaged.

Towed or sel f - pr opel l ed r i di ng mower s shal l not be oper at ed wi t hi n 3 f eet of shr ubs or t r ees. Cont r act or shal l mow ar eas adj acent t o shr ubs and t r ees wi t h hand pr opel l ed mower s.

7. 1 TEMPORARY FENCI NG

The Cont r act or shal l f ence- i n and secur e t he wor k s i t e and l ay down ar ea.

Thi s ar ea shal l pr ovi de f or of f i ce space, equi pment , and mat er i al st or age.

New mat er i al s shal l be secur ed, pr ot ect ed, and pl aced on dunnage. At no t i me wi l l new mat er i al s be al l owed t o be pl aced on bar e gr ound. The f ence shal l be mi ni mum 6' - 0" hi gh por t abl e chai n l i nk wi t h por t abl e i nt er l ocki ng panel s, pedest r i an gat e( s) , and/ or vehi cul ar gat e( s) . Fenci ng shal l be mai nt ai ned by t he Cont r act or t hr oughout t he l i f e of t he cont r act .

Tempor ar y f enci ng shal l be secur ed wi t h sandbags due t o expect ed hi gh

SECTI ON 01 01 00 Page 8 wi nds i n t he pr oj ect wor k ar ea. Tempor ar y f enci ng used by t he Cont r act or t o del i neat e const r uct i on s i t es shal l be secur el y anchor ed wi t h t ensi on wi r es and post s as r equi r ed t o pr event saggi ng and an unsi ght l y appear ance. Any exi st i ng s i t e i mpr ovement s al t er ed by t he pr esence of t he f ence shal l be r est or ed t o t hei r or i gi nal condi t i on and appear ance. Due t o hi gh wi nds i n West Texas, Cont r act or shal l t ake ever y pr ecaut i on t o pr ecl ude t r ash and mat er i al s f r om bl owi ng of f s i t e. I f t he Cont r act or r equi r es addi t i onal out s i de st or age space, t hey shal l cont act t he Cont r act i ng Of f i cer wi t h a wr i t t en r equest t o i ncl ude a s i ngl e- l i ne s i t e pl an di agr am wi t h speci f i c di mensi ons.

7. 2 SI GNAGE

The Cont r act or shal l be r esponsi bl e f or pr ovi di ng sui t abl e, appr oved si gns, bar r i cades, r oped bar r i er s, et c. , t o war n occupant s of hazar dous ar eas at t he j ob s i t e f or t he ent i r e dur at i on of t he cont r act at no addi t i onal cost t o t he cont r act . Under no ci r cumst ances shal l t he Cont r act or open cut t he any ar eas out si de t he SoO wi t hout pr i or not i ce, appr oval , and r eason f or doi ng so. Al so, t he Cont r act or shal l al ways ensur e saf e passage f or al l pedest r i an/ st udent access.

7. 3 HOLES AND TRENCHES

Al l hol es whi ch ar e l ef t open shal l be sur r ounded wi t h a 48- i nch- hi gh mesh f ence wi t h hi ghl y v i s i bl e or ange pl ast i c, war ni ng si gns, and bl i nki ng l i ght f r om dusk t o dawn. When not bei ng wor ked, al l exposed t r enches and hol es shal l be cover ed wi t h t hr ee quar t er i nch pl ywood or a met al gr at i ng t hat wi l l pr event anyone f r om ent er i ng t he t r ench/ hol e.

PART 8 TOI LET FACI LI TI ES

The Cont r act or shal l pr ovi de t hei r own por t abl e/ t empor ar y t oi l et f aci l i t i es. Locat i on of por t abl e t oi l et f aci l i t i es shal l be wi t hi n t he Cont r act or Mobi l i zat i on/ and or St or age ar ea. At no t i me shal l t he Cont r act or use t he exi st i ng t oi l et f aci l i t i es.

PART 9 CLEANUP

The Cont r act or shal l at al l t i mes keep t he const r uct i on s i t e, const r uct i on t r ai l er ( s) / bui l di ng( s) , and st or age ar ea( s) i n a c l ean, neat , wor kman l i ke condi t i on, f r ee f r om accumul at i on of wast e, r ubbi sh, weeds, over gr own gr ass, or const r uct i on debr i s, t o t he sat i sf act i on of t he Cont r act i ng Of f i cer . Al l l oose or l i ght wei ght mat er i al s shal l be secur ed t o pr event bl owi ng or scat t er i ng. The bur ni ng of t r ash or const r uct i on debr i s i s st r i ct l y pr ohi bi t ed on Goodf el l ow AFB. Pr i or t o f i nal i nspect i on, t he Cont r act or shal l r emove al l const r uct i on debr i s, t ool s, equi pment , and mat er i al s not t he pr oper t y of t he Gover nment . Upon compl et i on of t he wor k, t he Cont r act or shal l l eave t he wor k s i t e and st or age ar ea( s) i n a c l ean, neat , and wor kmanl i ke condi t i on sat i sf act or y t o t he Cont r act i ng Of f i cer . Ref er t o Sect i on 01400 - Envi r onment al Pr ot ect i on, f or Post - Const r uct i on Cl eanup or Obl i t er at i on.

9. 1 SI TE CLEANLI NESS

Al l Cont r act or t r ai l er s shal l mai nt ai n a pr of essi onal appear ance. The Cont r act or shal l col l ect al l t r ash, debr i s, r ef use, gar bage, et c. , t hat i s gener at ed and pl ace i t i n appr opr i at e di sposal cont ai ner s wi t h l i ds on a per i odi c basi s or as di r ect ed by t he Cont r act i ng Of f i cer ' s Repr esent at i ve.

Di sposal shal l be out si de t he l i mi t s of Gover nment pr oper t y. Di sposal

SECTI ON 01 01 00 Page 9 shal l be by sani t ar y l andf i l l or ot her appr oved met hods and shal l conf or m t o al l l ocal , st at e, and f eder al gui del i nes, cr i t er i a, and r egul at i ons.

Rest or at i on of t he or i gi nal gr ound cont our s i s r equi r ed unl ess ot her wi se di r ect ed by t he Cont r act i ng Of f i cer ' s Repr esent at i ve.

9. 2 CONTRACTOR STORAGE AND DELI VERI ES

Al l equi pment and mat er i al s del i ver ed shal l be secur ed wi t h pr ot ect i on f r om t he weat her , hi gh wi nds, humi di t y, t emper at ur e var i at i on, di r t , and any ot her cont ami nant s. The pr oj ect document s wi l l desi gnat e Cont r act or st or age and l aydown yar ds. Al l pr oj ect st or age ar eas shal l be kept f r ee of debr i s, l eaks, st ai ns, or spl ashes and kept i n a neat , c l ean, and saf e condi t i on. Any cont ami nat i on of t he st or age ar ea by a hazar dous subst ance shal l be i mmedi at el y r emedi at ed by t he Cont r act or , i n accor dance wi t h t he cont r act above at no addi t i onal expense t o t he Gover nment . Upon compl et i on of t he wor k, t he Cont r act or shal l l eave t he wor k s i t e and st or age ar ea( s) i n a c l ean, neat , and wor kmanl i ke condi t i on sat i sf act or y t o t he Cont r act i ng Of f i cer .

PART 10 CONTRACTOR RESPONSI BI LI TI ES

10. 1 GENERAL

Cont r act or shal l pr ovi de t he Gover nment a mi ni mum 24 hour s wr i t t en not i ce pr i or t o t he schedul ed i nspect i on. Any wor k t hat cover s or i nhi bi t s t he abi l i t y of a gover nment i nspect or f r om compl et i ng hi s QA i nspect i ons under st andar d const r uct i on condi t i ons i s subj ect t o r emoval and r epl acement at t he Cont r act or ' s expense.

10. 2 QUALI TY ASSURANCE ( QC)

I n al l wor k per f or med, i t i s t he Cont r act or ' s r esponsi bi l i t y t o per f or m pr oper QC i nspect i ons t hr oughout t he pr oj ect t o ensur e a qual i t y pr oduct .

The Gover nment i nspect or i s r esponsi bl e f or adequat e Qual i t y Assur ance ( QA) f or t he wor k accompl i shed. I t i s not t he r ol e of t he Gover nment t o per f or m t he Cont r act or ' s QC f or t he pr oj ect , especi al l y dur i ng i nspect i ons. Al l wor k r egar di ng meet i ngs and i nspect i ons shal l be per f or med by t he Cont r act or i n accor dance wi t h t he at t ached Pr oj ect Document s.

10. 3 RED ZONE

The t er m " Red Zone" r ef er s t o t he l ast 20% or so of act ual const r uct i on dur i ng whi ch BCE, Cont r act or , and I nst al l at i on St akehol der s must make a coor di nat ed ef f or t t o compl et e physi cal const r uct i on, as wel l as al l r equi r ed document at i on, f i nanci al act i ons, per mi t r equi r ement s, syst em commi ssi oni ng and t r ai ni ng of oper at or s. The Cont r act or shal l i ni t i at e, schedul e, or gani ze and l ead t hi s meet i ng. Upon r equest addi t i onal i nf or mat i on on t he Red Zone meet i ng wi l l be pr ovi ded t o t he Cont r act or .

10. 4 PRE- FI NAL I NSPECTI ON

The Cont r act or shal l conduct a pr e- f i nal wal k- t hr ough i nspect i on and publ i sh t he pr e- f i nal i nspect i on f i ndi ngs i n a pr e- f i nal i nspect i on r epor t . The Cont r act or shal l cer t i f y t hat 100% of t he Cont r act or ' s QC punch l i s t i s compl et ed pr i or t o r equest s f or a Gover nment pr e- f i nal i nspect i on, wi t h t hei r compl et ed QC punch l i s t at t ached. The Cont r act or shal l conduct a pr e- f i nal wal k- t hr ough i nspect i on wi t h a Gover nment r epr esent at i ve and publ i sh t he i nspect i on f i ndi ngs i n a Gover nment

SECTI ON 01 01 00 Page 10 pr e- f i nal i nspect i on r epor t . Cont r act or shal l compl y wi t h al l appl i cabl e pr ovi s i ons l i s t ed i n t he at t ached Pr oj ect Document s r egar di ng pr e- f i nal i nspect i on r equi r ement s. Pr e- f i nal i nspect i on r epor t shal l i ncl ude a l i s t of Cont r act or war r ant y and manuf act ur er war r ant y books/ cer t i f i cat es f r om newl y i nst al l ed equi pment and mat er i al s. At t he pr e- f i nal i nspect i on, t he Cont r act or shal l pr esent a dr af t DD For m 1354, Tr ansf er and Accept ance of Real Pr oper t y t o t he Base Ci vi l Engi neer ( BCE) or ot her appr opr i at e or gani zat i on f or r evi ew. DD For m 1354 wi l l be f ur ni shed by t he Gover nment upon r equest . The Cont r act or shal l be r esponsi bl e f or compl et i ng and submi t t i ng t o t he Gover nment t he Pr oj ect Cl oseout Checkl i st dur i ng t hi s Pr e- Fi nal I nspect i on.

10. 5 FI NAL I NSPECTI ONS

The Cont r act or shal l cer t i f y t hat 100% of t he pr e- f i nal punch l i s t i s compl et ed pr i or t o r equest s f or a Gover nment f i nal i nspect i on. The Cont r act or shal l conduct a f i nal i nspect i on and publ i sh t he f i ndi ngs i n a f i nal i nspect i on r epor t ( Punch Li st ) i n accor dance wi t h t he f or mat speci f i ed i n t he at t ached Pr oj ect Document s. The i nspect i on shal l concent r at e on t he i t ems i dent i f i ed at t he pr e- f i nal i nspect i on and r ecor ded i n t he pr e- f i nal r epor t . The f i nal i nspect i on r epor t shal l ( 1) cer t i f y t hat al l i t ems of t he desi gn have been i mpl ement ed and t hat t he const r uct i on i s compl et e; ( 2) i ncl ude a r ecor d of as- bui l t dr awi ngs and speci f i cat i ons ver i f y i ng t hat al l devel opment st andar ds have been met ; ( 3) schedul e t o compl et e t he punch l i s t ; ( 4) One year Cont r act or war r ant y and manuf act ur er war r ant y books/ cer t i f i cat es f r om newl y i nst al l ed equi pment and mat er i al s. At t he f i nal i nspect i on, t he Cont r act or shal l pr ovi de a compl et ed DD For m 1354, Tr ansf er and Accept ance of Real Pr oper t y t o t he Cont r act i ng Of f i cer . Ref er t o par agr aph 8. 6 DD FORM 1354 f or addi t i onal i nf or mat i on.

10. 6 PROGRESS MEETI NGS

The Cont r act or shal l at t end and suppor t weekl y pr ogr ess meet i ngs ei t her i n per son or v i a t el econf er ence t hr oughout t he l i f e of t he cont r act . The Cont r act or shal l pr epar e and mai nt ai n t he per i odi c meet i ng agenda r epor t whi ch shal l i ncl ude t he r ecor d of new and ol d di scussi on of t echni cal i ssues, per i odi c ear ned val ue pr ogr ess showi ng per cent compl et e act ual ver sus pl anned, t abul ar r epor t of l at e t asks der i ved f r om t he pr ogr ess updat ed I MS, a f our week l ook ahead, and t abul ar r epor t f or Request s f or I nf or mat i on ( RFI s) and submi t t al s ( open and upcomi ng) . The Cont r act or shal l pr epar e, and submi t f or r evi ew, pr esent at i on mat er i al s f or meet i ngs and an agenda. The Cont r act or shal l pr epar e mi nut es f or meet i ngs at t ended, i ncl udi ng t el econf er ences, and " Red Zone Meet i ngs" , and di st r i but e mi nut es t o at t endees wi t hi n t hr ee ( 3) wor ki ng days.

10. 7 SCHEDULES AND PLANNI NG CHARTS

The Cont r act or shal l be r esponsi bl e f or pr ovi di ng pr ogr ess schedul es f or t r acki ng wor k and payment pr ogr ess.

10. 7. 1 CONSTRUCTI ON PLANNI NG CHART ( CPC) :

The Cont r act or shal l pr epar e and submi t a CPC on an AF For ms 3064/ 3065 f or appr oval wi t hi n ( 30) t hi r t y cal endar days af t er awar d or as ot her wi se di r ect ed by t he CO f or Gover nment r evi ew, eval uat i on, and appr oval . The CPC shal l f ul l y descr i be t he means t o per f or m al l wor k i ncl udi ng but not l i mi t ed t o pr ovi di ng al l equi pment , t ool s, mat er i al s, suppl i es, t r anspor t at i on, super vi s i on, management , pr oposed pr oj ect schedul es, wor k

SECTI ON 01 01 00 Page 11 sequence pl ans, associ at ed conf i gur at i ons f or al l demol i t i on and new sani t ar y sewer pl umbi ng wor k i n an AF For m 3064 f or appr oval . The CPC shal l al so, det ai l t he pr oj ect schedul e and st at us usi ng Gant t char t s, whi ch shal l depi ct per cent compl et e f or each t ask. The Cont r act or shal l suppl y al l l abor , equi pment , and mat er i al s necessar y t o accompl i sh t he wor k assi gned unl ess ot her wi se speci f i ed. The Cont r act or shal l per f or m management and pl anni ng f unct i ons, i ncl udi ng per f or mance measur ement and st at us r epor t i ng t o ef f ect i vel y secur e and moni t or pr i me and sub- cont r act wor k.

10. 8 SI TE VI SI TS

The Cont r act or may vi s i t t he pr emi ses t o become t hor oughl y f ami l i ar wi t h det ai l s of t he wor k and wor ki ng condi t i ons, ver i f y di mensi ons i n t he f i el d, and shal l advi se t he Cont r act i ng Of f i cer of any di scr epanci es bef or e st ar t i ng t he wor k.

PART 11 TESTI NG

11. 1 TESTI NG REQUI REMENTS

Cost s of al l t est s, unl ess speci f i cal l y i ndi cat ed as bei ng per f or med by t he Gover nment , shal l be at t he Cont r act or ' s expense. The Cont r act or shal l schedul e al l t est s and not i f y t he Cont r act i ng Of f i cer or hi s/ her r epr esent at i ve i n a t i mel y manner pr i or t o any r equi r ed t est i ng. Al l t est r esul t s shal l be submi t t ed t o t he Cont r act i ng Of f i cer on AF For m 3000, Mat er i al Appr oval Submi t t al . Wher e t est r epor t s ar e t o be submi t t ed t o t he Cont r act i ng Of f i cer wi t hi n 24 hour s af t er t he t est s ar e per f or med, t he r esul t s may be f axed t o t he Cont r act i ng Of f i cer at a number pr ovi ded at t he pr econst r uct i on conf er ence.

