04 - AF Form 66 SubReg GLEN 20-2005.xlsx
XLSX spreadsheet 89 KB Posted
- Attached to
- Solicitation Amendment 0002 GLEN 20-2005 B20 Event Center Addition Federal contract opportunity
- Solicitation number
- FA2550
About this file
This document contains a schedule of material submittals for a federal construction project and the related solicitation.
The schedule of material submittals outlines over 180 line items of documents, plans, reports and other materials that the contractor must submit at various stages of the project to comply with the terms of the contract and technical specifications. Key required submittals include quality control plans, safety plans, environmental protection plans, construction schedules, waste management plans, as-built drawings and operation and maintenance manuals.
The related solicitation provides additional details on the project opportunity. It is a new construction requirement for the Department of the Air Force to build an outdoor addition to an event center at Schriever Air Force Base in Colorado. The estimated value of the contract is between $1,000,000 and $5,000,000. The NAICS code is 238990 and it is set aside for a HUBZone small business. The performance period is 180 days from notice to proceed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 20-2005 RFI 001.docx | DOCX document | |
| Amendment 0002 - FA255020R00160002 SF 30.pdf | ||
| Amendment 0001 - FA255020R00160001 SF 30.pdf | ||
| 06C - Spec 01 55 04 Security_.pdf | ||
| 01 - SOW GLEN 20-2005.pdf | ||
| 02 - DWGs GLEN 20-2005.pdf | ||
| 05 - Geotechnical Report GLEN 20-2005.pdf | ||
| 03 - Specs GLEN 20-2005.pdf | ||
| 06B - Spec 01 35 29 Safety.pdf | ||
| 00 - Solicitation - FA255020R0016.pdf | ||
| 07 DBA Wage Determination.pdf | ||
| 06A - Spec 01 00 04 SAFB.pdf | ||
| 06D - Section 01 57 20.00 10 Environmental Protection.pdf | ||
| 08 SOW SAFB Environmental Supplement.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal 1
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | PROJECT NAME | SOLICITATION /CONTRACT NUMBER | |||||||||||||||||||||||||||
| GLEN 20-2005 | Construct Addition to B20 | |||||||||||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||||||||||
| LINE NUMBER | CERTIFICATE OF COMPLIANCE | MATERIAL CERTIFICATIONS | MANUFACTURERS CERTIFICATES | WELDING/WELDER CERTIFICATES | SHOP DRAWINGS | COLOR SELECTION | SAMPLES | MIX DESIGN | MANUFATURUR'S RECOMMENDATION | CATALOG DATA | PRODUCT DATA | PRODUCT TEST REPORTS | PRODUCT CERTIFICATES | O&M DATA/MANUALS | CALCULATIONS | WARRANTY | DRAWINGS | REPORT | TEST RESULTS | REQUIRED SUBMISSION DATE | DATE TO CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | APPROVED | DISAPPROVED | CONTRACTOR SUBMITTAL | FINAL APPROVAL | REMARKS | |
| GENERAL | ||||||||||||||||||||||||||||||
| 1 | APPLICATIONS FOR PAYMENT | x | IAW Division 1 and Section 01 2900 | Section 01 2900 para 1.04 | ||||||||||||||||||||||||||
| 2 | Transmittal | x | IAW Division 1 and Section 01 2900 | Section 01 2900 para 1.04 | ||||||||||||||||||||||||||
| 3 | Waivers of Mechanic's Lien | x | IAW Division 1 and Section 01 2900 | Section 01 2900 para 1.04 | ||||||||||||||||||||||||||
| 4 | INITIAL APPLICATION FOR PAYMENT | x | IAW Division 1 and Section 01 2900 | Section 01 2900 para 1.04 | ||||||||||||||||||||||||||
| 5 | SCHEDULE OF VALUES | x | NLT (10) days before date scheduled for Initial Application for Payment | Section 01 2900 para 1.03 and 1.04 | ||||||||||||||||||||||||||
| 6 | APPLICATION FOR PAYMENT AT SUBSTANTIAL COMPLETION | x | IAW Division 1 and Section 01 2900 | Section 01 2900 para 1.04 | ||||||||||||||||||||||||||
| 7 | FINAL PAYMENT APPLICATION | x | IAW Division 1 and Section 01 2900 | Section 01 2900 para 1.04 | ||||||||||||||||||||||||||
| 8 | PROJECT MANAGEMENT AND COORDINATION | x | IAW Division 1 and Section 01 3100 | Section 01 3100 | ||||||||||||||||||||||||||
| 9 | Key Personnel Names | x | Contract Award + 10 days | Section 01 3100 para 1.03 | ||||||||||||||||||||||||||
| 10 | Administrative and Supervisory Personnel | x | 10 days prior to need date | Section 01 3100 para 1.04 | ||||||||||||||||||||||||||
| 11 | PROJECT MEETINGS | x | IAW Division 1 | Section 01 3120 | ||||||||||||||||||||||||||
| 12 | Agenda of Pre-Construction Meetings | x | 2 days prior to meeting | Section 01 3120 para 1.01 and SOW Section 5.5 | ||||||||||||||||||||||||||
| 13 | Minutes of Pre-Construction Meetings | x | within 5 days of conclusion of meeting | Section 01 3120 para 1.01 and SOW Section 5.5 | ||||||||||||||||||||||||||
| 14 | Agenda of Progress Meetings | x | 2 days prior to meeting | Section 01 3120 para 1.02 and SOW Section 5.5 | ||||||||||||||||||||||||||
| 15 | Minutes of Progress Meetings | x | within 2 days of conclusion of meeting | Section 01 3120 para 1.02 and SOW Section 5.5 | ||||||||||||||||||||||||||
| 16 | SUBMITTALS SCHEDULE | x | IAW Division 1 and Section 01 3200 | Section 01 3200 para 1.03 | ||||||||||||||||||||||||||
| 17 | PRELIMINARY CONSTRUCTION SCHEDULE | x | IAW Division 1 and Section 01 3200 | Section 01 3200 para 1.03 | ||||||||||||||||||||||||||
| 18 | Bar-Chart Schedule | x | 7 days prior to AS | Section 01 3200 para 1.03 | ||||||||||||||||||||||||||
| 19 | Preparation | x | First workday of each week | Section 01 3200 para 1.03 | ||||||||||||||||||||||||||
| 20 | CONTRACTOR'S CONSTRUCTION SCHEDULE | x | IAW Division 1 and Section 01 3200 | Section 01 3200 para 1.03 | ||||||||||||||||||||||||||
| 21 | Procedures | x | IAW Division 1 and Section 01 3200 | Section 01 3200 para 1.03 | ||||||||||||||||||||||||||
| 22 | Time Frame | x | IAW Division 1 and Section 01 3200 | Section 01 3200 para 1.03 | ||||||||||||||||||||||||||
| 23 | Activities | x | IAW Division 1 and Section 01 3200 | Section 01 3200 para 1.03 | ||||||||||||||||||||||||||
| 24 | Constraints | x | IAW Division 1 and Section 01 3200 | Section 01 3200 para 1.03 | ||||||||||||||||||||||||||
| 25 | Milestones | x | IAW Division 1 and Section 01 3200 | Section 01 3200 para 1.03 | ||||||||||||||||||||||||||
| 26 | Cost Correlation | x | IAW Division 1 and Section 01 3200 | Section 01 3200 para 1.03 | ||||||||||||||||||||||||||
| 27 | Contract Modifications | x | IAW Division 1 and Section 01 3200 | Section 01 3200 para 1.03 | ||||||||||||||||||||||||||
| 28 | CPM Schedule | x | Contract Award + 20 days | Section 01 3200 para 1.03 | ||||||||||||||||||||||||||
| 29 | REPORTS | x | IAW Division 1 | Section 01 3200 para 2.05 | ||||||||||||||||||||||||||
| 30 | Daily Construction Reports | x | Daily | Section 01 3200 para 2.05 | ||||||||||||||||||||||||||
| 31 | Material Location Reports | x | Weekly | Section 01 3200 para 2.05 | ||||||||||||||||||||||||||
| 32 | Field Conditions Reports | x | Immediately if occurrence | Section 01 3200 para 2.05 | ||||||||||||||||||||||||||
| 33 | SPECIAL REPORTS | x | IAW Division 1 | Section 01 3200 para 2.06 | ||||||||||||||||||||||||||
| 34 | Reporting Unusual Events | x | Within 1 day of occurrence | Section 01 3200 para 2.06 | ||||||||||||||||||||||||||
| 35 | SUBMITTAL PROCEDURES | x | IAW Division 1 | Section 01 3300 | ||||||||||||||||||||||||||
| 36 | Subcontract List | x | IAW Division 1 | Section 01 3300 para 2.01 | ||||||||||||||||||||||||||
| 37 | Installer Certificates | x | IAW Division 1 | Section 01 3300 para 2.02 | ||||||||||||||||||||||||||
| 38 | Schedule of Tests and Inspections | x | IAW Division 1 | Section 01 3300 para 2.02 | ||||||||||||||||||||||||||
| 39 | Insurance Certificates and Bonds | x | IAW Division 1 | Section 01 3300 para 2.02 | ||||||||||||||||||||||||||
| 40 | QUALITY CONTROL | x | IAW Division 1 | Section 01 4500 | ||||||||||||||||||||||||||
| 41 | Quality Control Plan | x | Contract Award + 15 days | Section 01 4500 | ||||||||||||||||||||||||||
| 42 | Quality Control Test Reports | x | Daily, after NTP | Section 01 4500 para 1.05 | ||||||||||||||||||||||||||
| 43 | PRODUCT REQUIREMENTS AND | x | IAW Division 1 | Section 01 6000 | ||||||||||||||||||||||||||
| 44 | Proposed Products List | x | Contract Award + 15 days | Section 01 6000 para 1.03 (A) | ||||||||||||||||||||||||||
| 45 | Substitution Requests | x | NLT 8 days before Bid Date | Section 01 6000 para 1.03 (B) | ||||||||||||||||||||||||||
| 46 | Basis-of-Design Product Specification Submittal | x | See Section 01 3300 | Section 01 6000 para 1.03 (C) | ||||||||||||||||||||||||||
| 47 | WORK CLEARANCE REQUEST | x | Contract Award + 15 days | SOW Section 5.1 | ||||||||||||||||||||||||||
| 48 | EXECUTION AND FIELD ENGINEERING | x | IAW Division 1 | Section 01 7123 | ||||||||||||||||||||||||||
| 49 | Survey Work | x | 5 days prior to survey work | Section 01 7123 para 1.02 (A) | ||||||||||||||||||||||||||
