Appendix_6_Construction_Project_Requirements_Memo_02-27-2026.pdf
PDF 73 KB Posted
- Attached to
- Ridgemoor Blvd and Brooker Creek at Brooker Creek Bridge #154153 Bridge Replacement Project (PID 005749A)
- Solicitation number
- 26-0506-ITB-C
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
This is a Construction Project Requirements Memorandum prepared by Pinellas County, Florida, in coordination with the Florida Department of Transportation (FDOT) for the Ridgemoor Boulevard Bridge Replacement Project (PID 005749A). The project encompasses the replacement of the existing 120-foot flat slab bridge spanning Brooker Creek with a new 135-foot structure, along with associated roadway and drainage improvements. The memorandum, dated February 27, 2026, outlines the technical and administrative requirements that construction contractors must satisfy throughout project execution. Key requirements address design standards, engineering specifications, environmental compliance, traffic management during construction, and quality assurance protocols. The document establishes mandatory compliance with FDOT standards, Americans with Disabilities Act (ADA) requirements, and applicable federal and state regulations governing bridge construction and roadway improvements.
The project is federally funded through the Local Agency Program (LAP) administered by FDOT, which establishes specific funding requirements and oversight obligations for the contractor. Construction requirements include detailed specifications for materials, workmanship, safety protocols, and milestone completion schedules. The memorandum emphasizes adherence to environmental mitigation measures related to work in and around Brooker Creek, protection of existing utilities, and maintenance of traffic flow throughout construction phases. Contractors must demonstrate experience with bridge replacement projects of similar scale and complexity, possess appropriate licensing and bonding, and maintain compliance with prevailing wage requirements under federal funding guidelines. The document serves as the technical foundation for bid solicitation and contract administration, ensuring all construction activities align with federal, state, and local standards throughout the project lifecycle.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .