About this file

This is a roadway plans document for Pinellas County Public Works detailing the Ridgemoor Boulevard and Brooker Creek Bridge #154572 replacement project (Financial Project ID 445437-1-58-01), a federally funded Local Agency Program project administered through the Florida Department of Transportation. The project involves replacing a 120-foot flat slab bridge with a 135-foot structure and includes related roadway reconstruction, milling and resurfacing, drainage improvements, and temporary traffic control measures. The design plans prepared by Michael Baker International, Inc. encompass typical sections, roadway profiles, cross sections, drainage structures, and utility coordination across approximately 324 stations, with project limits extending from Station 581+20.00 to Station 905+03.07. The roadway design features 12-foot travel lanes, 5-foot paved shoulders with 3-foot unpaved sections in certain areas, concrete sidewalks along the bridge approach, and 4-inch reinforced concrete ditch pavement in select locations. Design specifications indicate a 45 miles per hour design speed with a projected opening year of 2026 and design year of 2046, serving an estimated current year (2022) average annual daily traffic of 7,200 vehicles.

The project incorporates four construction phases with specific traffic control configurations, including temporary signal control operations, lane shifts, temporary pedestrian walkways, and a full bridge closure detour plan. Utility adjustments and relocations are required for multiple providers including Pinellas County Utilities, Duke Energy, Clearwater Gas, Frontier Communications, and MCI, with specific conditions noted regarding existing water main, gas main, conduit, and drainage infrastructure. The plans reference Florida Department of Transportation FY 2026-27 Standard Specifications and Standard Plans for Road and Bridge Construction, with all design work digitally signed and sealed by Professional Engineers Timothy P. Wineberg (PE License #84217) and Paul Q. Snead (PE License #56982) under Rule 61G15-23.004, F.A.C. The survey information was obtained from licensed Florida Professional Surveyor and Mapper Peter J. Mattson (PSM #6290) with Element Engineering Group, LLC, and elevations are referenced to the North American Vertical Datum of 1988 using the Florida State Plane Coordinate System, West Zone.

View the file

Other files

File Type Posted
Ridgemoor_Blvd_and_Brooker_Creek_at_Brooker_Creek_Bridge_#154153_Bridge_Replacement_Project_(PID_005749A)_(Addendum_#1_Revision).pdf PDF
Ridgemoor_Blvd_and_Brooker_Creek_at_Brooker_Creek_Bridge_#154153_Bridge_Replacement_Project_(PID_005749A).pdf PDF
Appendix_6_Geotechnical_Exploration_–_Structures_Report_03-05-2026.pdf PDF
Appendix_5_UWS_Pinellas_County_Utilities.pdf PDF
Appendix_6_FDOT_Right_of_Way_Certification_Memo_12-10-2025.pdf PDF
Appendix_6_FDOT_Engineering_“No-Rise”_Certification_Memo_11-12-2025.pdf PDF
PLANS_-_Sediment_and_Erosion_Control.pdf PDF
Appendix_6_Construction_Project_Requirements_Memo_02-27-2026.pdf PDF
Appendix_6_FDOT_Spectrum_Clear_Letter_3-27-2026.pdf PDF
Appendix_5_UWS_Clearwater_Gas.pdf PDF
Appendix_5_UWS_MCI_Metro_Access_Transmission_Services.pdf PDF
Appendix_6_FDOT_Environmental_Certification_Memo_01-30-2024.pdf PDF
Appendix_4_-_Special_Notices_6.23.pdf PDF
Appendix_6_FDOT_Preliminary_Engineering_Certification_Memo_03-6-2026.pdf PDF
Appendix_5_UWS_Duke.pdf PDF
Appendix_6_FDOT_WOW_Clear_Letter_8-2-2024.pdf PDF
Appendix_6_FDOT_Permit_Certification_Memo__02-24-2026.pdf PDF
Appendix_6_FDOT_Environmental_Certification_Memo_02-5-2026.pdf PDF
Appendix_6_FDOT_Utility_Certification_Memo_02-25-2026.pdf PDF
Appendix_5_UWS_Frontier.pdf PDF
Appendix_6_FDOT_Railroad_Certification_Memo_12-19-2025.pdf PDF
PLANS-STRUCTURES.pdf PDF
Sample_Performance_and_Payment_Bonds_26-0506.pdf PDF
Section_7_-_County_Specifications.pdf PDF
FDOT_Specifications_Package.pdf PDF
APPENDIX_1-Permits_.pdf PDF
Sample_Application_for_Payment.pdf PDF
Sample_Change_Order.pdf PDF
QUALIFICATION-SUBMITTAL-FORM_FDOT.pdf PDF
Affdavit_of_Release_and_Guarantee.pdf PDF
Pricing_Proposal_ITB_26-0506(reference_only).pdf PDF
OpenGov_Fillable-_Final.pdf PDF
E-Verify_Affidavit.pdf PDF
Florida_Trench_Safety_Form.pdf PDF
Appendix_1-Permits_.pdf PDF
Sample_Agreement-26-0506.pdf PDF
2025_Pinellas_County_Supplemental_Specifications_.pdf PDF
SBE_Compliance_Form.pdf PDF
QUALIFICATION_SUBMITTAL_FORM_4-26-2026.pdf PDF
FDOT_Division_Specification_(FY2026-27)-ebook(signed)_(For_Legistar_only).pdf PDF
Airport_Security_Program.pdf PDF
Bid_Submittal_Form-JOC.pdf PDF
Pricing_Proposal_(for_Review_Only).xlsx XLSX spreadsheet
Non-Competitive_Oversight_Committee_Justification_Form.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WorkProgram_Tbl15_Dissolved_2004,itemseg,4454371 https://owpbstandardmap.fdot.gov/?query=PROJECT LOCATION URL:

BEGIN MP 0.499 - END MP 0.522

NONE

BR#154572 MP 0.499 - MP 0.522

NONE

PROJECT LIMITS:

EXCEPTIONS:

BRIDGE LIMITS:

RAILROAD CROSSING:

STRUCTURES

ROADWAY

SIGNING & PAVEMENT MARKING PLAN

VERIFIED UTILITY LOCATE

UTILITY ADJUSTMENTS

TEMPORARY TRAFFIC CONTROL PLAN

ROADWAY CROSS SECTIONS

DRAINAGE STRUCTURES

ROADWAY PROFILE

ROADWAY PLAN-PROFILES

GENERAL NOTES

PROJECT CONTROL

MODEL MANAGEMENT

TYPICAL SECTION DETAILS

TYPICAL SECTIONS

SIGNATURE SHEET

KEY SHEET

52 - 55

48 - 50

26 - 47

15 - 25

10 - 12

3 - 5

(FEDERAL FUNDS)

F

LO

R

ID

A 'S

T H

E O

F F

I C

I A

L R

E C

O R

D O

F T

H I S

S H

E E

T I

S T

H E

E L

E C

T R

O N

I C

F I L

E D

I G

I T

A L

L Y

S I G

N E

D A

N D

S E

A L

E D

U N

D E

R R

U L

E

G

.0

F

.A .C

/2

/2

:5

:2

A M

FT LAUDERDALE

MIAMI

NAPLES

KEY WEST

SHEET DESCRIPTIONSHEET NO.

E d

.M a c k e n z ie

P.I.D. NUMBER 005749A

FINANCIAL PROJECT ID 445437-1-58-01

PINELLAS COUNTY (15000435)INDEX OF ROADWAY PLANS

RIDGEMOOR BLVD AND BROOKER CREEK AT BROOKER CREEK BRIDGE #154572

BEE LINE

EXPRESSWAY

T U

R N P

IK

E

PENSACOLA FORT WALTON

BEACH

PANAMA

CITY

CHIPLEY

TALLAHASSEE

JACKSONVILLE

ST AUGUSTINE

GAINESVILLE

OCALA DAYTONA BEACH

DELAND

NEW PORT RICHEY

TAMPA

LAKELAND

MELBOURNE -

COCOA

ORLANDO

BARTOWST PETERSBURG

SARASOTA -

BRADENTON

FT PIERCE

FT MYERS

WEST PALM

BEACH

PINELLAS COUNTY

PUBLIC WORKS

ROADWAY PLANS

CONTRACT PLANS COMPONENTS

NO.

SHEET

YEAR

FISCAL

CITY

LAKE

RAFAL KADAJ, P.E.

PROJECT MANAGER:

PINELLAS COUNTY

ENGINEER OF RECORD:

ROADWAY PLANS

c u s e r s \p u b li c \m b ip w \5

\d m s \K

E Y

S R

D .d g n

VENDOR NO: F251228638

CONTRACT NO: CAE83

PHONE # (407) 562-4119

ORLANDO, FLORIDA 32801

200 EAST ROBINSON STREET, SUITE 250

MICHAEL BAKER INTERNATIONAL, INC.

P.E. LICENSE NUMBER 84217

TIMOTHY P. WINEBERG, P.E.

LOCATION OF PROJECT

GOVERNING STANDARD SPECIFICATIONS:

http://www.fdot.gov/programmanagement/Implemented/SpecBooks for Road and Bridge Construction at the following website:

Florida Department of Transportation, FY 2026-27 Standard Specifications

GOVERNING STANDARD PLANS:

Component

Standard Plans for Bridge Construction are included in the Structures Plans following website: http://www.fdot.gov/design/standardplans

Standard Plans for Road Construction and associated IRs are available at the

Bridge Construction and applicable Interim Revisions (IRs).

Florida Department of Transportation, FY2026-27 Standard Plans for Road and https://owpbstandardmap.fdot.gov/?query=WorkProgram_Tbl15_Dissolved_2004,itemseg,4454371 http://www.fdot.gov/programmanagement/implemented/specbooks/ http://www.fdot.gov/design/standardplans

SIGNATURE SHEET

STATE OF

No. 84217

ESNECIL GREBENIW .P YHTO

MI

T

R E

E

NIGNE LANOIS

SEF

O R

P

ADIROL

F ON ANY ELECTRONIC COPIES.

SIGNATURE MUST BE VERIFIED

ON THE DATE ADJACENT TO THE SEAL

SIGNED AND SEALED BY:

THIS ITEM HAS BEEN DIGITALLY

TIMOTHY P. WINEBERG, P.E. NO. 84217

ORLANDO, FLORIDA 32801

200 EAST ROBINSON STREET, SUITE 250

MICHAEL BAKER INTERNATIONAL, INC.

FOLLOWING SHEETS IN ACCORDANCE WITH RULE 61G15-23.004, F.A.C.

THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR THE

SHEET DESCRIPTIONSHEET NO.

52 - 55

48 - 50

26 - 47

15 - 25

10 - 12

3 - 5

SIGNING & PAVEMENT MARKING PLAN

VERIFIED UTILITY LOCATE

UTILITY ADJUSTMENTS

TEMPORARY TRAFFIC CONTROL PLAN

ROADWAY CROSS SECTIONS

ROADWAY PROFILE

ROADWAY PLAN-PROFILES

GENERAL NOTES

PROJECT CONTROL

MODEL MANAGEMENT

TYPICAL SECTION DETAILS

TYPICAL SECTIONS

SIGNATURE SHEET

KEY SHEET

ON ANY ELECTRONIC COPIES.

SIGNATURE MUST BE VERIFIED

ON THE DATE ADJACENT TO THE SEAL

SIGNED AND SEALED BY:

THIS ITEM HAS BEEN DIGITALLY

PAUL Q. SNEAD, P.E. NO. 56982

ORLANDO, FLORIDA 32801

200 EAST ROBINSON STREET, SUITE 250

MICHAEL BAKER INTERNATIONAL, INC.

FOLLOWING SHEETS IN ACCORDANCE WITH RULE 61G15-23.004, F.A.C.

THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR THE

SHEET DESCRIPTIONSHEET NO.

DRAINAGE STRUCTURES

SIGNATURE SHEET

445437-1-58-01

PINELLAS

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEETPINELLAS COUNTY

PUBLIC WORKS

ROAD NO. FINANCIAL PROJECT IDCOUNTY

/2

/2 c u s e rs \p u b li c \m b ip w \5

\d m s

\S

IG

N R

D

.d g n

:0

:2

A

M E d .M a c k e n z ie

32801 FLORIDA, ORLANDO

200 EAST ROBINSON STREET, SUITE 250

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

ENGINEER OF RECORD

STATE OF

No 56982

ESNECIL

DAENS .Q LUAP

R E

E

NIGNE LANOIS

SEF

O R

P

ADIROL

F

Natural Ground

R/W LINE

LIMITS OF CONSTRUCTION

R/W VARIES (202' MIN.)

STANDARD CLEARING AND GRUBBING

LIMITS OF CONSTRUCTION

R/W LINE

1:6

0.02

8' 24'

LBR 40

TYPE B STABILIZATION

12"

SOD

1:6

Natural Ground

� CONST. RIDGEMOOR BLVD.

STA. 589+57.71 TO STA. 904+02.33 (RT.)

STA. 589+57.71 TO STA. 595+00.00 (LT.)

STA. 583+44.69 TO STA. 587+63.63 (RT.)

(LT.)STA. 584+81.33 TO STA. 587+63.63

RIDGEMOOR BLVD

TYPICAL SECTION 1

SOD

GRADE POINT

PROFILE

4" 4" 4" 4"

8'

0.06 0.05

6" CONCRETE SIDEWALK

TRAVEL LANES

FRICTION COURSE FC-12.5 (TRAFFIC C) (1.5") (PG 76-22)

TYPE SP STRUCTURAL COURSE (TRAFFIC C) (4.0")

OPTIONAL BASE GROUP 6

SHOULDER PAVEMENT

FRICTION COURSE FC-12.5 (TRAFFIC C) (1.5") (PG 76-22)

TYPE SP STRUCTURAL COURSE (TRAFFIC C) (1.5")

OPTIONAL BASE GROUP 1

5'

SHLDR.

PAVT.

5'

SHLDR.

PAVT.

12' 12'

TRAVEL LANES

0.02

2' MIN.

2' MIN.

5'

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/2 c u s e rs

\p u b li c \m b ip w \5

\d m s \T

Y P

S R

D .d g n

:4

:0

A

M E d .M a c k e n z ie

32801 FLORIDA, ORLANDO

200 EAST ROBINSON STREET, SUITE 250

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

TYPICAL SECTIONS

TRAFFIC DATA

DESIGN SPEED = 45 MPH

DESIGN HOUR T = 2.8

K = 9 D = 53.2 T = 5.6

ESTIMATED DESIGN YEAR = 2046 AADT = N/A*

ESTIMATED OPENING YEAR = 2026 AADT = N/A*

CURRENT YEAR = 2022 AADT = 7200

SYSTEM ROADWAY.

AS THIS IS A BRIDGE REPLACEMENT PROJECT ON AN OFF

* FDOT IS NOT REQUIRING ANY PROJECTED TRAFFIC CALCS

NOTES

PINELLAS COUNTY

R/W VARIES (70' MIN.) R/W VARIES (132' MIN.)

R/W LINE R/W LINE

BULLET RAILING

PEDESTRIAN/BICYCLE

PARAPET WITH

27" CONCRETE

(WITHOUT SLOTS)

PER STANDARD PLANS INDEX 521-427

36" SINGLE-SLOPE TRAFFIC RAILING

BULLET RAILING

PEDESTRIAN/BICYCLE

PARAPET WITH

27" CONCRETE

59'-8"

TRAVEL LANES

24'

12'12' 8'

SHLDR

10'

1'1'-4"

8'

SHLDR

1'

0.02

0.02 0.02

0.02

STA. 587+63.63 TO STA. 589+57.71

RIDGEMOOR BLVD OVER BROOKER CREEK

TYPICAL SECTION 2

� CONST. RIDGEMOOR BLVD.

1'-4"

0.02 0.02

TRAIL

MULTIUSE

CONCRETE

(WITH SLOTS)

PER STANDARD PLANS INDEX 521-427

36" SINGLE-SLOPE TRAFFIC RAILING

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/2 c u s e rs

\p u b li c \m b ip w \5

\d m s \T

Y P

S R

D .d g n

:4

:3

A

M E d .M a c k e n z ie

32801 FLORIDA, ORLANDO

200 EAST ROBINSON STREET, SUITE 250

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

DESIGN HOUR T = 2.8

K = 9 D = 53.2 T = 5.6

ESTIMATED DESIGN YEAR = 2046 AADT = N/A*

ESTIMATED OPENING YEAR = 2026 AADT = N/A*

CURRENT YEAR = 2022 AADT = 7200

SYSTEM ROADWAY.

AS THIS IS A BRIDGE REPLACEMENT PROJECT ON AN OFF

* FDOT IS NOT REQUIRING ANY PROJECTED TRAFFIC CALCS

NOTES

EXIST. CONCRETE SIDEWALK

EXIST. CONCRETE SIDEWALK

VARIES (0'-40')

11' 12' 12' 12'

R/W VARIES (97' MIN.) R/W VARIES (93' MIN.)

R/W LINE R/W LINE

STA. 904+02.33 TO STA. 905+03.07 (RT.)

STA. 73+11.82 TO STA. 84+30.00 � SURVEY (LT.)

