10. E-101 E-HOUSE PLAN.pdf
PDF 376 KB Posted
- Solicitation number
- FA487724B0001
About this file
This solicitation package outlines requirements for a primary electric distribution repair and construction project at Davis-Monthan Air Force Base in Arizona. The project scope includes repair, construction, and demolition work to design and construct a new switch house facility. All work must comply with current base design guidelines, engineering manuals, and cybersecurity standards. Bidders must have the ability to bring existing facility systems up to code and provide supervision to complete the project. The solicitation package and 20 accompanying attachments provide a comprehensive overview of solicitation requirements. The submission deadline for Entry Authorization Letters is March 15, 2024 at 1:00 pm local time, and name changes will not be permitted after submission. The Department of the Air Force Air Combat Command is the issuing agency.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOWER POWER CABLE
GLAND PLATES
PERSONNEL
DOOR
(DOOR B) EQUIPMENT DOOR
(DOOR A)
HV
AC
#1
BATTERY
EXHAUST
FAN
"SS"
PA
NE
LB
OA
RD
FACP
38'-2"
4'-11"
3' 6'
3'- 6"
BATTERY
CHARGER
BATTERY
ENCLOSURE
4'
4' 4'
7'
REAR ACCESS PLATFORM
32'-7"
4'
SCALE:1 1/2" = 1'-0"
ELECTRICAL HOUSE PLAN
F1
F2 F1 F1 F2
X
W
3 3
WP
SS-14
SS-14
W
SS-14
SS-14
X
SS-14
OS OS
SS-14
SS-14 SS-14
SS-14SS-14
SS-14
WP
SS-18
WP
WP
SS-20
SS-20
SS-18
SS-18
SS-18
SS-20
"DC"
PANELBOARD
125VDC
8Y
/12 0V
AC
SS-2
SS-16
SS-7
SS-1
SS-20
HV
AC
#2
SS-10
F1
SS-14
W
SS-14
W
SS-14
WP
SS-18
HYDROGEN
SS-22
MONITOR
EYE WASH
OVERHEAD
H2O TANK
GB
PLATFORM
STAIRSSTAIRS
STAIRS
HEAT
EXHAUST
FAN
60 CFM
150 CFM
150 CFM
EF-2
T
T
40 CFM
PLATFORM
4'
8 8
SE
L-
S
GB
THERMOSTAT
RE
LA
Y
SW
IT
CH
SS-8
EF
-1
"SDNS3"
S O
L I C
I T
A T
I O
N
N
O
F I L E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F I
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
I S
S U
E
D
A T
E
D A
T E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
C T
O
SHEET
IDENTIFICATION
D A
T E
A P
P R
D A
V I S
M
O N
T H
F B
A
R I Z
O N
A
C I V
I
G
I N
E E
R
O F
F I C
E
O
F
T
H
B
S
E
R E
P A
R
N
S T
R U
T
P
I M
A R
Y
E
L E
C T
R I C
A L
D I S
T R
I B
U T
I O
N
F
A
F
D A
V I S
M
O N
T H
B
T U
C S
O N
P
I M
A
C
O U
N T
Y
A
Z
C O
N S
T R
U C
T I O
N
D
R A
W I N
G S
U.S. AIR FORCE
S
K Y
P
R
K
C
T
S A
N
D
I E
G O
C
A L
I F
O R
N
G
E
O
R G
I
A
R
E
G
I
ST
E
R
E
D
E
N
G
I N E
E
R
No. PE035113
PROFESSIONAL
S
T
E
P
H
. S
A
N
T
I
L
I
A
N
OF
E-
1 E -H
OU
SE
P
LA
N.
dw g
E-
HO
US
E
PL
AN
E-101
SE
S
JV
M
MA
G
PW
M
AS
S
HO
W
N
AR
CH
D
/23
/20
S
EP
T
FA
F0
#KEYED NOTES
1. CONNECT EXTERIOR LIGHT FIXTURE WITH INTEGRAL PHOTOCELL
TYPE TO UNSWITCHED HOT CIRCUIT.
2. PROVIDE BATTERY HANDLING SAFETY SUPPLIES AND EMERGENCY
SPILL KIT.
3. ALL 2 AND 3-PHASE LOW VOLTAGE EQUIPMENT SHALL BE LISTED
FOR 208V OPERATION. CONTRACTOR SHALL NOT SUPPLY OR
INSTALL ANY EQUIPMENT LISTED FOR 240V OPERATION.
4. PROVIDE AND INSTALL EYE WASH STATION WITH 6 GALLON
OVERHEAD H2O TANK. STATION SHALL PROVIDE MINIMUM 0.4
GALLONS OF WATER TO BOTH EYES FOR 15 MINUTES.
5. BATTERY EXHAUST SHALL BE DUCTED TO EXHAUST ALUMINUM
WALL CAP, BASIS OF DESIGN: DAYTON 45PE74. PROVIDE BATTERY
ENCLOSURE WITH BATTERY RACKS FOR 60 CELLS, COMPLETE
WITH DRIP CONTAINMENT, VENTED CABINET WITH 120 VOLT
EXHAUST FAN EF-1 EXHAUSTING 40 CFM.
6. E-HOUSE SHALL BE PROVIDED WITH HANDRAILS AND GUARDRAILS
FOR ELEVATED PLATFORMS AND STAIRS. REFERENCE
STRUCTURAL DRAWING SS301 FOR DETAILS.
7. PROVIIDE AND INSTALL A VISIBLE ALARM INSIDE AND OUTSIDE
THE PERSONNEL DOOR. ALARM SHALL BE TRIGGERED BY THE
HYDROGEN MONITOR
8. PROVIDE AND INSTALL A 4'-0" BOLLARD - SEE DETAIL 3/E502.
9. PROVIDE AND INSTALL SCHWEITZER ENGINEERING LABORATORIES
"SEL-2740S SOFTWARE DEFINED NETWORK SWITCH". CONNECT
ALL E-HOUSE SWITCHGEAR SEL-751 RELAYS INTO THIS NETWORK
SWITCH USING FIBER OPTIC CABLES. CONNECT THE SEL-2740S TO
THE EXISTING SEL PROTECTIVE RELAY SYSTEM IN THE CONTROL
HOUSE WITH A FIBER OPTIC CABLE OVER GOOSE PROTOCOL. THE
2 NEW (51-M2, 51,M3) AND 1 EXISTING (51M) SEL-751 RELAYS IN THE
EXISTING DMAFB SWITCHGEAR WILL SEND TRIP AND LOCKOUT
COMMANDS TO THE E-HOUSE FEEDER BREAKERS IN THE EVENT
OF A FAULT OR ARC FLASH. COORDINATE EXACT SYSTEM
REQUIREMENTS WITH SEL.
POWER CONDITIONS
NORMAL
EMERGENCY
AVG. LEVELS: (FOOT CANDLES) MAX LEVELS: (FOOT CANDLES) MIN LEVELS: (FOOT CANDLES)
52.4 73.9 20
15.8 25.2 7.7
DC SYSTEM NOTES:
1. DC SYSTEM SHALL COMPLY WITH OSHA 1926.441, UFC 3-520-01,
AND UFC 3-520-05.
2. PROVIDE AND INSTALL VALVE REGULATED LEAD ACID (VRLA)
BATTERIES FOR THE E-HOUSE DC SYSTEM. SEE AFPAM 32-1189
FOR VRLA MAINTENANCE AND HANDLING.
3. BATTERIES SHALL PROVIDE 100 AMPS AT 125VDC FOR A MINIMUM
OF 8 HOURS TO THE ENTIRE DC SYSTEM: 60 CELLS, 2V, 800AH.
4. BATTERIES SHALL BE NON-VENTED TYPE.
I S
S U
D
N
S T
R U
C T
I O
N
P W
M
MAG. VAR. 9° 32'E
15 SEP 2022
N
IES RECOMMENDED:
(AVG. FOOT CANDLES)
CONTRACTOR'S SCOPE OF WORK THIS SHEET:
1. CONTRACTOR TO PROVIDE AND INSTALL THE NEW ELEVATED
SUBSTATION E-HOUSE AS SHOWN WITH ELECTRICAL ARC CHUTES AND
COMPLETE WITH ALL FEATURES, EQUIPMENT, CABLES, AND
CONNECTIONS REQUIRED TO PROVIDE A WORKING SYSTEM AS
INTENDED AND DESCRIBED IN THE PROJECT DOCUMENTATION. REFER
TO THE PROJECT ELECTRICAL DRAWINGS, STRUCTURAL DRAWINGS,
COMMISSIONING PLAN, P&C REPORT, AND SPECIFICATIONS FOR A
COMPREHENSIVE LISTING OF LABOR AND MATERIALS TO BE PROVIDED
BY THE GENERAL CONTRACTOR.
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text 1/2"=1'-0"
AutoCAD SHX Text 0'
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 3'
AutoCAD SHX Text 4'
| Sheets and Views |
| E-101 |
File details come from the government source that posted it. Updated .