11. 2 TESTI NG LI CENSURE

Test i ng l abor at or i es must be l i censed t o oper at e i n t he St at e of Texas and must meet t he f ol l owi ng:

- " Recommended Requi r ement s f or I ndependent Labor at or y Qual i f i cat i on" , publ i shed by Amer i can Counci l of I ndependent Labor at or i es

- Basi c r equi r ement s of l at est edi t i on of ASTM E329 " St andar d Recommended Pr act i ce f or I nspect i on and Test i ng Agenci es f or Concr et e, St eel , and Bi t umi nous Mat er i al s Used i n Const r uct i on"

- Lat est edi t i on of ASTM E 548, " Qual i f i cat i ons f or Test i ng Labs"

PART 12 AS- BUI LTS AND REAL PROPERTY DOCUMENTATI ON

12. 1 AS- BUI LTS

a. The Cont r act or shal l mai nt ai n t wo set s of pr oj ect dr awi ngs wi t h r ed- l i ned " as- bui l t " not at i ons and mar ki ngs. The Cont r act or shal l updat e t hese pl ans t o i ndi cat e " as- bui l t " const r uct i on and shal l submi t t hem t o t he Cont r act i ng Of f i cer pr i or t o f i nal i nspect i on under t he cover of an AF For m 3000. Updat ed not at i ons and mar ki ngs shal l be neat , c l ear , l egi bl e, and accur at e i n al l r espect s.

Exi st i ng As- Bui l t s of t he FTS, B3453 can be pr ovi ded by t he Gover nment upon r equest . The Cont r act or shal l mai nt ai n t wo set s of pr oj ect dr awi ngs wi t h r ed- l i ne " as- bui l t " not at i ons and mar ki ngs. Pr i or t o t he f i nal i nspect i on, t he Cont r act or shal l t r ansf er t hese r ed- l i ned changes t o a CADD f or mat t hat i s f ul l y compat i bl e wi t h Aut odesk' s Aut oCAD ver si on 2018 or gr eat er . The Cont r act or shal l submi t one f ul l s i ze har d copy set of

SECTI ON 01 01 00 Page 12 as- bui l t maps al ong wi t h el ect r oni c copi es i n pdf and CADD f or mat s. The Cont r act or shal l submi t t wo copi es of el ect r oni c f i l es on a CD or DVD under t he cover of an AF For m 3000. The CD or DVD l abel shal l cont ai n, at a mi ni mum, t he f ol l owi ng i nf or mat i on: ( 1) Br and and ver si on of t he CADD sof t war e used t o gener at e t he dr awi ng f i l es; ( 2) Shor t descr i pt i on of t he cont ent s i ncl udi ng a cr oss r ef er ence of t he dr awi ng f i l e names on t he CD or DVD and t he pr oj ect dr awi ngs sheet sequence number s or sheet t i t l es;

( 3) St at ement mar ki ng t he CD or DVD as " as- bui l t " dr awi ngs; and ( 4) any di r ect i ons r equi r ed t o open f i l es.

The Cont r act or shal l submi t an i nt er i m/ dr af t DD FORM 1354 wi t h al l r el evant dat a 30 days pr i or t o t he f i nal i nspect i on and t he f i nal DD FORM 1354 shal l be pr ovi ded at t he pr oj ect f i nal i nspect i on as pr escr i bed i n UFC 1- 300- 08. Ref er t o par agr aph 8. 6 DD FORM 1354 f or addi t i onal i nf or mat i on.

PART 13 SECURI TY REQUI REMENTS

13. 1 BASE ACCESS

Goodf el l ow Ai r For ce Base i s a c l osed/ cont r ol l ed access base. As an ef f or t t o mi ni mi ze peak t r af f i c f l ows at t he ent r y gat es, t he Cont r act or , hi s empl oyees, and hi s subcont r act or s ar e hi ghl y encour aged t o avoi d schedul i ng del i ver i es t hr ough t he ent r y cont r ol gat es f r om 7: 00 A. M. t o 8: 00 A. M. Monday t hr ough Fr i day as t her e coul d be si gni f i cant del ays.

The Gover nment wi l l conduct secur i t y/ backgr ound checks on al l const r uct i on per sonnel as r equi r ed. Secur i t y r equi r ement s wi l l be br i ef ed at t he pr e- const r uct i on conf er ence and handout s out l i ni ng speci f i c r equi r ement s wi l l be pr ovi ded. Scr eeni ng measur es ar e i n pl ace and sui t abi l i t y f or empl oyees t o access t he i nst al l at i on wi l l be det er mi ned dur i ng t he conf er ence. Requi r ement s ar e subj ect t o change dependent upon cur r ent wor l d s i t uat i ons, pot ent i al t hr eat s, and base exer ci ses. Ful l cooper at i on by Cont r act or wor k f or ces i s r equi r ed. Cont r act or shoul d ant i c i pat e cer t ai n not i f i cat i on and r epor t i ng r equi r ement s, pr epar at i on of f or ms, and l i s t s f or pass and i dent i f i cat i on of empl oyees and t hei r vehi c l es, ent r y r est r i ct i ons, key/ l ock cont r ol , and compl i ance wi t h al l base t r af f i c r ul es and r egul at i ons. The Jacobson Gat e Vi s i t or Cont r ol Cent er 325- 654- 4122 i s t he OPR f or passes.

13. 2 ACCESS LEVELS

Goodf el l ow AFB secur i t y may be vi ewed as bei ng one of t wo br oad l evel s, t he l evel i n ef f ect bei ng dependent on t he l ocat i on or ar ea of pr oj ect .

a. The l owest l evel of secur i t y exi st s i n gener al access ar eas. These ar eas ar e al l of Goodf el l ow AFB out si de of t he " USAF Cont r ol l ed" ar eas.

b. " USAF Cont r ol l ed" access ar eas ar e t he hi gher - l evel secur i t y ar eas.

Pr esence wi t hi n t hese cont r ol l ed access ar eas ar e by aut hor i zat i on and/ or escor t . The movement of aut hor i zed per sonnel i n and out of t hese ar eas may be l i mi t ed. Cont r act or per sonnel ar e per mi t t ed access t o t hese ar eas on a need basi s onl y. Access t o cont r ol l ed ar eas wi l l r equi r e t he Cont r act or t o coor di nat e al l r equest s t hr ough t he Gover nment or gani zat i on occupyi ng t he pr oj ect s i t e. The Cont r act or i s advi sed t her e may be del ays gai ni ng access t o cont r ol l ed ar eas. No del ay l ess t han one hour i n dur at i on wi l l be consi der ed f or down t i me, nor wi l l del ays of l ess t han one hour be cumul at i ve over sever al t i me per i ods.

SECTI ON 01 01 00 Page 13

13. 3 PROJECT ACCESS LEVEL

The wor k on t hi s cont r act wi l l be i n a Gener al Access/ USAF Cont r ol l ed Access ar ea.

13. 4 SECURI TY REQUI REMENTS

The Cont r act or shal l compl y at al l t i mes wi t h base l aw enf or cement and secur i t y r equi r ement s t o i ncl ude base pass r equi r ement s.

13. 4. 1 CONTRACTOR I NSTALLATI ON ACCESS PASS

Bef or e ar r i val , a Gover nment i dent i f i cat i on car d- hol di ng per son f r om t he sponsor i ng agency, Base Cont r act i ng of f i ce/ admi ni st r at or or appl i cabl e l ocal pr oj ect manager wi l l submi t a r equest f or base access usi ng t he 17 Tr ai ni ng Wi ng' s Base Access Li st ( BAL) memor andum as a f or m of r egi st r at i on f or each cr edent i al appl i cant . The base sponsor / sponsor i ng agency/ Cont r act i ng Of f i cer and t he cont r act ed management t eam shoul d est abl i sh an account abi l i t y pr ocess t o account f or each appl i cant , t o over see t he BAL pr ocess, and t o r et r i eve i nst al l at i on passes when access i s no l onger r equi r ed. Base sponsor s/ sponsor i ng agenci es or cont r act of f i cer s wi l l ensur e t he BAL i s accur at e, i t i s s i gned and f or war ded t o t he 17 SFS Pass & Regi st r at i on sect i on f or compl et i on of t he vet t i ng and f i t ness det er mi nat i on pr ocesses. The BAL shoul d be del i ver ed t o Pass & Regi st r at i on, l ocat ed at t he Vi s i t or Cont r ol Cent er ( VCC) . When del i ver y i s not possi bl e, t he BAL may be f or war ded t o Pass & Regi st r at i on v i a a " . mi l " emai l account l ocat ed on Goodf el l ow AFB. The BAL wi l l i ncl ude per t i nent v i s i t or i nf or mat i on, r eason f or ent r y, f r equency of ent r y, dest i nat i on, t i mes each day r equi r i ng ent r y, and dur at i on of r equest .

Cont r act or I ni t i al ( and per i odi c) I nst al l at i on Access Scr eeni ng. The Cont r act or shal l pr ovi de Pass and Regi st r at i on wi t h t wo f or ms of i dent i f i cat i on, one of whi ch wi l l be a st at e i ssued phot o i dent i f i cat i on.

Pr i or t o bei ng al l owed access, a mi ni mum of a backgr ound/ Nat i onal Cr i me I nf or mat i on Cent er ( NCI C) check wi l l be compl et ed on al…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .