2) AF Form 66.xlsx

Air Force Form XLSX spreadsheet 37 KB Posted

Attached to
HVAC Replacement for Building 140
Solicitation number
FA303024Q0026
Issued by

About this file

This document is an Excel spreadsheet titled "AF Form 66" which is a Schedule of Material Submittals for a capital project to replace three 7.5-ton rooftop packaged HVAC units at Building 140. The project is part of Solicitation/Contract No. FA303024Q0026 for the "HVAC Replacement for Building 140" at Goodfellow Air Force Base.

The key details include: the required submittals such as accident prevention plan, dumpster location, warranties, parking and storage area, work clearance request, planned outages, disposition of waste materials, environmental hazardous waste record, hazardous materials, air emissions report, construction waste management, construction product minimums, and daily reports. The required number of copies, certification required, and due dates for each submittal are specified. This is an attached document to the overall federal contract opportunity, which is a small business set-aside solicitation for the HVAC replacement project. The government is seeking quotes due by June 21, 2024 at 2:30 PM CDT.

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIAL SUBMITTALSCAPITAL PROJECT:PROJECT TITLE: B140 Package Unit ReplacementSOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY THE PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL (Ref spec & para no.)CERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYOPERATING INSTRUCTIONSSEE PARA ON COPIESOTHERS AS SPECIFIEDREQUIRED SUBMISSION DATEDATE RECEIVED IN CON-TRACTINGDATE TO CIVIL ENGINEER-INGRETURN SUSPENSE DATEFOLLOW UPDATE CONTRACTOR NOTIFIEDCONTRACT-TOR RE-SUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
2Part 1, 1.7.1 Accident Prevention Plan4(e)FIO
3Part 1, 1.9.4 Dumpster Location4(c)GA
4Part 1, 1.12 Warranties4(b)GA
5Part 1, 1.13.1 Parking and Storage Area4(c)GA
6Part 1, 1.14.1.1 Work Clearance Request, AF Form 1034(e)GA
7Part 1, 1.14.2 Planned Outages414 Days Prior (d)GA
8Part 1, 1.15, Disposition of Waste Materials4(b)FIO
9Part 2, 2.2, Environmental Hazardous Waste Record4(a)GA
Part 2, 2.4.1, Certificate certifing no asbestos was used in construction4(b)FIO
8Part 2, 2.5, Hazardous Materials, SDS4(c)GA
9Part 2, 2.8, Air Emissions Report4Monthly (d)FIO
10Part 2, 2.9, Construction Waste Management Form Submittal4(d)GA
11Part 2, 2.11.2.2 Construction Product minimums4(d)GA
Part 3, 3.4, Parts and Materials4(e)GA
12Part 4, 4.3 Daily Reports4(d)GA
AF Form 66
When applicable:
(a) As soon as possible but in no case later than 45 calendar days after NTP
(b) Prior to Final Inspection
(c) Prior to Use.
(d) As Required.
(e) Prior to Start of Construction

PAGE &P OF &N

FORM66.xls

File details come from the government source that posted it. Updated .