| 50 | Project Record Documents | x | 2 days after survey work complete | Section 01 7123 para 1.02 (B) | ||||||||||||||||||||||||||
| 51 | Pest and Rodent Control Plan | x | Contract Award + 15 days | Section 01 7123 para 1.04 (B) | ||||||||||||||||||||||||||
| 52 | Rodent Control Plan | x | Contract Award + 15 days | Section 01 7123 para 1.04 (C) | ||||||||||||||||||||||||||
| 53 | Pollution Control Plan | x | Contract Award + 15 days | Section 01 7123 para 1.04 (D) | ||||||||||||||||||||||||||
| 54 | Agenda of Preinstallation Meetings | x | 4 days prior date of meeting | Section 01 7123 para 2.02 (E) | ||||||||||||||||||||||||||
| 55 | Minutes of Preinstallation Meetings | x | 2 days after meeting | Section 01 7123 para 2.02 (E) | ||||||||||||||||||||||||||
| 56 | CONSTRUCTION WASTE MANAGEMENT | x | IAW Division 1 | Section 01 7419 | ||||||||||||||||||||||||||
| 57 | Waste Management Plan | x | Contract Award + 15 days | Section 01 7419 para 1.04 and 1.05 | ||||||||||||||||||||||||||
| 58 | CLOSEOUT PROCEDURES | x | IAW Division 1 | Section 01 7700 | ||||||||||||||||||||||||||
| 59 | Substantial Completion Inspection Request | x | 5 days prior to need date | Section 01 7700 para 1.02 | ||||||||||||||||||||||||||
| 60 | Final Completion Inspection Request | x | x | 5 days prior to need date | Section 01 7700 para 1.03 | |||||||||||||||||||||||||
| 61 | Pest Control Final Inspection Report | x | 5 days prior to need date | Section 01 7700 para 1.03 | ||||||||||||||||||||||||||
| 62 | List of Incomplete Items (Punch List) | x | See Section 01 7700 | Section 01 7700 para 1.04 | ||||||||||||||||||||||||||
| 63 | Warranties | x | See Section 01 7700 | Section 01 7700 para 1.05 | ||||||||||||||||||||||||||
| 64 | Draft DD Form 1354 | x | 5 days prior to pre-final | SOW Section 5.6 | ||||||||||||||||||||||||||
| 65 | Final DD Form 1354 | x | At final inspection | SOW Section 5.7 | ||||||||||||||||||||||||||
| 66 | As-Built Drawings | x | At pre-final inspection | SOW Sections 5.8, 7,2 and 8 | ||||||||||||||||||||||||||
| 67 | OPERATION AND MAINTENANCE DATA | x | 15 days prior to pre-final | Section 01 7823 | ||||||||||||||||||||||||||
| 68 | PROJECT RECORD DOCUMENTS | x | IAW Division 1 | Section 01 7839 | ||||||||||||||||||||||||||
| 69 | Project Record Drawings | x | x | 15 days prior to pre-final | Section 01 7839 para 1.02 (A) and 2.01 | |||||||||||||||||||||||||
| 70 | Project Record Specifications | x | 15 days prior to pre-final | Section 01 7839 para 1.02 (B) and 2.02 | ||||||||||||||||||||||||||
| 71 | Project Record Product Data | x | x | 15 days prior to pre-final | Section 01 7839 para 1.02 (C) and 2.03 | |||||||||||||||||||||||||
| 72 | Miscellaneous Project Record Submittals | x | 15 days prior to pre-final | Section 01 7839 2.04 | ||||||||||||||||||||||||||
| 73 | DEMONSTRATION AND TRAINING VIDEOS | x | 5 days prior to pre-final | Section 01 7900 | ||||||||||||||||||||||||||
| 74 | Instruction Program | x | 5 days prior to pre-final | Section 01 7900 para 1.02 (A) and 2.01 | ||||||||||||||||||||||||||
| 75 | Attendance Record | x | At each training module | Section 01 7900 para 1.02 (B) | ||||||||||||||||||||||||||
| 76 | Demonstration and Training Videos | x | 5 days prior to pre-final | Section 01 7900 para 1.02 (C) | ||||||||||||||||||||||||||
| 77 | Name of Security Representative | x | Contract Award + 15 days | SOW Section 9.2 | ||||||||||||||||||||||||||
| SAFETY | ||||||||||||||||||||||||||||||
| 78 | Contractor Safety Self-Evaluation Checklist | x | As Required | Section 01 35 29 para 1.4.1 | ||||||||||||||||||||||||||
| 79 | Name and Qualifications of Site Safety and Health Officers | x | Contract Award + 15 days | Section 01 35 29 para 1.6.1.1 | ||||||||||||||||||||||||||
| 80 | Minutes of Safety Meetings | x | 3 calendar days after meeting | Section 01 35 29 para 1.6.3.2 | ||||||||||||||||||||||||||
| 81 | Accident Prevention Plan | x | Contract Award + 15 days | Section 01 35 29 para 1.7 | ||||||||||||||||||||||||||
| 82 | Activity Hazard Analysis | x | Contract Award + 15 days | Section 01 35 29 para 1.8 | ||||||||||||||||||||||||||
| 83 | Pre-Outage Coordination | x | 15 days prior to need of outage | Section 01 35 29 para 3.2 | ||||||||||||||||||||||||||
| ENVIRONMENTAL | ||||||||||||||||||||||||||||||
| 84 | Environmental Protection Plan | x | Contract Award + 15 days | Section 01 57 20.00 10 para 1.7 | ||||||||||||||||||||||||||
| 85 | Ozone Depleting Substances | x | Contract Award + 15 days | Section 01 57 20.00 10 para 2.2.4 | ||||||||||||||||||||||||||
| 86 | Permits and Licenses for working on HVAC/Refrigerants containing an ODS | x | Contract Award + 15 days | Section 01 57 20.00 10 para 2.2.4.2 | ||||||||||||||||||||||||||
| 87 | Storm Water Pollution Prevention Plan | x | Contract Award + 15 days | Section 01 57 20.00 10 para 2.3 | ||||||||||||||||||||||||||
| 88 | Wastewater Management | x | Contract Award + 15 days | Section 01 57 20.00 10 para 2.4 | ||||||||||||||||||||||||||
| 89 | Hazardous Materials/Waste Discharges (if required) | x | within 24 hours of accident | Section 01 57 20.00 10 para 2.4.1 | ||||||||||||||||||||||||||
| 90 | Septic System (if required) | x | Contract Award + 15 days | Section 01 57 20.00 10 para 2.4.3 | ||||||||||||||||||||||||||
| 91 | Hazardous Materials Management Plan | x | Contract Award + 15 days | Section 01 57 20.00 10 para 2.7 | ||||||||||||||||||||||||||
| 92 | AF 3952 & Manufacturer's SDS for Hazardous Materials (if required) | x | Contract Award + 15 days | Section 01 57 20.00 10 para 2.7 | ||||||||||||||||||||||||||
| 93 | Hazardous Material Usage Report (if required) | x | within 10 working days after end of each calendar quarter | Section 01 57 20.00 10 para 2.7 | ||||||||||||||||||||||||||
| 94 | Hazardous Waste Identification (if required) | x | Contract Award + 15 days | Section 01 57 20.00 10 para 2.8 | ||||||||||||||||||||||||||
| 95 | Asbestos | x | Contract Award + 15 days | Section 01 57 20.00 10 para 2.11 | ||||||||||||||||||||||||||
| 96 | Lead Based Paint (if required) | x | Contract Award + 15 days | Section 01 57 20.00 10 para 2.12 | ||||||||||||||||||||||||||
| 97 | Pesticide Application Report (if required) | x | Contract Award + 15 days | Section 01 57 20.00 10 para 2.13 | ||||||||||||||||||||||||||
| 98 | Reporting | x | within 5 days of need date | Section 01 57 20.00 10 para 2.13.7 | ||||||||||||||||||||||||||
| 99 | Green Product Determination Form | x | Contract Award + 15 days | Section 01 57 20.00 10 para 2.17.2 | ||||||||||||||||||||||||||
| 100 | Exemptions | x | Contract Award + 15 days | Section 01 57 20.00 10 para 2.17.3 | ||||||||||||||||||||||||||
| 101 | Nuclear Soil (if required) | x | at least 72 hours prior to testing | Section 01 57 20.00 10 para 2.22.1 | ||||||||||||||||||||||||||
| 110 | SELECTIVE DEMOLITION ACTIVITIES | x | IAW Division 1 and Division 2 | Section 02 4119 | ||||||||||||||||||||||||||
| 111 | Schedule of Selective Demolition Activities | x | Contract Award + 15 days | Section 02 4119 para 1.04 | ||||||||||||||||||||||||||
| 112 | CAST-IN-PLACE CONCRETE | x | IAW Division 1 and Division 3 | Section 03 3000 para 1.02 | ||||||||||||||||||||||||||
| 113 | ACI 301 Submittal Requirements/Checklist | x | IAW Division 1 and Division 3 | Section 03 3000 para 1.02 | ||||||||||||||||||||||||||
| 114 | Steel Reinforcement Shop Drawings | x | IAW Division 1 and Division 3 | Section 03 3000 para 1.02 | ||||||||||||||||||||||||||
| 115 | UNIT MASONRY | x | x | x | x | x | IAW Division 1 and Division 4 | Section 04 2000 para 1.04 | ||||||||||||||||||||||
| 116 | Cold-Weather Procedures | x | IAW Division 1 and Division 4 | Section 04 2000 para 1.04 (F) | ||||||||||||||||||||||||||
| 117 | MANUFACTURED STONE VENEER MASONRY | x | x | x | x | x | IAW Division 1 and Division 4 | Section 04 7210 para 1.02 & 1.03 | ||||||||||||||||||||||
| 118 | Installer Qualifications | x | IAW Division 1 and Division 4 | Section 04 7210 para 1.03 (A) | ||||||||||||||||||||||||||
| 119 | Pre-Construction Test Reports | x | x | IAW Division 1 and Division 4 | Section 04 7210 para 1.03 (B) | |||||||||||||||||||||||||
| 120 | Hot and Cold Weather Work Plan | IAW Division 1 and Division 4 | Section 04 7210 para 1.03 € | |||||||||||||||||||||||||||
| 121 | STRUCTURAL STEEL FRAMING | x | x | x | IAW Division 1 and Division 5 | Section 05 1200 para 1.03 | ||||||||||||||||||||||||
| 122 | Mill Test Reports | x | IAW Division 1 and Division 5 | Section 05 1200 para 1.03 | ||||||||||||||||||||||||||
| 123 | Source Quality-Control Test Reports | x | x | IAW Division 1 and Division 5 | Section 05 1200 para 1.03 | |||||||||||||||||||||||||
| 124 | STEEL JOIST FRAMING | x | x | x | x | x | IAW Division 1 and Division 5 | Section 05 2100 para 1.02 | ||||||||||||||||||||||
| 125 | STEEL DECK | x | x | x | x | IAW Division 1 and Division 5 | Section 05 3100 para 1.02 | |||||||||||||||||||||||
| 126 | COLD-FORMED METAL FRAMING | x | x | IAW Division 1 and Division 5 | Section 05 4100 para 1.04 | |||||||||||||||||||||||||
| 127 | METAL FABRICATIONS | x | x | IAW Division 1 and Division 5 | Section 05 5000 para 1.04 | |||||||||||||||||||||||||
| 128 | ROUGH CARPENTRY | x | x | IAW Division 1 and Division 6 | Section 06 1000 para 1.04 | |||||||||||||||||||||||||
| 129 | BITUMINOUS DAMPPROOFING | x | x | IAW Division 1 and Division 7 | Section 07 1113 para 1.02 | |||||||||||||||||||||||||
| 130 | THERMAL INSULATION | x | x | IAW Division 1 and Division 7 | Section 07 2100 para 1.03 | |||||||||||||||||||||||||
| 131 | Research/Evaluation Reports | x | IAW Division 1 and Division 7 | Section 07 2100 para 1.03 (C) | ||||||||||||||||||||||||||
| 132 | SHEET AIR/WATER BARRIERS | x | x | IAW Division 1 and Division 7 | Section 07 2500 para 1.02 | |||||||||||||||||||||||||
| 133 | CONCRETE SLAB APPLIED VAPOR RETARDER | x | x | x | x | IAW Division 1 and Division 7 | Section 07 2613 para 1.04 & 1.05 | |||||||||||||||||||||||
| 134 | Sustainable Submittals | x | IAW Division 1 and Division 7 | Section 07 2613 para 1.04 (B) | ||||||||||||||||||||||||||
| 135 | Qualification data | x | IAW Division 1 and Division 7 | Section 07 2613 para 1.05 (A) | ||||||||||||||||||||||||||
| 136 | Flooring Manufacturer Acceptance of Vapor Retarder Application | x | IAW Division 1 and Division 7 | Section 07 2613 para 1.05 (D) | ||||||||||||||||||||||||||
| 137 | Sample Warranty | x | IAW Division 1 and Division 7 | Section 07 2613 para 1.05 (E) | ||||||||||||||||||||||||||
| 138 | BELOW SLAB-ON-GRADE VAPOR RETARDER | x | x | IAW Division 1 and Division 7 | Section 07 2616 para 1.03 | |||||||||||||||||||||||||
| 139 | Samples for Verification Purposes | x | IAW Division 1 and Division 7 | Section 07 2616 para 1.03 | ||||||||||||||||||||||||||
| 140 | METAL WALL AND SOFFIT PANELS | x | x | x | x | IAW Division 1 and Division 7 | Section 07 4213 para 1.04 | |||||||||||||||||||||||
| 141 | THERMOPLASTIC MEMBRANE ROOFING | x | x | x | x | x | IAW Division 1 and Division 7 | Section 07 5400 para 1.06 and 1.09 | ||||||||||||||||||||||
| 142 | Manufacturer's Installation Instructions | x | IAW Division 1 and Division 7 | Section 07 5400 para 1.06 | ||||||||||||||||||||||||||
| 143 | Manufacturer's Field Reports | x | IAW Division 1 and Division 7 | Section 07 5400 para 1.06 | ||||||||||||||||||||||||||
| 144 | SHEET METAL FLASHING AND TRIM | x | x | x | IAW Division 1 and Division 7 | Section 07 6200 para 1.04 | ||||||||||||||||||||||||
| 145 | FIRESTOPPING | x | x | IAW Division 1 and Division 7 | Section 07 8400 para 1.03 | |||||||||||||||||||||||||
| 146 | Schedule of Firestopping | x | IAW Division 1 and Division 7 | Section 07 8400 para 1.03 (A) | ||||||||||||||||||||||||||
| 147 | Manufacturer's Installation Instructions | x | IAW Division 1 and Division 7 | Section 07 8400 para 1.03 © | ||||||||||||||||||||||||||
| 148 | Certificate from Authority | x | IAW Division 1 and Division 7 | Section 07 8400 para 1.03 (E) | ||||||||||||||||||||||||||
| 149 | Installer Qualifications | x | IAW Division 1 and Division 7 | Section 07 8400 para 1.03 (F) | ||||||||||||||||||||||||||
| 150 | JOINT SEALERS | x | x | x | IAW Division 1 and Division 7 | Section 07 9005 para 1.04 | ||||||||||||||||||||||||
| 151 | Manufacturer's Installation Instructions | IAW Division 1 and Division 7 | Section 07 9005 para 1.04 (C) | |||||||||||||||||||||||||||
| 152 | EXPANSION JOINT ASSEMBLIES | x | x | x | IAW Division 1 and Division 7 | Section 07 9513 para 1.03 | ||||||||||||||||||||||||
| 153 | Research/Evaluation Reports | x | IAW Division 1 and Division 7 | Section 07 9513 para 1.03 (D) | ||||||||||||||||||||||||||
| 154 | HOLLOW METAL DOORS AND FRAMES | x | x | x | x | IAW Division 1 and Division 8 | Section 08 1113 para 1.02 | |||||||||||||||||||||||
| 155 | Door Hardware Templates | x | IAW Division 1 and Division 8 | Section 08 1113 para 1.02 (B) | ||||||||||||||||||||||||||
| 156 | FLUSH WOOD DOORS | x | x | x | x | IAW Division 1 and Division 8 | Section 08 1416 para 1.04 | |||||||||||||||||||||||
| 157 | Manufacturer's Installation Instructions | x | IAW Division 1 and Division 8 | Section 08 1416 para 1.04 (E) | ||||||||||||||||||||||||||
| 158 | ACCESS DOORS AND PANELS | x | x | IAW Division 1 and Division 8 | Section 08 3100 para 1.03 | |||||||||||||||||||||||||
| 159 | Manufacturer's Installation Instructions | IAW Division 1 and Division 8 | Section 08 3100 para 1.03 (C) | |||||||||||||||||||||||||||
| 160 | Project Record Documents | IAW Division 1 and Division 8 | Section 08 3100 para 1.03 (D) | |||||||||||||||||||||||||||
| 161 | SECTIONAL OVERHEAD DOORS | x | x | x | x | x | IAW Division 1 and Division 8 | Section 08 3613 para 1.04 | ||||||||||||||||||||||
| 162 | ALUMINUM ENTRANCES & STOREFRONTS | x | x | x | x | IAW Division 1 and Division 8 | Section 08 4313 para 1.03 | |||||||||||||||||||||||
| 163 | Quality Control | x | x | IAW Division 1 and Division 8 | Section 08 4313 para 1.03 (D) | |||||||||||||||||||||||||
| 164 | Templates | x | IAW Division 1 and Division 8 | Section 08 4313 para 1.03 (E) | ||||||||||||||||||||||||||
| 165 | DOOR HARDWARE | x | x | x | IAW Division 1 and Division 8 | Section 08 7100 | ||||||||||||||||||||||||
| 166 | Door Hardware Schedule | x | x | IAW Division 1 and Division 8 | Section 08 7100 para 1.4 (B) | |||||||||||||||||||||||||
| 167 | Keying Schedule | x | IAW Division 1 and Division 8 | Section 08 7100 para 1.4 (C) | ||||||||||||||||||||||||||
| 168 | Key Registration (Bitting) List | x | IAW Division 1 and Division 8 | Section 08 7100 para 2.4 (I) | ||||||||||||||||||||||||||
| 169 | GLAZING | x | x | x | IAW Division 1 and Division 8 | Section 08 8000 para 1.03 | ||||||||||||||||||||||||
| 170 | Contract Closeout Submittals | x | IAW Division 1 and Division 8 | Section 08 8000 para 1.03 (C) | ||||||||||||||||||||||||||
| 171 | GYPSUM BOARD ASSEMBLIES | x | IAW Division 1 and Division 9 | Section 09 2116 para 1.04 | ||||||||||||||||||||||||||
| 172 | TILE | x | x | x | IAW Division 1 and Division 9 | Section 09 3000 para 1.03 & 1.06 | ||||||||||||||||||||||||
| 173 | RESILIENT FLOORING BASE | x | IAW Division 1 and Division 9 | Section 09 6500 para 1.02 | ||||||||||||||||||||||||||
| 174 | TILE CARPETING | x | x | x | x | IAW Division 1 and Division 9 | Section 09 6813 para 1.03 | |||||||||||||||||||||||
| 175 | Manufacturer's Installation Instructions | x | IAW Division 1 and Division 9 | Section 09 6813 para 1.03 (D) | ||||||||||||||||||||||||||
| 176 | PAINTING | x | x | IAW Division 1 and Division 9 | Section 09 9100 para 1.03 | |||||||||||||||||||||||||
| 177 | Detailed Painting Schedule | x | IAW Division 1 and Division 9 | Section 09 9100 para 1.03 (B) | ||||||||||||||||||||||||||
| 178 | WALL AND CORNER GUARDS | x | x | x | x | IAW Division 1 and Division 10 | Section 10 2601 para 1.02 | |||||||||||||||||||||||
| 179 | MANUFACTURED FIREPLACES | x | x | x | IAW Division 1 and Division 10 | Section 10 3100 para 1.04 | ||||||||||||||||||||||||
| 180 | FIRE-PROTECTION SPECIALITIES | x | IAW Division 1 and Division 10 | Section 10 4400 para 1.02 | ||||||||||||||||||||||||||
| 181 | DRY-PIPE SPRINKLER SYSTEMS | x | x | x | x | x | x | IAW Division 1 and Division 22 | Section 21-1316 para 1.4-1.6 & 3.12 | |||||||||||||||||||||
| 182 | Delegated-Design Submittal | x | IAW Division 1 and Division 22 | Section 21-1316 para 1.4 | ||||||||||||||||||||||||||
| 183 | Qualification Data | x | IAW Division 1 and Division 22 | Section 21-1316 para 1.5 | ||||||||||||||||||||||||||
| 184 | Approved Sprinkler Piping Drawings | x | IAW Division 1 and Division 22 | Section 21-1316 para 1.5 | ||||||||||||||||||||||||||
| 185 | Field Test Reports and Certificates | x | IAW Division 1 and Division 22 | Section 21-1316 para 1.5 | ||||||||||||||||||||||||||
| 186 | Field Quality Control Reports | x | IAW Division 1 and Division 22 | Section 21-1316 para 1.5 | ||||||||||||||||||||||||||
| 187 | Sprinkler Schedule | x | IAW Division 1 and Division 22 | Section 21-1316 para 3.12 | ||||||||||||||||||||||||||
| 188 | MECHANICAL GENERAL PROVISIONS | x | IAW Division 1 and Division 23 | Section 23 0000 | ||||||||||||||||||||||||||
| 189 | ELECTRICAL PROVISIONS OF MECHANICAL WORK AND MECHANICAL PROVISIONS OF ELECTRICAL WORK | IAW Division 1 and Division 23 | Section 23 0300 | |||||||||||||||||||||||||||
| 190 | Listing, Motors of Mechanical Work | IAW Division 1 and Division 23 | Section 23 0300 para 1.3 (A) | |||||||||||||||||||||||||||
| 191 | BASIC MECHANICAL MATERIALS AND METHODS | x | x | x | x | x | IAW Division 1 and Division 23 | Section 23 0500 para 1.3 | ||||||||||||||||||||||
| 192 | Coordination Drawings | x | IAW Division 1 and Division 23 | Section 23 0500 para 1.3 (D) | ||||||||||||||||||||||||||
| 193 | Schedules of Work | x | IAW Division 1 and Division 23 | Section 23 0500 para 1.3 (G) | ||||||||||||||||||||||||||
| 194 | Pre-Outage Coordination | x | IAW Division 1 and Division 23 | Section 23 0500 para 1.7 (A) | ||||||||||||||||||||||||||
| 195 | HANGERS AND SUPPORTS | x | x | x | IAW Division 1 and Division 23 | Section 23 0529 para 1.3 | ||||||||||||||||||||||||
| 196 | FUEL GAS PIPING | x | x | x | x | x | x | IAW Division 1 and Division 23 | Section 23 1123 para 1.3 & 1.6 | |||||||||||||||||||||
| 197 | Coordination Drawings | x | IAW Division 1 and Division 23 | Section 23 1123 para 1.3 (C) | ||||||||||||||||||||||||||
| 198 | Pre-Outage Coordination | IAW Division 1 and Division 23 | Section 23 1123 para 1.6 (A) | |||||||||||||||||||||||||||
| 199 | CEILING FANS | x | x | x | IAW Division 1 and Division 23 | Section 23 3475 para 1.3 | ||||||||||||||||||||||||
| 200 | Coordination Drawings | x | IAW Division 1 and Division 23 | Section 23 3475 para 1.3 (C) | ||||||||||||||||||||||||||
| 201 | GAS-FIRED RADIANT HEATING SYSTEM | x | x | x | IAW Division 1 and Division 23 | Section 23 5523 para 1.3 | ||||||||||||||||||||||||
| 202 | Wiring Diagrams | x | IAW Division 1 and Division 23 | Section 23 5523 para 1.3 (C) | ||||||||||||||||||||||||||
| 203 | Nameplates | x | IAW Division 1 and Division 23 | Section 23 5523 para 1.3 (E ) | ||||||||||||||||||||||||||
| 204 | GENERAL ELECTRIC - ELECTRIC SUBMITTAL REQUIREMENTS | IAW Division 1 and Division 26 | Section 26 0010 - 9 | |||||||||||||||||||||||||||
| 205 | Lighting Fixtures | x | x | x | x | IAW Division 1 and Division 26 | Section 26 00 10 | |||||||||||||||||||||||
| 206 | Contactors and Time Clocks | x | IAW Division 1 and Division 26 | Section 26 00 10 | ||||||||||||||||||||||||||
| 207 | Low Voltage Switching System | x | IAW Division 1 and Division 26 | Section 26 00 10 | ||||||||||||||||||||||||||
| 208 | Panelboards, Switchboards, MCC, Disconnect | x | IAW Division 1 and Division 26 | Section 26 00 10 | ||||||||||||||||||||||||||
| 209 | Emergency Engine Generator, Transfer Switch, Auxiliary Equipment | x | IAW Division 1 and Division 26 | Section 26 00 10 | ||||||||||||||||||||||||||
| 210 | Fire Alarm System Components | x | x | IAW Division 1 and Division 26 | Section 26 00 10 | |||||||||||||||||||||||||
| 211 | Security System Components | x | IAW Division 1 and Division 26 | Section 26 00 10 | ||||||||||||||||||||||||||
| 212 | Public Address System Components | x | IAW Division 1 and Division 26 | Section 26 00 10 | ||||||||||||||||||||||||||
| 213 | Audio System Components | x | x | IAW Division 1 and Division 26 | Section 26 00 10 | |||||||||||||||||||||||||
| 214 | Disconnect Devices | x | x | IAW Division 1 and Division 26 | Section 26 00 11 | |||||||||||||||||||||||||
| 215 | Boxes and Devices | x | x | IAW Division 1 and Division 26 | Section 26 00 10 | |||||||||||||||||||||||||
| 216 | Fuses | x | x | x | x | IAW Division 1 and Division 26 | Section 26 00 10 | |||||||||||||||||||||||
| 217 | Wireway, Cable Tray, Surface Mounted Raceway | x | IAW Division 1 and Division 26 | Section 26 00 10 | ||||||||||||||||||||||||||
| 218 | Lighting System Components (relays, sensors, etc.) | x | x | IAW Division 1 and Division 26 | Section 26 00 10 | |||||||||||||||||||||||||
| 219 | Light Dimming Equipment | x | IAW Division 1 and Division 26 | Section 26 00 10 | ||||||||||||||||||||||||||
| 220 | Lamps | x | IAW Division 1 and Division 26 | Section 26 00 10 | ||||||||||||||||||||||||||
| 221 | Wiring Devices - Switches, Receptacles, etc. | x | x | x | x | IAW Division 1 and Division 26 | Section 26 00 10 | |||||||||||||||||||||||
| 222 | Device Wall Plates | x | x | IAW Division 1 and Division 26 | Section 26 00 10 | |||||||||||||||||||||||||
| 223 | Lightning Protection Components | x | x | x | IAW Division 1 and Division 26 | Section 26 00 10 | ||||||||||||||||||||||||
| 224 | Product Substitutions | x | x | Required Prior to Bid Opening | Section 26 00 10 | |||||||||||||||||||||||||
| 225 | Schedule of Values | x | IAW Division 1 and Division 26 | Section 26 00 10 | ||||||||||||||||||||||||||
| 226 | Record Drawings | x | IAW Division 1 and Division 26 | Section 26 00 10 | ||||||||||||||||||||||||||
| 227 | Operations and Maintenance Manuals | x | IAW Division 1 and Division 26 | Section 26 00 10 | ||||||||||||||||||||||||||
| 228 | Test Reports | x | x | IAW Division 1 and Division 26 | Section 26 08 05 | |||||||||||||||||||||||||
| 229 | Inspection Wells | x | IAW Division 1 and Division 26 | Section 26 05 26 | ||||||||||||||||||||||||||
| 230 | Emergency Generator Set | x | x | x | IAW Division 1 and Division 26 | Section 26 32 13 | ||||||||||||||||||||||||
| 231 | Automatic Transfer Switch | x | x | x | IAW Division 1 and Division 26 | Section 26 32 23 | ||||||||||||||||||||||||
| 232 | SPD for MDP | x | x | x | IAW Division 1 and Division 26 | Section 26 43 13 | ||||||||||||||||||||||||
| 233 | SPD for Panelboards | x | x | x | IAW Division 1 and Division 26 | Section 26 43 14 | ||||||||||||||||||||||||
| 234 | LOW VOLTAGE POWER CONDUCTORS AND CABLES | x | x | IAW Division 1 and Division 26 | Section 26 05 19 | |||||||||||||||||||||||||
| 235 | HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS | x | x | IAW Division 1 and Division 26 | Section 26 0529 | |||||||||||||||||||||||||
| 236 | ENCLOSED SWITCHES | x | x | IAW Division 1 and Division 26 | Section 26 2816 | |||||||||||||||||||||||||
| 237 | CATHODIC PROTECTION SYSTEM | x | IAW Division 1 and Division 26 | SOW Section 2.4 | ||||||||||||||||||||||||||
| 238 | STRUCTURED CABLE SYSTEM | x | x | x | x | x | x | x | x | x | IAW Division 1 and Division 27 | Section 27 1000 para 1.04 | ||||||||||||||||||
| Contractors Experience and Qualifications | x | IAW Division 1 and Division 27 | Section 27 1000 para 1.04 | |||||||||||||||||||||||||||
| DIGITAL FIRE ALARM MASS NOTIFICATION | x | x | x | x | x | x | x | x | x | IAW Division 1 and Division 28 | Section 28 31 11 para 1.4, 1.5, 17, and 1.8 | |||||||||||||||||||
| Delegated-Design Submittal | x | x | x | x | IAW Division 1 and Division 28 | Section 28 31 11 para 1.4 | ||||||||||||||||||||||||
| Qualification Data | x | IAW Division 1 and Division 28 | Section 28 31 11 para 1.5 | |||||||||||||||||||||||||||
| Seismic Qualification Certificates | IAW Division 1 and Division 28 | Section 28 31 11 para 1.5 | ||||||||||||||||||||||||||||
| Field Quality Control Reports | x | IAW Division 1 and Division 28 | Section 28 31 11 para 1.5 | |||||||||||||||||||||||||||
| Software and Firmware Operational Documentation | x | IAW Division 1 and Division 28 | Section 28 31 11 para 1.7 | |||||||||||||||||||||||||||
| EARTH MOVING | IAW Division 1 and Division 31 | Section 31 2000 | ||||||||||||||||||||||||||||
| Aggregate Base Course & Engineered or Structural Fill Gradation & Material Samples | x | x | IAW Division 1 and Division 31 | Section 31 2000 para 1.5 | ||||||||||||||||||||||||||
| Utility Pre-outage Coordination | x | IAW Division 1 and Division 31 | Section 31 2000 para 1.6 | |||||||||||||||||||||||||||
| CONCRETE PAVING | x | x | x | x | IAW Division 1 and Division 32 | Section 32 1313 para 1.2 and 1.3 (A) | ||||||||||||||||||||||||
| SEEDING | x | x | x | IAW Division 1 and Division 32 | Section 32 9200 1.4-1.6 | |||||||||||||||||||||||||
| Qualification Data | x | IAW Division 1 and Division 32 | Section 32 9200 1.4 | |||||||||||||||||||||||||||
| Certification of Grass Seed | x | IAW Division 1 and Division 32 | Section 32 9200 1.4 | |||||||||||||||||||||||||||
| Pesticides and Herbicides | x | x | IAW Division 1 and Division 32 | Section 32 9200 1.4 | ||||||||||||||||||||||||||
| Installer Qualifications | x | x | IAW Division 1 and Division 32 | Section 32 9200 1.6 | ||||||||||||||||||||||||||
| Pesticide Applicator | x | x | IAW Division 1 and Division 32 | Section 32 9200 1.6 | ||||||||||||||||||||||||||
| WATER UTILITY DISTRIBUTOR PIPING | x | x | x | x | x | IAW Division 1 and Division 33 | Section 33 1100 para 1.2 |
&9Project Submittal Form AF-66
File details come from the government source that posted it. Updated .