2) AF Form 66.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
HVAC Replacement for Building 140 Federal contract opportunity
Solicitation number
FA303024Q0026
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document is an Excel spreadsheet titled "AF Form 66" which is a Schedule of Material Submittals for a capital project to replace three 7.5-ton rooftop packaged HVAC units at Building 140. The project is part of Solicitation/Contract No. FA303024Q0026 for the "HVAC Replacement for Building 140" at Goodfellow Air Force Base.

The key details include: the required submittals such as accident prevention plan, dumpster location, warranties, parking and storage area, work clearance request, planned outages, disposition of waste materials, environmental hazardous waste record, hazardous materials, air emissions report, construction waste management, construction product minimums, and daily reports. The required number of copies, certification required, and due dates for each submittal are specified. This is an attached document to the overall federal contract opportunity, which is a small business set-aside solicitation for the HVAC replacement project. The government is seeking quotes due by June 21, 2024 at 2:30 PM CDT.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIAL SUBMITTALSCAPITAL PROJECT:PROJECT TITLE: B140 Package Unit ReplacementSOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY THE PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL (Ref spec & para no.)CERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYOPERATING INSTRUCTIONSSEE PARA ON COPIESOTHERS AS SPECIFIEDREQUIRED SUBMISSION DATEDATE RECEIVED IN CON-TRACTINGDATE TO CIVIL ENGINEER-INGRETURN SUSPENSE DATEFOLLOW UPDATE CONTRACTOR NOTIFIEDCONTRACT-TOR RE-SUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
2Part 1, 1.7.1 Accident Prevention Plan4(e)FIO
3Part 1, 1.9.4 Dumpster Location4(c)GA
4Part 1, 1.12 Warranties4(b)GA
5Part 1, 1.13.1 Parking and Storage Area4(c)GA
6Part 1, 1.14.1.1 Work Clearance Request, AF Form 1034(e)GA
7Part 1, 1.14.2 Planned Outages414 Days Prior (d)GA
8Part 1, 1.15, Disposition of Waste Materials4(b)FIO
9Part 2, 2.2, Environmental Hazardous Waste Record4(a)GA
Part 2, 2.4.1, Certificate certifing no asbestos was used in construction4(b)FIO
8Part 2, 2.5, Hazardous Materials, SDS4(c)GA
9Part 2, 2.8, Air Emissions Report4Monthly (d)FIO
10Part 2, 2.9, Construction Waste Management Form Submittal4(d)GA
11Part 2, 2.11.2.2 Construction Product minimums4(d)GA
Part 3, 3.4, Parts and Materials4(e)GA
12Part 4, 4.3 Daily Reports4(d)GA
AF Form 66
When applicable:
(a) As soon as possible but in no case later than 45 calendar days after NTP
(b) Prior to Final Inspection
(c) Prior to Use.
(d) As Required.
(e) Prior to Start of Construction

PAGE &P OF &N

FORM66.xls