18. AF Form 66 FBNV190002.xlsx
XLSX spreadsheet 25 KB Posted
- Solicitation number
- FA487724B0001
About this file
This document outlines the requirements for a federal solicitation to repair and construct primary electric distribution at Davis-Monthan Air Force Base in Arizona. The project scope includes repair, construction, and demolition activities to design and construct a switch house facility. All work must comply with base design guidelines, Air Force standards, and cybersecurity controls. Interested contractors must submit Entry Authorization Letters for individual requesting base access by March 15, 2024 to be eligible for consideration. The solicitation number is FA487724B0001 and was issued by the Department of the Air Force Air Combat Command.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF Form 66
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE: | SOLICITATION/CONTRACT NO.: | ||||||||||||||||||||
| FBNV190002 | Repair/Construct Primary Electric Distribution for Energy Resiliency, Contract “A” Substation Only” | Construct/Build | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | NO. OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | |||||||||||||
| 01 Preconstruction Submittals | 02 Shop Drawings | 03 Product Data | 04 Samples | 05 Design Data | 06 Test Reports | 07 Certificates | 08 Manufacturer's Instructions | 09 Manufacturer's Field Reports | 10 Operation and Maintenance Manuals | 11 Closeout Submittal | Awarded: | ||||||||||||
| Pre-Con: | |||||||||||||||||||||||
| NTP: | |||||||||||||||||||||||
| Const. Start: | |||||||||||||||||||||||
| Const. End: | |||||||||||||||||||||||
| Finalled: | |||||||||||||||||||||||
| DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |||||||||||||||||
| APPROVED | DISAPPROVED | ||||||||||||||||||||||
| 1 | AF Form 103 Job Order | ||||||||||||||||||||||
| Sec 01010, Para 1.3c | 1 | ||||||||||||||||||||||
| 2 | Affidavits | ||||||||||||||||||||||
| Sec 01010, Para 1.6a | 1 | ||||||||||||||||||||||
| 3 | Certifications | ||||||||||||||||||||||
| Sec 01010, Para 1.6b | 1 | ||||||||||||||||||||||
| 4 | Hazardous Material Usage |
Sec 01010, Para 2.5c
| Env Cont Guide Sec 3.3 Hazardous Material | 3 | ||
| 5 | HAZMAT Usage Reports |
Sec 01010, Para 2.5c Env Cont Guide Sec 3.4 HAZMAT Usage 2 (1st of the month for projects >60days) (End of project for projects <60 days) 6 Air Quality Activity Permit Sec 01010, Para 2.5d
| Env Cont Guide Sec 3.3 Air Quality | 1 | 7 Days after Reciept of Permit | |
| 7 | AZPDES General Permit |
Sec 01010, Para 2.5d
| Env Cont Guide Sec 3.3 SWPP | 2 | 2 Days Prior to Construction | ||
| 8 | Asbestos Removal/Demolition Activity Permit |
Sec 01010, Para 2.5d
| Env Cont Guide Sec 3.3 Asbestos | 1 | 7 Days after Reciept of Permit | ||
| 9 | LBP Removal/Demolition Activity Permit |
Sec 01010, Para 2.5d
| Env Cont Guide Sec 3.3 Lead-Based Paint | 1 | 7 Days after Reciept of Permit | ||
| 10 | Arizona Department of Agriculture Permit |
Sec 01010, Para 2.5d
| Env Cont Guide Sec 3.3 Protection of Native Plants | 1 | 7 Days after Reciept of Permit | |
| 11 | Asbestos Removal/Demolition Abatement Plan |
Sec 01010, Para 2.5e
| Env Cont Guide Sec 3.3 Asbestos | 2 | 7 Days after Reciept of Asbestos Demolition Permit | ||
| 12 | Construction & Demolition Debris Diversion Plan |
Sec 01010, Para 2.5e
| Env Cont Guide Sec 3.3 C&D Plan | 3 | ||
| 13 | SWPP Plan | ||
| Sec 01010, Para 2.5f | 1 | ||
| 14 | Asbestos Manifests |
Sec 01010, Para 2.5h
| Env Cont Guide Sec 3.4 Asbestos Removal | 2 | 7 Days After Reciept of Manifest | ||
| 15 | Non-Regulated Waste |
Sec 01010, Para 2.5h
| Env Cont Guide Sec 3.4 Regulated Hazardous Waste | 2 | 3 days after Disposal | ||
| 16 | Regulated Waste Disposal |
Sec 01010, Para 2.5h
| Env Cont Guide Sec 3.4 Regulated Hazardous Waste | 2 | Coordinated Prior to Removal from Installation | ||
| 17 | Regulated Waste Manifests |
Sec 01010, Para 2.5h
| Env Cont Guide Sec 3.4 Regulated Hazardous Waste | 2 | 3 Days after Disposal | ||
| 18 | Recycling Manifests |
Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Waste & Recyclables 2 (1st of the month for projects >60days) (End of project for projects <60 days) 19 Non-Hazardous Waste Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Waste & Recyclables 2 (1st of the month for projects >60days) (End of project for projects <60 days) 20 Radioactive Use Sec 01010, Para 2.5i
| Env Cont Guide Sec 3.3 Radioactive Material | 1 | |||||||
| 21 | Progress Photographs | |||||||
| Sec 01010, Para 2.8 | 1 | |||||||
| 22 | Record As-Builts | |||||||
| Sec 01010, Para 3.2.2.a | 1 | |||||||
| 23 | Record Disks | |||||||
| Sec 01010, Para 3.2.2.b | 1 | |||||||
| 24 | DD Form 1354 | |||||||
| Sec 01010, Para 3.2.2.c.1 | 1 | |||||||
| 25 | DD Form 1354 Checklist | |||||||
| Sec 01010, Para 3.2.2.c.2 | 1 | |||||||
| 26 | Warranty/Guarantee Items | |||||||
| Sec 01010, Para 3.2.2.c.3 | 1 | |||||||
| 27 | O&M Manual | |||||||
| Sec 01010, Para 3.2.2.d | 3 | |||||||
| 28 | AF Form 3064, Construction Schedule | |||||||
| Sec 01011, Para 1.5.1 | 1 | |||||||
| 29 | Design Charrette Submittal Sec 01011, Para 2.10.1 | 1 Package-Provide Copies as indicated | ||||||
| 30 | 65% Design Submittal | |||||||
| Sec 01011, Para 2.10.3 | 1 Package-Provide Copies as indicated | |||||||
| 31 | 95% Design Submittal | |||||||
| Sec 01011, Para 2.10.4 | 1 Package-Provide Copies as indicated | |||||||
| 32 | 100% Design Submittal | |||||||
| Sec 01011, Para 2.10.5 | 1 Package-Provide Copies as indicated | |||||||
| 33 | Soil Compaction Test Results for Utilities and Facilities | |||||||
| Sec 01011, Para 3.3 | 1 | |||||||
| 34 | EMS Most Significant Environmental Aspects Awareness Form | |||||||
| Env Cont Guide Sec 3.2 & Appendix E | 1 | At PreCon Meeting | ||||||
| 35 | EMS Awareness Training | |||||||
| Env Cont Guide Sec 3.3 & Appendix F | 1 | At PreCon Meeting | ||||||
| 36 | Survey of Native Life | |||||||
| Env Cont Guide Sec 3.3 Protection of Native Birds & Wildlife | 1 | (7 Days after Reciept of Survey) |
Contact DM Env Ofice (x4035) for surveys already conducted
| 37 | Survey of Cultural Resources | |||
| Env Cont Guide Sec 3.3 Preservation of Cultural Resources | 1 | (7 Days after Reciept of Survey) |
Contact DM Env Ofice (x4035) for surveys already conducted
| 38 | Asbestos Survey | |||
| Env Cont Guide Sec 3.3 Asbestos | 1 | (7 Days after Reciept of Survey) |
Contact DM Env Ofice (x4885) for surveys already conducted
| 39 | Lead-Based Paint Survey | |||
| Env Cont Guide Sec 3.3 Lead-Based Paint | 1 | (7 Days after Reciept of Survey) |
Contact DM Env Ofice (x4885) for surveys already conducted
| 40 | Outdoor Painting Exemption | |||
| Env Cont Guide Sec 3.3 Minimize Organics | 1 | 7 Days after Reciept of Excemption | ||
| 41 | Notice of Intent to Drill | |||
| Env Cont Guide Sec 3.3 NOI to Drill | 1 | 7 Days after Reciept of Drill Card | ||
| 42 | Drill Card | |||
| Env Cont Guide Sec 3.3 NOI to Drill | 1 | 7 Days after Reciept of Drill Card | ||
| 43 | SWPP Plan | |||
| Env Cont Guide Sec 3.3 SWPP | 1 | 2 Days Prior to Construction | ||
| 44 | Radioactive Use | |||
| Env Cont Guide Sec 3.3 Radioactive Material | 1 | 7 Days after NTP | ||
| 45 | Recovered Materials Certification | |||
| Env Cont Guide Sec 3.5 Recovered Materials | 2 | 7 Days after Construction Complete |
(Only for Contracts >$100,000)
| 46 | Notice of Termination | ||||
| Env Cont Guide 3.5 SWPP Plan | 2 | 7 Days after Construction Complete | |||
| 47 | (AMRS/EMCS) Change Request (CR) Form | ||||
| SOW Para X | 1 | ||||
| 48 | (AMRS/EMCS) 5-Level Topology | ||||
| SOW Para X | 1 | ||||
| 49 | (AMRS/EMCS) Base System Hardware (HW) & Software (SW) List | ||||
| SOW Para X | 1 | ||||
| 50 | (AMRS/EMCS) Civil Engineer Control System (CECS) Inventory | ||||
| SOW Para X | 1 | ||||
| 51 | Contractor to add Submittals as required or requested. | ||||
| 52 | |||||
| 53 | |||||
| 54 | |||||
| 55 | |||||
| 56 | |||||
| 57 | |||||
| 58 | |||||
| 59 | |||||
| 60 | |||||
| 61 | |||||
| 62 | |||||
| 63 | |||||
| 64 | |||||
| 65 | |||||
| 66 | |||||
| 67 | |||||
| 68 |
AF FORM 66
(Computer Generated) PAGE &P of &N