Ridgemoor Blvd and Brooker Creek at Brooker Creek Bridge #154153 Bridge Replacement Project (PID 005749A)

Closed State & local contract opportunity

Solicitation number
26-0506-ITB-C
State
Florida
Responses due

Opportunity facts

UNSPSC codes
Show all 44
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

Pinellas County is requesting sealed bids for the Ridgemoor Boulevard Bridge replacement project over Brooker Creek in a two-step qualification process, with Step One qualifications due July 7, 2026 at 3:00 PM and Step Two bids due July 28, 2026 at 3:00 PM under ITB-C #26-0506. This is a federally funded Local Agency Program (LAP) project administered by the Florida Department of Transportation.

Bidders must be FDOT pre-qualified in Minor Bridges and Pile Driving work types in amounts equal to or exceeding their bid amount — a decisive eligibility filter. The SBE participation goal is N/A. Questions are due July 3, 2026 at 3:00 PM; no mandatory pre-bid conference or site visit is specified.

The scope replaces a 120-foot flat-slab bridge with a 135-foot prestressed concrete structure over Brooker Creek, including related roadway reconstruction, drainage improvements, approach slabs, and temporary traffic control. The new bridge spans 134 feet total with two main spans (73 and 61 feet) supported by three bents using 24-inch square prestressed concrete piles. Work includes utility relocations coordinated with Pinellas County Utilities, Duke Energy, Clearwater Gas, Frontier Communications, and MCI; sediment and erosion control with turbidity barriers; and environmental compliance under SWFWMD Environmental Resource Permit (valid through November 12, 2029) and USACE Nationwide Permit 14 (valid through March 15, 2031). The contractor must obtain an FDEP NPDES Construction Generic Permit at its own expense. Permanent wetland impact is 0.043 acre of Waters of the United States; temporary construction impact is 0.0017 acre. All work must comply with FDOT FY 2026-27 Standard Specifications and Pinellas County Supplemental Specifications; Davis-Bacon Act prevailing wage applies, ranging from $14.00 to $33.61 per hour plus fringe benefits.

The estimated project cost is $7.616 million, with federal funding participation up to $3.063 million through FDOT LAP. The contractor must commence work within 15 consecutive calendar days of notice to proceed and complete all work within 960 consecutive calendar days, with substantial completion by July 15, 2029. A 5% bid bond is required with bid submission; upon award, performance and payment bonds each equal to 100% of contract value are required. Unit prices firm for contract duration. The contractor is responsible for all permit procurement and license costs (permits reimbursable with official receipts; licenses non-reimbursable). E-Verify compliance, trench safety certification per Florida Statutes Section 553.60 et seq., and asbestos handling procedures are mandatory. Payment follows Florida's Local Government Prompt Payment Act at Net 45 with 5% retainage until satisfactory completion and final acceptance.

Opportunity text

Pinellas County is replacing the Ridgemoor Boulevard Bridge over Brooker Creek. The current 120‑foot flat‑slab bridge will be replaced with a 135‑foot structure along with related roadway and drainage improvements.

This is a federally funded Local Agency Program (LAP) project administered through the Florida Department of Transportation (FDOT).

Files

File Type Posted
Ridgemoor_Blvd_and_Brooker_Creek_at_Brooker_Creek_Bridge_#154153_Bridge_Replacement_Project_(PID_005749A)_(Addendum_#1_Revision).pdf PDF
Ridgemoor_Blvd_and_Brooker_Creek_at_Brooker_Creek_Bridge_#154153_Bridge_Replacement_Project_(PID_005749A).pdf PDF
Appendix_4_-_Special_Notices_6.23.pdf PDF
Appendix_6_FDOT_Environmental_Certification_Memo_01-30-2024.pdf PDF
Appendix_6_FDOT_Environmental_Certification_Memo_02-5-2026.pdf PDF
Appendix_6_FDOT_Utility_Certification_Memo_02-25-2026.pdf PDF
Appendix_5_UWS_Clearwater_Gas.pdf PDF
Appendix_6_Construction_Project_Requirements_Memo_02-27-2026.pdf PDF
Appendix_6_FDOT_Preliminary_Engineering_Certification_Memo_03-6-2026.pdf PDF
Appendix_6_FDOT_Spectrum_Clear_Letter_3-27-2026.pdf PDF
Appendix_5_UWS_Duke.pdf PDF
Appendix_5_UWS_Frontier.pdf PDF
Appendix_5_UWS_Pinellas_County_Utilities.pdf PDF
Appendix_6_FDOT_Railroad_Certification_Memo_12-19-2025.pdf PDF
Appendix_6_FDOT_Right_of_Way_Certification_Memo_12-10-2025.pdf PDF
Appendix_6_Geotechnical_Exploration_–_Structures_Report_03-05-2026.pdf PDF
Appendix_5_UWS_MCI_Metro_Access_Transmission_Services.pdf PDF
Appendix_6_FDOT_Engineering_“No-Rise”_Certification_Memo_11-12-2025.pdf PDF
Appendix_6_FDOT_Permit_Certification_Memo__02-24-2026.pdf PDF
Appendix_6_FDOT_WOW_Clear_Letter_8-2-2024.pdf PDF
PLANS_-_Sediment_and_Erosion_Control.pdf PDF
PLANS_-_ROADWAY.pdf PDF
PLANS-STRUCTURES.pdf PDF
Sample_Performance_and_Payment_Bonds_26-0506.pdf PDF
FDOT_Specifications_Package.pdf PDF
Section_7_-_County_Specifications.pdf PDF
APPENDIX_1-Permits_.pdf PDF
Sample_Application_for_Payment.pdf PDF
Sample_Change_Order.pdf PDF
Affdavit_of_Release_and_Guarantee.pdf PDF
Pricing_Proposal_ITB_26-0506(reference_only).pdf PDF
E-Verify_Affidavit.pdf PDF
OpenGov_Fillable-_Final.pdf PDF
Florida_Trench_Safety_Form.pdf PDF
QUALIFICATION-SUBMITTAL-FORM_FDOT.pdf PDF
Appendix_1-Permits_.pdf PDF
Sample_Agreement-26-0506.pdf PDF
2025_Pinellas_County_Supplemental_Specifications_.pdf PDF
SBE_Compliance_Form.pdf PDF
QUALIFICATION_SUBMITTAL_FORM_4-26-2026.pdf PDF
FDOT_Division_Specification_(FY2026-27)-ebook(signed)_(For_Legistar_only).pdf PDF
Airport_Security_Program.pdf PDF
Bid_Submittal_Form-JOC.pdf PDF
Pricing_Proposal_(for_Review_Only).xlsx XLSX spreadsheet
Non-Competitive_Oversight_Committee_Justification_Form.docx DOCX document
Show all 45

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors