This document contains a schedule of material submittals for a federal construction project and the related solicitation.

The schedule of material submittals outlines over 180 line items of documents, plans, reports and other materials that the contractor must submit at various stages of the project to comply with the terms of the contract and technical specifications. Key required submittals include quality control plans, safety plans, environmental protection plans, construction schedules, waste management plans, as-built drawings and operation and maintenance manuals.

The related solicitation provides additional details on the project opportunity. It is a new construction requirement for the Department of the Air Force to build an outdoor addition to an event center at Schriever Air Force Base in Colorado. The estimated value of the contract is between $1,000,000 and $5,000,000. The NAICS code is 238990 and it is set aside for a HUBZone small business. The performance period is 180 days from notice to proceed.

View the file

Other files for this federal contract opportunity

Other files attached to Solicitation Amendment 0002 GLEN 20-2005 B20 Event Center Addition, newest first.
File Type Posted
20-2005 RFI 001.docx DOCX document
Amendment 0002 - FA255020R00160002 SF 30.pdf PDF
Amendment 0001 - FA255020R00160001 SF 30.pdf PDF
06C - Spec 01 55 04 Security_.pdf PDF
01 - SOW GLEN 20-2005.pdf PDF
02 - DWGs GLEN 20-2005.pdf PDF
05 - Geotechnical Report GLEN 20-2005.pdf PDF
03 - Specs GLEN 20-2005.pdf PDF
06B - Spec 01 35 29 Safety.pdf PDF
00 - Solicitation - FA255020R0016.pdf PDF
07 DBA Wage Determination.pdf PDF
06A - Spec 01 00 04 SAFB.pdf PDF
06D - Section 01 57 20.00 10 Environmental Protection.pdf PDF
08 SOW SAFB Environmental Supplement.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal 1

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERPROJECT NAMESOLICITATION /CONTRACT NUMBER
GLEN 20-2005Construct Addition to B20
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERCERTIFICATE OF COMPLIANCEMATERIAL CERTIFICATIONSMANUFACTURERS CERTIFICATESWELDING/WELDER CERTIFICATESSHOP DRAWINGSCOLOR SELECTIONSAMPLESMIX DESIGNMANUFATURUR'S RECOMMENDATIONCATALOG DATAPRODUCT DATAPRODUCT TEST REPORTSPRODUCT CERTIFICATESO&M DATA/MANUALSCALCULATIONSWARRANTYDRAWINGSREPORTTEST RESULTSREQUIRED SUBMISSION DATEDATE TO CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSAPPROVEDDISAPPROVEDCONTRACTOR SUBMITTALFINAL APPROVALREMARKS
GENERAL
1APPLICATIONS FOR PAYMENTxIAW Division 1 and Section 01 2900Section 01 2900 para 1.04
2TransmittalxIAW Division 1 and Section 01 2900Section 01 2900 para 1.04
3Waivers of Mechanic's LienxIAW Division 1 and Section 01 2900Section 01 2900 para 1.04
4INITIAL APPLICATION FOR PAYMENTxIAW Division 1 and Section 01 2900Section 01 2900 para 1.04
5SCHEDULE OF VALUESxNLT (10) days before date scheduled for Initial Application for PaymentSection 01 2900 para 1.03 and 1.04
6APPLICATION FOR PAYMENT AT SUBSTANTIAL COMPLETIONxIAW Division 1 and Section 01 2900Section 01 2900 para 1.04
7FINAL PAYMENT APPLICATIONxIAW Division 1 and Section 01 2900Section 01 2900 para 1.04
8PROJECT MANAGEMENT AND COORDINATIONxIAW Division 1 and Section 01 3100Section 01 3100
9Key Personnel NamesxContract Award + 10 daysSection 01 3100 para 1.03
10Administrative and Supervisory Personnelx10 days prior to need dateSection 01 3100 para 1.04
11PROJECT MEETINGSxIAW Division 1Section 01 3120
12Agenda of Pre-Construction Meetingsx2 days prior to meetingSection 01 3120 para 1.01 and SOW Section 5.5
13Minutes of Pre-Construction Meetingsxwithin 5 days of conclusion of meetingSection 01 3120 para 1.01 and SOW Section 5.5
14Agenda of Progress Meetingsx2 days prior to meetingSection 01 3120 para 1.02 and SOW Section 5.5
15Minutes of Progress Meetingsxwithin 2 days of conclusion of meetingSection 01 3120 para 1.02 and SOW Section 5.5
16SUBMITTALS SCHEDULExIAW Division 1 and Section 01 3200Section 01 3200 para 1.03
17PRELIMINARY CONSTRUCTION SCHEDULExIAW Division 1 and Section 01 3200Section 01 3200 para 1.03
18Bar-Chart Schedulex7 days prior to ASSection 01 3200 para 1.03
19PreparationxFirst workday of each weekSection 01 3200 para 1.03
20CONTRACTOR'S CONSTRUCTION SCHEDULExIAW Division 1 and Section 01 3200Section 01 3200 para 1.03
21ProceduresxIAW Division 1 and Section 01 3200Section 01 3200 para 1.03
22Time FramexIAW Division 1 and Section 01 3200Section 01 3200 para 1.03
23ActivitiesxIAW Division 1 and Section 01 3200Section 01 3200 para 1.03
24ConstraintsxIAW Division 1 and Section 01 3200Section 01 3200 para 1.03
25MilestonesxIAW Division 1 and Section 01 3200Section 01 3200 para 1.03
26Cost CorrelationxIAW Division 1 and Section 01 3200Section 01 3200 para 1.03
27Contract ModificationsxIAW Division 1 and Section 01 3200Section 01 3200 para 1.03
28CPM SchedulexContract Award + 20 daysSection 01 3200 para 1.03
29REPORTSxIAW Division 1Section 01 3200 para 2.05
30Daily Construction ReportsxDailySection 01 3200 para 2.05
31Material Location ReportsxWeeklySection 01 3200 para 2.05
32Field Conditions ReportsxImmediately if occurrenceSection 01 3200 para 2.05
33SPECIAL REPORTSxIAW Division 1Section 01 3200 para 2.06
34Reporting Unusual EventsxWithin 1 day of occurrenceSection 01 3200 para 2.06
35SUBMITTAL PROCEDURESxIAW Division 1Section 01 3300
36Subcontract ListxIAW Division 1Section 01 3300 para 2.01
37Installer CertificatesxIAW Division 1Section 01 3300 para 2.02
38Schedule of Tests and InspectionsxIAW Division 1Section 01 3300 para 2.02
39Insurance Certificates and BondsxIAW Division 1Section 01 3300 para 2.02
40QUALITY CONTROLxIAW Division 1Section 01 4500
41Quality Control PlanxContract Award + 15 daysSection 01 4500
42Quality Control Test ReportsxDaily, after NTPSection 01 4500 para 1.05
43PRODUCT REQUIREMENTS ANDxIAW Division 1Section 01 6000
44Proposed Products ListxContract Award + 15 daysSection 01 6000 para 1.03 (A)
45Substitution RequestsxNLT 8 days before Bid DateSection 01 6000 para 1.03 (B)
46Basis-of-Design Product Specification SubmittalxSee Section 01 3300Section 01 6000 para 1.03 (C)
47WORK CLEARANCE REQUESTxContract Award + 15 daysSOW Section 5.1
48EXECUTION AND FIELD ENGINEERINGxIAW Division 1Section 01 7123
49Survey Workx5 days prior to survey workSection 01 7123 para 1.02 (A)
50Project Record Documentsx2 days after survey work completeSection 01 7123 para 1.02 (B)
51Pest and Rodent Control PlanxContract Award + 15 daysSection 01 7123 para 1.04 (B)
52Rodent Control PlanxContract Award + 15 daysSection 01 7123 para 1.04 (C)
53Pollution Control PlanxContract Award + 15 daysSection 01 7123 para 1.04 (D)
54Agenda of Preinstallation Meetingsx4 days prior date of meetingSection 01 7123 para 2.02 (E)
55Minutes of Preinstallation Meetingsx2 days after meetingSection 01 7123 para 2.02 (E)
56CONSTRUCTION WASTE MANAGEMENTxIAW Division 1Section 01 7419
57Waste Management PlanxContract Award + 15 daysSection 01 7419 para 1.04 and 1.05
58CLOSEOUT PROCEDURESxIAW Division 1Section 01 7700
59Substantial Completion Inspection Requestx5 days prior to need dateSection 01 7700 para 1.02
60Final Completion Inspection Requestxx5 days prior to need dateSection 01 7700 para 1.03
61Pest Control Final Inspection Reportx5 days prior to need dateSection 01 7700 para 1.03
62List of Incomplete Items (Punch List)xSee Section 01 7700Section 01 7700 para 1.04
63WarrantiesxSee Section 01 7700Section 01 7700 para 1.05
64Draft DD Form 1354x5 days prior to pre-finalSOW Section 5.6
65Final DD Form 1354xAt final inspectionSOW Section 5.7
66As-Built DrawingsxAt pre-final inspectionSOW Sections 5.8, 7,2 and 8
67OPERATION AND MAINTENANCE DATAx15 days prior to pre-finalSection 01 7823
68PROJECT RECORD DOCUMENTSxIAW Division 1Section 01 7839
69Project Record Drawingsxx15 days prior to pre-finalSection 01 7839 para 1.02 (A) and 2.01
70Project Record Specificationsx15 days prior to pre-finalSection 01 7839 para 1.02 (B) and 2.02
71Project Record Product Dataxx15 days prior to pre-finalSection 01 7839 para 1.02 (C) and 2.03
72Miscellaneous Project Record Submittalsx15 days prior to pre-finalSection 01 7839 2.04
73DEMONSTRATION AND TRAINING VIDEOSx5 days prior to pre-finalSection 01 7900
74Instruction Programx5 days prior to pre-finalSection 01 7900 para 1.02 (A) and 2.01
75Attendance RecordxAt each training moduleSection 01 7900 para 1.02 (B)
76Demonstration and Training Videosx5 days prior to pre-finalSection 01 7900 para 1.02 (C)
77Name of Security RepresentativexContract Award + 15 daysSOW Section 9.2
SAFETY
78Contractor Safety Self-Evaluation ChecklistxAs RequiredSection 01 35 29 para 1.4.1
79Name and Qualifications of Site Safety and Health OfficersxContract Award + 15 daysSection 01 35 29 para 1.6.1.1
80Minutes of Safety Meetingsx3 calendar days after meetingSection 01 35 29 para 1.6.3.2
81Accident Prevention PlanxContract Award + 15 daysSection 01 35 29 para 1.7
82Activity Hazard AnalysisxContract Award + 15 daysSection 01 35 29 para 1.8
83Pre-Outage Coordinationx15 days prior to need of outageSection 01 35 29 para 3.2
ENVIRONMENTAL
84Environmental Protection PlanxContract Award + 15 daysSection 01 57 20.00 10 para 1.7
85Ozone Depleting SubstancesxContract Award + 15 daysSection 01 57 20.00 10 para 2.2.4
86Permits and Licenses for working on HVAC/Refrigerants containing an ODSxContract Award + 15 daysSection 01 57 20.00 10 para 2.2.4.2
87Storm Water Pollution Prevention PlanxContract Award + 15 daysSection 01 57 20.00 10 para 2.3
88Wastewater ManagementxContract Award + 15 daysSection 01 57 20.00 10 para 2.4
89Hazardous Materials/Waste Discharges (if required)xwithin 24 hours of accidentSection 01 57 20.00 10 para 2.4.1
90Septic System (if required)xContract Award + 15 daysSection 01 57 20.00 10 para 2.4.3
91Hazardous Materials Management PlanxContract Award + 15 daysSection 01 57 20.00 10 para 2.7
92AF 3952 & Manufacturer's SDS for Hazardous Materials (if required)xContract Award + 15 daysSection 01 57 20.00 10 para 2.7
93Hazardous Material Usage Report (if required)xwithin 10 working days after end of each calendar quarterSection 01 57 20.00 10 para 2.7
94Hazardous Waste Identification (if required)xContract Award + 15 daysSection 01 57 20.00 10 para 2.8
95AsbestosxContract Award + 15 daysSection 01 57 20.00 10 para 2.11
96Lead Based Paint (if required)xContract Award + 15 daysSection 01 57 20.00 10 para 2.12
97Pesticide Application Report (if required)xContract Award + 15 daysSection 01 57 20.00 10 para 2.13
98Reportingxwithin 5 days of need dateSection 01 57 20.00 10 para 2.13.7
99Green Product Determination FormxContract Award + 15 daysSection 01 57 20.00 10 para 2.17.2
100ExemptionsxContract Award + 15 daysSection 01 57 20.00 10 para 2.17.3
101Nuclear Soil (if required)xat least 72 hours prior to testingSection 01 57 20.00 10 para 2.22.1
110SELECTIVE DEMOLITION ACTIVITIESxIAW Division 1 and Division 2Section 02 4119
111Schedule of Selective Demolition ActivitiesxContract Award + 15 daysSection 02 4119 para 1.04
112CAST-IN-PLACE CONCRETExIAW Division 1 and Division 3Section 03 3000 para 1.02
113ACI 301 Submittal Requirements/ChecklistxIAW Division 1 and Division 3Section 03 3000 para 1.02
114Steel Reinforcement Shop DrawingsxIAW Division 1 and Division 3Section 03 3000 para 1.02
115UNIT MASONRYxxxxxIAW Division 1 and Division 4Section 04 2000 para 1.04
116Cold-Weather ProceduresxIAW Division 1 and Division 4Section 04 2000 para 1.04 (F)
117MANUFACTURED STONE VENEER MASONRYxxxxxIAW Division 1 and Division 4Section 04 7210 para 1.02 & 1.03
118Installer QualificationsxIAW Division 1 and Division 4Section 04 7210 para 1.03 (A)
119Pre-Construction Test ReportsxxIAW Division 1 and Division 4Section 04 7210 para 1.03 (B)
120Hot and Cold Weather Work PlanIAW Division 1 and Division 4Section 04 7210 para 1.03 €
121STRUCTURAL STEEL FRAMINGxxxIAW Division 1 and Division 5Section 05 1200 para 1.03
122Mill Test ReportsxIAW Division 1 and Division 5Section 05 1200 para 1.03
123Source Quality-Control Test ReportsxxIAW Division 1 and Division 5Section 05 1200 para 1.03
124STEEL JOIST FRAMINGxxxxxIAW Division 1 and Division 5Section 05 2100 para 1.02
125STEEL DECKxxxxIAW Division 1 and Division 5Section 05 3100 para 1.02
126COLD-FORMED METAL FRAMINGxxIAW Division 1 and Division 5Section 05 4100 para 1.04
127METAL FABRICATIONSxxIAW Division 1 and Division 5Section 05 5000 para 1.04
128ROUGH CARPENTRYxxIAW Division 1 and Division 6Section 06 1000 para 1.04
129BITUMINOUS DAMPPROOFINGxxIAW Division 1 and Division 7Section 07 1113 para 1.02
130THERMAL INSULATIONxxIAW Division 1 and Division 7Section 07 2100 para 1.03
131Research/Evaluation ReportsxIAW Division 1 and Division 7Section 07 2100 para 1.03 (C)
132SHEET AIR/WATER BARRIERSxxIAW Division 1 and Division 7Section 07 2500 para 1.02
133CONCRETE SLAB APPLIED VAPOR RETARDERxxxxIAW Division 1 and Division 7Section 07 2613 para 1.04 & 1.05
134Sustainable SubmittalsxIAW Division 1 and Division 7Section 07 2613 para 1.04 (B)
135Qualification dataxIAW Division 1 and Division 7Section 07 2613 para 1.05 (A)
136Flooring Manufacturer Acceptance of Vapor Retarder ApplicationxIAW Division 1 and Division 7Section 07 2613 para 1.05 (D)
137Sample WarrantyxIAW Division 1 and Division 7Section 07 2613 para 1.05 (E)
138BELOW SLAB-ON-GRADE VAPOR RETARDERxxIAW Division 1 and Division 7Section 07 2616 para 1.03
139Samples for Verification PurposesxIAW Division 1 and Division 7Section 07 2616 para 1.03
140METAL WALL AND SOFFIT PANELSxxxxIAW Division 1 and Division 7Section 07 4213 para 1.04
141THERMOPLASTIC MEMBRANE ROOFINGxxxxxIAW Division 1 and Division 7Section 07 5400 para 1.06 and 1.09
142Manufacturer's Installation InstructionsxIAW Division 1 and Division 7Section 07 5400 para 1.06
143Manufacturer's Field ReportsxIAW Division 1 and Division 7Section 07 5400 para 1.06
144SHEET METAL FLASHING AND TRIMxxxIAW Division 1 and Division 7Section 07 6200 para 1.04
145FIRESTOPPINGxxIAW Division 1 and Division 7Section 07 8400 para 1.03
146Schedule of FirestoppingxIAW Division 1 and Division 7Section 07 8400 para 1.03 (A)
147Manufacturer's Installation InstructionsxIAW Division 1 and Division 7Section 07 8400 para 1.03 ©
148Certificate from AuthorityxIAW Division 1 and Division 7Section 07 8400 para 1.03 (E)
149Installer QualificationsxIAW Division 1 and Division 7Section 07 8400 para 1.03 (F)
150JOINT SEALERSxxxIAW Division 1 and Division 7Section 07 9005 para 1.04
151Manufacturer's Installation InstructionsIAW Division 1 and Division 7Section 07 9005 para 1.04 (C)
152EXPANSION JOINT ASSEMBLIESxxxIAW Division 1 and Division 7Section 07 9513 para 1.03
153Research/Evaluation ReportsxIAW Division 1 and Division 7Section 07 9513 para 1.03 (D)
154HOLLOW METAL DOORS AND FRAMESxxxxIAW Division 1 and Division 8Section 08 1113 para 1.02
155Door Hardware TemplatesxIAW Division 1 and Division 8Section 08 1113 para 1.02 (B)
156FLUSH WOOD DOORSxxxxIAW Division 1 and Division 8Section 08 1416 para 1.04
157Manufacturer's Installation InstructionsxIAW Division 1 and Division 8Section 08 1416 para 1.04 (E)
158ACCESS DOORS AND PANELSxxIAW Division 1 and Division 8Section 08 3100 para 1.03
159Manufacturer's Installation InstructionsIAW Division 1 and Division 8Section 08 3100 para 1.03 (C)
160Project Record DocumentsIAW Division 1 and Division 8Section 08 3100 para 1.03 (D)
161SECTIONAL OVERHEAD DOORSxxxxxIAW Division 1 and Division 8Section 08 3613 para 1.04
162ALUMINUM ENTRANCES & STOREFRONTSxxxxIAW Division 1 and Division 8Section 08 4313 para 1.03
163Quality ControlxxIAW Division 1 and Division 8Section 08 4313 para 1.03 (D)
164TemplatesxIAW Division 1 and Division 8Section 08 4313 para 1.03 (E)
165DOOR HARDWARExxxIAW Division 1 and Division 8Section 08 7100
166Door Hardware SchedulexxIAW Division 1 and Division 8Section 08 7100 para 1.4 (B)
167Keying SchedulexIAW Division 1 and Division 8Section 08 7100 para 1.4 (C)
168Key Registration (Bitting) ListxIAW Division 1 and Division 8Section 08 7100 para 2.4 (I)
169GLAZINGxxxIAW Division 1 and Division 8Section 08 8000 para 1.03
170Contract Closeout SubmittalsxIAW Division 1 and Division 8Section 08 8000 para 1.03 (C)
171GYPSUM BOARD ASSEMBLIESxIAW Division 1 and Division 9Section 09 2116 para 1.04
172TILExxxIAW Division 1 and Division 9Section 09 3000 para 1.03 & 1.06
173RESILIENT FLOORING BASExIAW Division 1 and Division 9Section 09 6500 para 1.02
174TILE CARPETINGxxxxIAW Division 1 and Division 9Section 09 6813 para 1.03
175Manufacturer's Installation InstructionsxIAW Division 1 and Division 9Section 09 6813 para 1.03 (D)
176PAINTINGxxIAW Division 1 and Division 9Section 09 9100 para 1.03
177Detailed Painting SchedulexIAW Division 1 and Division 9Section 09 9100 para 1.03 (B)
178WALL AND CORNER GUARDSxxxxIAW Division 1 and Division 10Section 10 2601 para 1.02
179MANUFACTURED FIREPLACESxxxIAW Division 1 and Division 10Section 10 3100 para 1.04
180FIRE-PROTECTION SPECIALITIESxIAW Division 1 and Division 10Section 10 4400 para 1.02
181DRY-PIPE SPRINKLER SYSTEMSxxxxxxIAW Division 1 and Division 22Section 21-1316 para 1.4-1.6 & 3.12
182Delegated-Design SubmittalxIAW Division 1 and Division 22Section 21-1316 para 1.4
183Qualification DataxIAW Division 1 and Division 22Section 21-1316 para 1.5
184Approved Sprinkler Piping DrawingsxIAW Division 1 and Division 22Section 21-1316 para 1.5
185Field Test Reports and CertificatesxIAW Division 1 and Division 22Section 21-1316 para 1.5
186Field Quality Control ReportsxIAW Division 1 and Division 22Section 21-1316 para 1.5
187Sprinkler SchedulexIAW Division 1 and Division 22Section 21-1316 para 3.12
188MECHANICAL GENERAL PROVISIONSxIAW Division 1 and Division 23Section 23 0000
189ELECTRICAL PROVISIONS OF MECHANICAL WORK AND MECHANICAL PROVISIONS OF ELECTRICAL WORKIAW Division 1 and Division 23Section 23 0300
190Listing, Motors of Mechanical WorkIAW Division 1 and Division 23Section 23 0300 para 1.3 (A)
191BASIC MECHANICAL MATERIALS AND METHODSxxxxxIAW Division 1 and Division 23Section 23 0500 para 1.3
192Coordination DrawingsxIAW Division 1 and Division 23Section 23 0500 para 1.3 (D)
193Schedules of WorkxIAW Division 1 and Division 23Section 23 0500 para 1.3 (G)
194Pre-Outage CoordinationxIAW Division 1 and Division 23Section 23 0500 para 1.7 (A)
195HANGERS AND SUPPORTSxxxIAW Division 1 and Division 23Section 23 0529 para 1.3
196FUEL GAS PIPINGxxxxxxIAW Division 1 and Division 23Section 23 1123 para 1.3 & 1.6
197Coordination DrawingsxIAW Division 1 and Division 23Section 23 1123 para 1.3 (C)
198Pre-Outage CoordinationIAW Division 1 and Division 23Section 23 1123 para 1.6 (A)
199CEILING FANSxxxIAW Division 1 and Division 23Section 23 3475 para 1.3
200Coordination DrawingsxIAW Division 1 and Division 23Section 23 3475 para 1.3 (C)
201GAS-FIRED RADIANT HEATING SYSTEMxxxIAW Division 1 and Division 23Section 23 5523 para 1.3
202Wiring DiagramsxIAW Division 1 and Division 23Section 23 5523 para 1.3 (C)
203NameplatesxIAW Division 1 and Division 23Section 23 5523 para 1.3 (E )
204GENERAL ELECTRIC - ELECTRIC SUBMITTAL REQUIREMENTSIAW Division 1 and Division 26Section 26 0010 - 9
205Lighting FixturesxxxxIAW Division 1 and Division 26Section 26 00 10
206Contactors and Time ClocksxIAW Division 1 and Division 26Section 26 00 10
207Low Voltage Switching SystemxIAW Division 1 and Division 26Section 26 00 10
208Panelboards, Switchboards, MCC, DisconnectxIAW Division 1 and Division 26Section 26 00 10
209Emergency Engine Generator, Transfer Switch, Auxiliary EquipmentxIAW Division 1 and Division 26Section 26 00 10
210Fire Alarm System ComponentsxxIAW Division 1 and Division 26Section 26 00 10
211Security System ComponentsxIAW Division 1 and Division 26Section 26 00 10
212Public Address System ComponentsxIAW Division 1 and Division 26Section 26 00 10
213Audio System ComponentsxxIAW Division 1 and Division 26Section 26 00 10
214Disconnect DevicesxxIAW Division 1 and Division 26Section 26 00 11
215Boxes and DevicesxxIAW Division 1 and Division 26Section 26 00 10
216FusesxxxxIAW Division 1 and Division 26Section 26 00 10
217Wireway, Cable Tray, Surface Mounted RacewayxIAW Division 1 and Division 26Section 26 00 10
218Lighting System Components (relays, sensors, etc.)xxIAW Division 1 and Division 26Section 26 00 10
219Light Dimming EquipmentxIAW Division 1 and Division 26Section 26 00 10
220LampsxIAW Division 1 and Division 26Section 26 00 10
221Wiring Devices - Switches, Receptacles, etc.xxxxIAW Division 1 and Division 26Section 26 00 10
222Device Wall PlatesxxIAW Division 1 and Division 26Section 26 00 10
223Lightning Protection ComponentsxxxIAW Division 1 and Division 26Section 26 00 10
224Product SubstitutionsxxRequired Prior to Bid OpeningSection 26 00 10
225Schedule of ValuesxIAW Division 1 and Division 26Section 26 00 10
226Record DrawingsxIAW Division 1 and Division 26Section 26 00 10
227Operations and Maintenance ManualsxIAW Division 1 and Division 26Section 26 00 10
228Test ReportsxxIAW Division 1 and Division 26Section 26 08 05
229Inspection WellsxIAW Division 1 and Division 26Section 26 05 26
230Emergency Generator SetxxxIAW Division 1 and Division 26Section 26 32 13
231Automatic Transfer SwitchxxxIAW Division 1 and Division 26Section 26 32 23
232SPD for MDPxxxIAW Division 1 and Division 26Section 26 43 13
233SPD for PanelboardsxxxIAW Division 1 and Division 26Section 26 43 14
234LOW VOLTAGE POWER CONDUCTORS AND CABLESxxIAW Division 1 and Division 26Section 26 05 19
235HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMSxxIAW Division 1 and Division 26Section 26 0529
236ENCLOSED SWITCHESxxIAW Division 1 and Division 26Section 26 2816
237CATHODIC PROTECTION SYSTEMxIAW Division 1 and Division 26SOW Section 2.4
238STRUCTURED CABLE SYSTEMxxxxxxxxxIAW Division 1 and Division 27Section 27 1000 para 1.04
Contractors Experience and QualificationsxIAW Division 1 and Division 27Section 27 1000 para 1.04
DIGITAL FIRE ALARM MASS NOTIFICATIONxxxxxxxxxIAW Division 1 and Division 28Section 28 31 11 para 1.4, 1.5, 17, and 1.8
Delegated-Design SubmittalxxxxIAW Division 1 and Division 28Section 28 31 11 para 1.4
Qualification DataxIAW Division 1 and Division 28Section 28 31 11 para 1.5
Seismic Qualification CertificatesIAW Division 1 and Division 28Section 28 31 11 para 1.5
Field Quality Control ReportsxIAW Division 1 and Division 28Section 28 31 11 para 1.5
Software and Firmware Operational DocumentationxIAW Division 1 and Division 28Section 28 31 11 para 1.7
EARTH MOVINGIAW Division 1 and Division 31Section 31 2000
Aggregate Base Course & Engineered or Structural Fill Gradation & Material SamplesxxIAW Division 1 and Division 31Section 31 2000 para 1.5
Utility Pre-outage CoordinationxIAW Division 1 and Division 31Section 31 2000 para 1.6
CONCRETE PAVINGxxxxIAW Division 1 and Division 32Section 32 1313 para 1.2 and 1.3 (A)
SEEDINGxxxIAW Division 1 and Division 32Section 32 9200 1.4-1.6
Qualification DataxIAW Division 1 and Division 32Section 32 9200 1.4
Certification of Grass SeedxIAW Division 1 and Division 32Section 32 9200 1.4
Pesticides and HerbicidesxxIAW Division 1 and Division 32Section 32 9200 1.4
Installer QualificationsxxIAW Division 1 and Division 32Section 32 9200 1.6
Pesticide ApplicatorxxIAW Division 1 and Division 32Section 32 9200 1.6
WATER UTILITY DISTRIBUTOR PIPINGxxxxxIAW Division 1 and Division 33Section 33 1100 para 1.2

&9Project Submittal Form AF-66

File details come from the government source that posted it. Updated .