18. AF Form 66 FBNV190002.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Repair and Construct Primary Electric Distribution
Solicitation number
FA487724B0001
Issued by

About this file

This document outlines the requirements for a federal solicitation to repair and construct primary electric distribution at Davis-Monthan Air Force Base in Arizona. The project scope includes repair, construction, and demolition activities to design and construct a switch house facility. All work must comply with base design guidelines, Air Force standards, and cybersecurity controls. Interested contractors must submit Entry Authorization Letters for individual requesting base access by March 15, 2024 to be eligible for consideration. The solicitation number is FA487724B0001 and was issued by the Department of the Air Force Air Combat Command.

View the file

Other files

File Type Posted
Solicitation Amendment - FA487724B00010003.pdf PDF
Solicitation Amendment FA487724B00010003 SF 30.pdf PDF
23. Wage Determination - AZ20240040.pdf PDF
Solicitation - FA487724B0001.pdf PDF
Solicitation Amendment FA487724B00010002 SF 30.pdf PDF
21. FBNV190002 RFI ANSWERS.xlsx XLSX spreadsheet
9. DMAFB Electrical Distribution - Drawing Set - 100 pct - REV 1.pdf PDF
8. DMAFB Electrical Dist - Design Analysis - 100 percent - REV 1.pdf PDF
6. 5015-21-3104 DMAFB Substation Specs - REV 1.pdf PDF
3. 5015-21-3104 DMAFB Substation - 100% Elec Calc Package - REV 1.pdf PDF
Solicitation Amendment FA487724B00010001.pdf PDF
2. 5015-21-3104 DMAFB Cutsheets -100pct - REV 1.pdf PDF
Solicitation - FA487724B0001.pdf PDF
7. DMAFB Electrical Dist - Cx Plan REV 1.pdf PDF
4. 5015-21-3104 DMAFB Substation - 100% Structural Calcs - REV 1.pdf PDF
22. Sign-In Sheet (3-26).pdf PDF
1. Specifications Package FBNV190002.pdf PDF
2. 5015-21-3104 DMAFB Cutsheets -100pct.pdf PDF
3. 5015-21-3104 DMAFB Substation - 100% Elec Calc Package.pdf PDF
13. Contractor Environmental Guide (15 May 2019).pdf PDF
14. DMAFB Design Compatibility Guidelines 2017.pdf PDF
17. AF Form 3052 (Blank) - FBNV190002.xlsx XLSX spreadsheet
20. Section B - Price Fill-In.pdf PDF
4. 5015-21-3104 DMAFB Substation - 100% Structural Calcs.pdf PDF
11. E-601 SINGLE LINE DIAGRAM.pdf PDF
12. DMAFB Installation Failure Action Plan.pdf PDF
15. 355 CS Base Design Guide 2021.pdf PDF
5. 5015-21-3104 DMAFB Substation P&C Report - 100%.pdf PDF
9. DMAFB Electrical Distribution - Drawing Set - 100 pct.pdf PDF
19. Template of Contractor EAL.xlsx XLSX spreadsheet
Solicitation - FA487724B0001.pdf PDF
6. 5015-21-3104 DMAFB Substation Specs 1.19.2024.pdf PDF
7. DMAFB Electrical Dist - Cx Plan.pdf PDF
8. DMAFB Electrical Dist - Design Analysis - 100 percent.pdf PDF
10. E-101 E-HOUSE PLAN.pdf PDF
16. Cybersecurity of Facility-Related Control Systems (01-18-2017).pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF Form 66

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER:PROJECT TITLE:SOLICITATION/CONTRACT NO.:
FBNV190002Repair/Construct Primary Electric Distribution for Energy Resiliency, Contract “A” Substation Only”Construct/Build
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALNO. OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVAL
01 Preconstruction Submittals02 Shop Drawings03 Product Data04 Samples05 Design Data06 Test Reports07 Certificates08 Manufacturer's Instructions09 Manufacturer's Field Reports10 Operation and Maintenance Manuals11 Closeout SubmittalAwarded:
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
1AF Form 103 Job Order
Sec 01010, Para 1.3c1
2Affidavits
Sec 01010, Para 1.6a1
3Certifications
Sec 01010, Para 1.6b1
4Hazardous Material Usage

Sec 01010, Para 2.5c

Env Cont Guide Sec 3.3 Hazardous Material3
5HAZMAT Usage Reports

Sec 01010, Para 2.5c Env Cont Guide Sec 3.4 HAZMAT Usage 2 (1st of the month for projects >60days) (End of project for projects <60 days) 6 Air Quality Activity Permit Sec 01010, Para 2.5d

Env Cont Guide Sec 3.3 Air Quality17 Days after Reciept of Permit
7AZPDES General Permit

Sec 01010, Para 2.5d

Env Cont Guide Sec 3.3 SWPP22 Days Prior to Construction
8Asbestos Removal/Demolition Activity Permit

Sec 01010, Para 2.5d

Env Cont Guide Sec 3.3 Asbestos17 Days after Reciept of Permit
9LBP Removal/Demolition Activity Permit

Sec 01010, Para 2.5d

Env Cont Guide Sec 3.3 Lead-Based Paint17 Days after Reciept of Permit
10Arizona Department of Agriculture Permit

Sec 01010, Para 2.5d

Env Cont Guide Sec 3.3 Protection of Native Plants17 Days after Reciept of Permit
11Asbestos Removal/Demolition Abatement Plan

Sec 01010, Para 2.5e

Env Cont Guide Sec 3.3 Asbestos27 Days after Reciept of Asbestos Demolition Permit
12Construction & Demolition Debris Diversion Plan

Sec 01010, Para 2.5e

Env Cont Guide Sec 3.3 C&D Plan3
13SWPP Plan
Sec 01010, Para 2.5f1
14Asbestos Manifests

Sec 01010, Para 2.5h

Env Cont Guide Sec 3.4 Asbestos Removal27 Days After Reciept of Manifest
15Non-Regulated Waste

Sec 01010, Para 2.5h

Env Cont Guide Sec 3.4 Regulated Hazardous Waste23 days after Disposal
16Regulated Waste Disposal

Sec 01010, Para 2.5h

Env Cont Guide Sec 3.4 Regulated Hazardous Waste2Coordinated Prior to Removal from Installation
17Regulated Waste Manifests

Sec 01010, Para 2.5h

Env Cont Guide Sec 3.4 Regulated Hazardous Waste23 Days after Disposal
18Recycling Manifests

Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Waste & Recyclables 2 (1st of the month for projects >60days) (End of project for projects <60 days) 19 Non-Hazardous Waste Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Waste & Recyclables 2 (1st of the month for projects >60days) (End of project for projects <60 days) 20 Radioactive Use Sec 01010, Para 2.5i

Env Cont Guide Sec 3.3 Radioactive Material1
21Progress Photographs
Sec 01010, Para 2.81
22Record As-Builts
Sec 01010, Para 3.2.2.a1
23Record Disks
Sec 01010, Para 3.2.2.b1
24DD Form 1354
Sec 01010, Para 3.2.2.c.11
25DD Form 1354 Checklist
Sec 01010, Para 3.2.2.c.21
26Warranty/Guarantee Items
Sec 01010, Para 3.2.2.c.31
27O&M Manual
Sec 01010, Para 3.2.2.d3
28AF Form 3064, Construction Schedule
Sec 01011, Para 1.5.11
29Design Charrette Submittal Sec 01011, Para 2.10.11 Package-Provide Copies as indicated
3065% Design Submittal
Sec 01011, Para 2.10.31 Package-Provide Copies as indicated
3195% Design Submittal
Sec 01011, Para 2.10.41 Package-Provide Copies as indicated
32100% Design Submittal
Sec 01011, Para 2.10.51 Package-Provide Copies as indicated
33Soil Compaction Test Results for Utilities and Facilities
Sec 01011, Para 3.31
34EMS Most Significant Environmental Aspects Awareness Form
Env Cont Guide Sec 3.2 & Appendix E1At PreCon Meeting
35EMS Awareness Training
Env Cont Guide Sec 3.3 & Appendix F1At PreCon Meeting
36Survey of Native Life
Env Cont Guide Sec 3.3 Protection of Native Birds & Wildlife1(7 Days after Reciept of Survey)

Contact DM Env Ofice (x4035) for surveys already conducted

37Survey of Cultural Resources
Env Cont Guide Sec 3.3 Preservation of Cultural Resources1(7 Days after Reciept of Survey)

Contact DM Env Ofice (x4035) for surveys already conducted

38Asbestos Survey
Env Cont Guide Sec 3.3 Asbestos1(7 Days after Reciept of Survey)

Contact DM Env Ofice (x4885) for surveys already conducted

39Lead-Based Paint Survey
Env Cont Guide Sec 3.3 Lead-Based Paint1(7 Days after Reciept of Survey)

Contact DM Env Ofice (x4885) for surveys already conducted

40Outdoor Painting Exemption
Env Cont Guide Sec 3.3 Minimize Organics17 Days after Reciept of Excemption
41Notice of Intent to Drill
Env Cont Guide Sec 3.3 NOI to Drill17 Days after Reciept of Drill Card
42Drill Card
Env Cont Guide Sec 3.3 NOI to Drill17 Days after Reciept of Drill Card
43SWPP Plan
Env Cont Guide Sec 3.3 SWPP12 Days Prior to Construction
44Radioactive Use
Env Cont Guide Sec 3.3 Radioactive Material17 Days after NTP
45Recovered Materials Certification
Env Cont Guide Sec 3.5 Recovered Materials27 Days after Construction Complete

(Only for Contracts >$100,000)

46Notice of Termination
Env Cont Guide 3.5 SWPP Plan27 Days after Construction Complete
47(AMRS/EMCS) Change Request (CR) Form
SOW Para X1
48(AMRS/EMCS) 5-Level Topology
SOW Para X1
49(AMRS/EMCS) Base System Hardware (HW) & Software (SW) List
SOW Para X1
50(AMRS/EMCS) Civil Engineer Control System (CECS) Inventory
SOW Para X1
51Contractor to add Submittals as required or requested.
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68

AF FORM 66