STA. 581+20.00 TO STA. 583+44.69 (RT.) **

STA. 581+20.00 TO STA. 584+81.33 (LT.) **

RIDGEMOOR BLVD

TYPICAL SECTION 3

� SURVEY RIDGEMOOR BLVD.

TREATMENT I

2'-8" SOD

Natural Ground

Natural Ground

MATCH EXIST.

TRAVEL LANES AND SHOULDERS

FRICTION COURSE FC-12.5 (TRAFFIC C) (1.5") (PG 76-22)

MILL EXISTING ASPHALT PAVEMENT (1.5" AVG. DEPTH)

VARIES (12'-23')

MILLING & RESURFACING

MATCH EXIST.

TREATMENT I

2'-8" SOD

� CONST. RIDGEMOOR BLVD.

5'

PAVT.

SHLDR.

MILLING & RESURFACING

MATCH EXIST.

MATCH EXIST.

VARIES (12'-23')

� CONST. PGL RT.

TRAVEL LANES TRAVEL LANES

TYPE F

GUTTER

CURB AND

EXIST.

TYPE F

GUTTER

CURB AND

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/9

/2 c u s e rs

\p u b li c \m b ip w \5

\d m s \T

Y P

S R

D .d g n

:4

:2

P

M P a tr ic k .S iu

32801 FLORIDA, ORLANDO

200 EAST ROBINSON STREET, SUITE 250

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

DESIGN HOUR T = 2.8

K = 9 D = 53.2 T = 5.6

ESTIMATED DESIGN YEAR = 2046 AADT = N/A*

ESTIMATED OPENING YEAR = 2026 AADT = N/A*

CURRENT YEAR = 2022 AADT = 7200

UNDIVIDED ROADWAY. SCOPE OF WORK IS SIMILAR.

** TYPICAL SHOWS DIVIDED ROADWAY, THESE LIMITS ARE

SYSTEM ROADWAY.

AS THIS IS A BRIDGE REPLACEMENT PROJECT ON AN OFF

* FDOT IS NOT REQUIRING ANY PROJECTED TRAFFIC CALCS

NOTES

4"

0.02

SHOULDER PAVEMENT DETAIL

1:6

LBR 40

STABILIZATION

TYPE B

0.06

8'

PAVEMENT

SHOULDER

5'

OPTIONAL BASE

AT NO ADDITIONAL COMPENSATION

OF OPTIONAL BASE MATERIAL (GRANULAR ONLY)

THIS AREA MAY BE CONSTRUCTED

0.02

SHOULDER GUTTER DETAIL

4"

LBR 40

STABILIZATION

TYPE B

0.06

PAVEMENT

SHOULDER

5'

OPTIONAL BASE

3.5'

0.06

4'

6"

4"

PAVT. UNDER GUARDRAIL

2" MISC. ASPHALT

WITHOUT GUARDRAIL

1:4 OR FLATTER

1:3 WITH GUARDRAIL

SLOPE VARIES;

EXCEED 6'

AND FILL HEIGHTS

WHEN SLOPES EXCEED 1:3

GUARDRAIL REQUIRED

AT NO ADDITIONAL COMPENSATION

OF OPTIONAL BASE MATERIAL (GRANULAR ONLY)

THIS AREA MAY BE CONSTRUCTED

STA. 589+58.41 TO STA. 592+38.44 (LT.)

STA. 585+37.52 TO STA. 587+62.86 (LT.)

SHOULDER GUTTER

0.02

1:6

0.06

8'

SHOULDER DETAIL

STA. 592+38.65 TO STA. 595+00.00 (LT.)

DITCH DETAIL

STA. 584+00.00 TO STA. 585+45.17 (LT.)

DITCH DETAIL

STA. 585+45.17 TO STA. 585+50.00 (LT.)

1:

1:4

0.06

VARIES 4'-9'

1:6

4'

0.06

12' 12'

(M

AX)

1:4

STA. 904+02.33 TO STA. 905+03.07 (RT.)

STA. 595+00.00 TO STA. 597+68.21 (LT.)

NTS

OVERBUILD AND RESURFACING

� CONST. RIDGEMOOR BLVD.

TREATMENT II

POINT

GRADE

PROFILE

POINT

GRADE

PROFILE

VARIES (12'-23')

0.02 0.020.02

LIMITS

MILLING & RESURFACING

0' TO 13'

MATCH EXIST.

VARIES

FC-12.5 (1.5") (PG 76-22)

TYPE SP OVERBUILD

VARIES (5' TO 7.60'±)

SHLDR.

PAVT.

0.02

FC-12.5 (1.5") (PG 76-22)

TYPE SP OVERBUILD

7.5' 4' 8.5'

TREATMENT I

2'-8" SOD

10'

SHLDR.

SOD

SOD

SLOPES 1:3 OR STEEPER

BE ADDED FOR ANY

PLASTIC MAT WILL

MAX

1:3

MAX

1:3GROUND

MATCH EXIST.

GROUND

MATCH EXIST.

(0'-22')

OVERBUILD LIMITS

(0'-7.8')

OVERBUILD LIMITS

� SURVEY RIDGEMOOR BLVD.

SOD LIMITS

MILLING & RESURFACING

� CONST. PGL RT.

CURB AND GUTTER TYPE F

TYPE F

GUTTER

CURB AND

EXIST.

MATCH EXIST.

0.02

SHOULDER GUTTER DETAIL WITH SIDEWALK

4"

LBR 40

STABILIZATION

TYPE B

0.06

PAVEMENT

SHOULDER

5'

OPTIONAL BASE

3.5'

6"

4"

AT NO ADDITIONAL COMPENSATION

OF OPTIONAL BASE MATERIAL (GRANULAR ONLY)

THIS AREA MAY BE CONSTRUCTED

SHOULDER GUTTER

1:5 0.02

4'VARIES5'

CONC SWK

0.06

1:3

M A X

1'

1:3

(MAX.)

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/3

/2 c u s e rs

\p u b li c \m b ip w \5

\d m s \T

Y P

S R

D .d g n

:1

:3

A

M E d .M a c k e n z ie

32801 FLORIDA, ORLANDO

200 EAST ROBINSON STREET, SUITE 250

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

ENGINEER OF RECORD

DETAILS

TYPICAL SECTION

000EXIST.(+) 2.0EASTBOUND905+03.07

0.397.781.20(+) 2.0(+) 3.2EASTBOUND904+02.33

000EXIST.(+) 2.0WESTBOUND 597+68.21

0.378.181.02(-) 2.0(+) 3.0WESTBOUND 597+00.00

3.5223.12(-) 2.0(+) 2.9WESTBOUND 596+00.00

2.6813.284.86(-) 2.0(+) 6.6WESTBOUND 595+00.00

LANESTATION (SQ. FT.)

OVERBUILD

AREA OF

OVERBUILD (FT.)

WIDTH OF

OVERBUILD (IN.)

MAX. DEPTH* OF

SLOPE (%)

PROPOSED

EXIST. SLOPE LOCATION

OVERBUILD DETAILS

N

T S

590 591

S

T A

.1

P C

P T

S

T A

.3

A

.7

P O

A

.3

P T

¡ CONST. RIDGEMOOR BLVD.

STA. 583+44.69 TO STA. 597+68.21

¡ CONST. RIDGEMOOR BLVD.

MODLRD01

MODEL MANAGEMENT

REVISIONS

DATE DESCRIPTION

NO.

SHEET

ROAD NO. FINANCIAL PROJECT IDCOUNTY

/2

/2 c u s e r s \p u b li c \m b ip w \5

\d m s \P

L A

Y R

D .d g n

:4

:0

A

M E d .M a c k e n z ie

ORLANDO, FLORIDA 32801

200 EAST ROBINSON STREET, SUITE 250

MICHAEL BAKER INTERNATIONAL, INC

LICENSE NUMBER: 84217

TIMOTHY P. WINEBERG, P.E.

PINELLAS 445437-1-58-01

ENGINEER OF RECORD

T H

E O

F F

I C

I A

L R

E C

O R

D O

F T

H I S

S H

E E

T I

S T

H E

E L

E C

T R

O N

I C

F I L

E D

I G

I T

A L

L Y

S I G

N E

D A

N D

S E

A L

E D

U N

D E

R R

U L

E

G

.0

F

.A .C

40 45 50 55

70 75 85

40 50

40 50

70 80

N89°53'03"E

S62°06'57"E

N89°52'50"E

N69 °5

0'5 8"E

CURVE C1

CURVE C2 CURVE C3

SURVEY LINE

RIDGEMOOR BLVD

CURVE C1

PI STA 56+21.15

N=1369872.7677 E=434029.1836

¬=28°00'00" RT

D=03°57'54" T=360.28' L=706.16' R=1445.00'

PC STA 52+60.87

PT STA 59+67.03

CURVE C2

PI STA 68+77.67

N=1369278.3783 E=435152.5380

¬=28°00'13" LT

D=03°57'54" T=360.33' L=706.25' R=1445.00'

PC STA 65+17.34

PT STA 72+23.59

CURVE C3

PI STA 88+05.84

N=1369282.4255 E=437095.1039

¬=20°01'52" LT

D=01°59'57" T=506.15' L=1001.98' R=2866.00'

PC STA 82+99.68

PT STA 93+01.66

BOS P.O.T. STA 40+00.00

NO POINT FND OR SET

N=1369869.4935 E=432408.0352

PC STA 52+60.87

NO POINT FND OR SET

N=1369872.0401 E=433668.9053

PT STA 59+67.03

NO POINT FND OR SET

N=1369704.2698 E=434347.6321

PC STA 65+17.34

NO POINT FND OR SET

N=1369446.8968 E=434834.0478

PT STA 72+23.59

NO POINT FND OR SET

N=1369279.1293 E=435512.8629

PC STA 82+99.68

NO POINT FND OR SET

N=1369281.3705 E=436588.9505

PT STA 93+01.66

NO POINT FND OR SET

N=1369456.7893 E=437570.2772

EOS PC STA 98+56.76

NO POINT FND OR SET

N=1369648.0137 E=438091.4002

SECTION 27

SECTION 34 SECTION 35

SECTION 26

VERTICAL CONTROL

POINT

CONTROL

£ STATION OFFSET DESCRIPTION

NORTHING

(Y)

(X) EASTING

ELEVATION

(Z)

(N) LATITUDE

LONGITUDE

(W)

TBM1 60+82 93' LT SET NAIL AND DISK (NO ID) 1369733 434493 14.364 28°06'00.48" 82°41'15.30"

TBM2 69+55 88' LT SET NAIL AND DISK (NO ID) 1369390 435262 14.881 28°05'57.11" 82°41'06.69"

TBM3 73+75 0' LT SET NAIL AND DISK (NO ID) 1369280 435664 16.094 28°05'56.03" 82°41'02.20"

SECONDARY CONTROL

POINT

CONTROL

STATION

OFFSET DESCRIPTION

NORTHING

(Y)

(X) EASTING

ELEVATION

(Z)

(N) LATITUDE

LONGITUDE

(W)

A1 57+64.65 11.81' LT SET IRON ROD AND CAP 5/8" "TRAV PT LB 7831" 1369797.21 434166.73 14.27 28°06'01.07653" 82°41'18.94611"

A2 61+52.66 54.18' LT SET IRON ROD AND CAP 5/8" "TRAV PT LB 7831" 1369665.34 434537.04 15.92 28°05'59.79163" 82°41'14.80292"

A3 64+91.30 57.62' LT SET IRON ROD AND CAP 5/8" "TRAV PT LB 7831" 1369510.01 434837.98 17.96 28°05'58.27049" 82°41'11.43299"

KF1 66+59.81 11.61' LT FOUND NAIL AND DISK "TRAVERSE LB 7203" 1369397.33 434967.45 21.85 28°05'57.16199" 82°41'09.98022"

A4 67+43.54 12.50' LT SET IRON ROD AND CAP 5/8" "TRAV PT LB 7831" 1369368.98 435045.48 21.62 28°05'56.88565" 82°41'09.10715"

A5 70+85.09 4.40' RT SET IRON ROD AND CAP 5/8" "TRAV PT LB 7831" 1369281.10 435374.15 19.03 28°05'56.03386" 82°41'05.43187"

A6 73+63.64 11.14' LT SET IRON ROD AND CAP 5/8" "TRAV PT LB 7831" 1369290.56 435652.89 15.33 28°05'56.14310" 82°41'02.32012"

A7 75+79.88 57.25' RT SET IRON ROD AND CAP 5/8" "TRAV PT LB 7831" 1369222.62 435869.27 15.33 28°05'55.48246" 82°40'59.89987"

TBM1

KF1

TBM3

A7

A6

A5

A4

A3

A2

A1

TBM2

DATE

PROJECT CONTROL

R T

H

N T

S

PINELLAS COUNTY, FLORIDA

SECTIONS 26, 27, 34 & 35, TOWNSHIP 27 SOUTH, RANGE 16 EAST

PROJECT CONTROL

LEGEND

TRAV PT =

T =

STA =

RT =

R =

PT =

P.O.T. =

PI =

PC =

NTS =

NO. =

N =

LT =

LB =

L =

ID =

FND =

FDOT =

EOS =

E =

D =

BOS =

BLVD =

TRAVERSE POINT

TANGENT LENGTH

STATION

RIGHT

RADIUS

POINT OF TANGENCY

POINT ON TANGENT

POINT OF INTERSECTION

POINT OF CURVATURE

NOT TO SCALE

NUMBER

NORTHING COORDINATE

LEFT

LICENSED BUSINESS

CURVE LENGTH

IDENTIFICATION

FOUND

FLORIDA DEPARTMENT OF TRANSPORTATION

END OF SURVEY

EASTING COORDINATE

DEGREE OF CURVATURE

DELTA ANGLE

BEGINNING OF SURVEY

BOULEVARD

= SET NAIL & DISK (STAMPED AS NOTED)

= SET 5/8" IRON ROD AND CAP (STAMPED AS NOTED)

6. FIELD BOOK REFERENCES : FIELD BOOK 0038726.

5. PROJECT UNITS : US FEET

4. LAST DATE OF SURVEY : 06/15/2023

RECORDS OF PINELLAS COUNTY, FLORIDA.

3. THE ALIGNMENT SHOWN HEREON IS BASED ON OFFICIAL RECORDS BOOK 5938, PAGE 2153, LOCATED IN THE PUBLIC

3357 SFN 1716.

COUNTY, FLORIDA BENCHMARKS DESIGNATED "102" AND "113" AS SHOWN ON PINELLAS COUNTY PUBLIC WORKS UNIQUE ID

2. ELEVATIONS ARE BASED ON THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 88) AS ESTABLISHED FROM PINELLAS

TRANSPORTATION (FDOT) FLORIDA PERMANENT REFERENCE NETWORK (FPRN).

OF 1983, 2011 ADJUSTMENT (NAD 83/2011) AS ESTABLISHED FROM TIES TO THE FLORIDA DEPARTMENT OF

1. PROJECT IS BASED ON THE FLORIDA STATE PLANE COORDINATE SYSTEM, WEST ZONE, OF THE NORTH AMERICAN DATUM

GENERAL NOTES

DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

ROAD NO. FINANCIAL PROJECT IDCOUNTY

445437-1-58-01PINELLAS

ORLANDO, FLORIDA 32801

200 EAST ROBINSON STREET, SUITE 250

MICHAEL BAKER INTERNATIONAL, INC.

LICENSE NUMBER: 84217

TIMOTHY P. WINEBERG, P.E.

ENGINEER OF RECORD

T H

E O

F F

I C

I A

L R

E C

O R

D O

F T

H I S

S H

E E

T I

S T

H E

E L

E C

T R

O N

I C

F I L

E D

I G

I T

A L

L Y

S I G

N E

D A

N D

S E

A L

E D

U N

D E

R R

U L

E

G

.0

F

.A .C

:1

:2

A M c u s e r s \p u b li c \m b ip w \5

\d m s \C

T L

S R

D .d g n

E d

.M a c k e n z ie

/2

/2

DATE DESCRIPTION

NO.

SHEET

/2 c u s e r s \p u b li c \m b ip w \5

\d m s \G

N N

T R

D .d g n

:1

:3

A M

E d

.M a c k e n z ie

32801 FLORIDA, ORLANDO

200 EAST ROBINSON STREET, SUITE 250

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

GENERAL NOTES

PINELLAS COUNTY UTILITIES

MCI

FRONTIER

DUKE ENERGY-TRANSMISSION

DUKE ENERGY-DISTRIBUTION

CLEARWATER GAS

MR. KELLY O'BRIEN

MR. MICHAEL KROL

MR. CHRISTOPHER (SCOTT) HAND

MR. SCOTT VANVELZOR

MR. BILL RULAND

MS. JANCINTA CORCOBA

727-464-5492

813-410-8403

727-313-6167

813-909-1241

727-820-4641

727-562-4900

AND VEHICLES WITHIN THE DRIPLINE OF TREES IS PROHIBITED.

EXISTING TREES TO REMAIN SHALL NOT BE DISTURBED, AND ANY STORAGE OF MATERIALS OR PARKING OF WORK TRUCKS 6.

ALL PROPOSED DRAINAGE PIPES ARE TO BE RCP PER PINELLAS COUNTY STORMWATER MANUAL (2.2.6.7.A).5.

THERE WILL BE NO PILE DRIVING OPERATIONS DURING ANY NIGHTTIME CONSTRUCTION.4.

GENERAL NOTES

1. ALL SURVEY INFORMATION WAS OBTAINED FROM A LICENSED FLORIDA PROFESSIONAL SURVEYOR AND MAPPER AND UTILIZED AS

SUPPORTING DATA IN THE PRODUCTION OF DESIGN PLANS AND FOR CONSTRUCTION ON SUBJECT PROJECT.

THE PROFESSIONAL SURVEYOR AND MAPPER OF RECORD IS:

PETER J. MATTSON, P.S.M.

P.S.M. NO: 6290

ELEMENT ENGINEERING GROUP, LLC

8509 BENJAMIN RD., SUITE E

TAMPA, FLORIDA 33634

CERTIFICATE OF AUTHORIZATION: LB 7831

2. THE LOCATION(S) OF THE UTILITIES SHOWN IN THE PLANS (INCLUDING THOSE DESIGNATED VV, VH AND VVH) ARE BASED ON LIMITED

INVESTIGATION TECHNIQUES AND SHOULD BE CONSIDERED APPROXIMATE ONLY. THE VERIFIED LOCATIONS/ELEVATIONS APPLY ONLY

AT THE POINTS SHOWN. INTERPOLATIONS BETWEEN THESE POINTS HAVE NOT BEEN VERIFIED.

3. UTILITY/AGENCY OWNERS FOR THIS PROJECT INCLUDE:

COMPANY CONTACT TELEPHONE NUMBERS

ELEMENT ENGINEERING GROUP, LLC

SUE:

8509 BENJAMIN RD., SUITE E

TAMPA, FLORIDA 33634

LICENSED BUSINESS NP. 7831

EDWARD P. CONNOLLY, PSM 6911

TH13

TH12

TH11

TH14

4'

4'

3'

5'

4'

4'

4'

4'

4'

5'

4'

4'

3'

5'

TH1

TH15

WATER

P T

S

T A

.0

¡ CONST. RIDGEMOOR BLVD.

5' PAVED SHLDR.

SHLDR. GUTTER

£ SURVEY RIDGEMOOR BLVD.

RIDGEMOOR BLVD.

2.03' RT.

+44.69

31.13' RT.

RIDGEMOOR BLVD.

STA 57+95.63 £ SURVEY

RIDGEMOOR BLVD. =

¡ CONST.579+95.28STA.

STA. 583+44.69, RT.

BEGIN RECONSTRUCTION

END MILLING AND RESURFACING

15.69' RT.

+44.69

3' UNPAVED SHLDR.

5' PAVED SHLDR.

3' UNPAVED SHLDR.

, LT.584+81.33STA.

BEGIN RECONSTRUCTION

END MILLING AND RESURFACING

STA. 585+37.52

BEGIN SHLDR. GUTTER

SAWCUT

STA. 581+20.00

RESURFACING

BEGIN MILLING AND

BEGIN CONSTRUCTION

1" = 5' Vertical

1" = 50' Horizontal

SCALE

10 10

15 15

20 20

25 25

579 580580 581 582 583 584 585

EXISTING GROUND LINE

PROFILE GRADE LINE

EL. 16.32±

STA. 583+44.69 RT.

BEGIN RECONSTRUCTION

DPI EL. 12.41'

STA. 584+00.00

BEGIN DITCH (LT) DPI EL. 12.33'

STA. 585+50.00

END DITCH (LT)

DPI EL. 12.27'

STA. 585+45.17

SE TRANSITION 75'

FROM NC TO RC

B E

G

IN

S E

T R

A N

S

IT

IO

N

E N

D S

E T

R A

N S

IT

IO

N

S T

A

.6

RC

(+)0.780%

DPI EL. 12.31'

STA. 585+00.00

STA. 581+20.00

BEGIN CONSTRUCTION

.7

.8

.9

.1

(+)0.781%

.3

E

L

.3

V

P C

198.37K =

VC135

.9

E

L

.8

V

I

.5

.7

.3

E

L

.6

S

T A

.0

EL. 17.39±

STA. 584+81.33 LT.

BEGIN RECONSTRUCTION

DATE DESCRIPTION

NO.

SHEET

445437-1-52-01

/2 c u s e r s \p u b li c \m b ip w \5

\d m s \P

L P

R R

D N

E W

.d g n

:1

:3

P

M E d .M a c k e n z ie

32801 FLORIDA, ORLANDO

200 EAST ROBINSON STREET, SUITE 250

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

ROADWAY PLAN-PROFILES

Feet

0 10

N

ST-1

FL 14.23' (N)

15" HDPE

GUTTER INLET

ST-2

FL 9.19' (N)

18" CMP

FL 9.52' (S)

15" HDPE

CATCH BASIN

WARNING: GAS MAIN AT AREAS OF CONSTRUCTION

MILLING AND RESURFACING LIMITS

RECONSTRUCTION LIMITS

DITCH PAVEMENT

4" REINFORCED CONC.

Preview Test

EXISTING INLET TO BE REMOVED

21' OF 18" PIPE

EXISTING PIPE TO BE REMOVED

S-2

EXISTING INLET TO BE REMOVED

CONCRETE JACKET

7' OF 18" PIPE

ST-1

ST-2

REMAIN

AND TO

DESILTED

PIPE TO BE

EXISTING

1.5' IN WIDTH AROUND THE INLET

CONST. 4" REINFORCED CONC. DITCH PAVEMENT

TH11

TH12

TH13

TH14

TH15

TH1

(-)0.100%

(+)1.2 42%

(-)0.089%

59 60

S62°6'57"E

P T

S

T A

.3

P T

S

T A

.0

P

T

S

T A

.0

581 582

S62°15'56"E

R/W LINE

R/W LINE

12.00' RT.

+81.33 e = NC

PT STATION = 582+18.37

PC STATION = 579+95.28

R = 2083.000

L = 223.089'

T = 111.651

D = 2.751°

¬ = 6.136° (RT)

PI STATION = 581+06.93

CURVE DATA

RT. PAVED SHLDR.

-0.05 TO 0.02

3'

4'

4'

5'

4'

5'

4'

4'

4'

3'

5'

EOI

TH9

TH10

TH21

TH22

TH19

TH18

TH17 TH16

TH20

TH23

TH4

TH2

TH3

TH5

TH7

TH6TH8

P C

S

T A

.3

BACK F

LOW

WATER

U

WATER

U

WATER

U

R/W LINE

R/W LINE

RIDGEMOOR BLVD.

¡ CONST.

5' PAVED SHLDR.

5' PAVED SHLDR.

5' PAVED SHLDR.

SHLDR. GUTTER

3' UNPAVED SHLDR.

SHLDR. GUTTER

SHLDR.

8' UNPAVED

RIDGEMOOR BLVD.

C R

E E

K

B R

O O

K E

R

12.00' LT.

587+62.86STA.

END SHLDR. GUTTER

END 5' PAVED SHLDR.

� CONST. PGL RT.

MISC. ASPHALT PAVT.

6' PAVED SHLDR.

STA. 590+54.92, 21.96' LT.

APPROACH TERMINAL

TL-2 PARALLEL

END GUARDRAIL

41.72' LT.

+50.77

5' CONC. SWK.

12.00' RT.

+64.38STA. 587

END 6' PAVED SHLDR.

43.78' LT.

+55.95

P.C. STA. 900+00.00

12.00' LT.

+90.00

BRIDGE No. 154572

MISC. ASPHALT PAVT.

STA. 592+38.44

END SHLDR. GUTTER

+40.42

17.00' LT.

18.00' LT.

+62.42

SHLDR.

5' PAVED

SHLDR.

3' UNPAVED

24.50' RT.

+29.60

STA. 586+38.96, 21.97' RT.

APPROACH TERMINAL

TL-2 PARALLEL

BEGIN GUARDRAIL

22.00' RT.

+87.53

24.50' RT.

+87.61

17.00' RT.

STA. 586+29.60

BEGIN 6' PAVED SHLDR.

END 5' PAVED SHLDR.

END 3' UNPAVED SHLDR.

22.50' RT.

+17.61

20.00' RT.

+17.53

STA. 587+65.47, 20.00' RT.

(PER STD. PLANS 536-001)

APPROACH TRANS.

CONST. TL-2

END GUARDRAIL

22.50' RT.

+65.03

STA. 589+58.28, 20.00' LT.

(PER STD. PLANS 536-001)

CONST. TL-2 APPROACH TRANS.

BEGIN GUARDRAIL WITH PIPERAIL

£ SURVEY RIDGEMOOR BLVD.

20.00' RT.

+56.56

12.00' RT.

STA. 589+57.01

BEGIN 3' UNPAVED SHLDR.

BEGIN 5' PAVED SHLDR.

5' CONC. SWK.

22.00' LT.

+16.73

24.50' LT.

+16.64

17.00' RT.

+01.25

STA. 589+58.41, 18.42' LT.

BEGIN SHLDR. GUTTER

STA. 589+58.41, 12.00' LT.

BEGIN PAVED SHLDR.

17.00' LT.

+86.73

+86.73, 20.00' LT.

+77.28, 18.42' LT.

22.19' LT.

+63.14

1" = 5' Vertical

1" = 50' Horizontal

SCALE

10 10

15 15

20 20

25 25

586 587 588 589 590 591 592

EXISTING GROUND LINE EXISTING GROUND LINE

PROFILE GRADE LINE

EXISTING GROUND LINE

RC

(+)1.46 1%

STA. 589+27.67

END BRIDGE

END PROJECT

STA. 587+93.67

BEGIN BRIDGE

BEGIN PROJECT

(SEE SHEET 13)

PGL RT., ELEV. 20.04'

STA. 900+00.00 � CONST.

RIDGEMOOR BLVD. =

STA. 590+85.00 � CONST.

PGL (LT.)

+1.461 % -1.099%

(-)1.099%

.6

E

L

.1

V

.3

E

L

.0

V

.9

E

L

.3

V

61.00K =

VC156

198.37K =

VC135

.4

E

L

.0

V

P I

.0

.3

.6

.5

.8

.9

.0

.9

.7

DATE DESCRIPTION

NO.

SHEET

/2 c u s e rs

\p u b li c \m b ip w \5

\d m s \P

L P

R R

D N

E W

.d g n

:0

:5

P

M E d .M a c k e n z ie

32801 FLORIDA, ORLANDO

200 EAST ROBINSON STREET, SUITE 250

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

Feet

0 10

ST-5

FL 12.40' (N)

18" RCP

GUTTER INLET

ST-6

FL 10.71' (S)

FL 10.71' (N)

18" RCP

CATCH BASIN

DITCH PAVEMENT

4" REINFORCED CONC.

RIP RAP

Preview Test S-3

EXISTING INLET TO BE REMOVED

S-4

EXISTING PIPE TO BE REMOVED

TO BE REMOVED

EXISTING INLET

29' OF 18" PIPE

CONCRETE JACKET

7' OF 18" PIPE

ST-5

ST-6

DESILTED AND TO REMAIN

EXISTING PIPE TO BE

PAVEMENT 1.5' IN WIDTH AROUND THE INLET

CONST. 4" REINFORCED CONC. DITCH

TH19

TH18

TH20

TH16

TH17

TH10TH9

TH7

TH6

TH8

TH23

TH22

TH21

TH4TH5

TH2

TH3

67 68

S62°6'57"E

P C

S

T A

.3

P

C

S

T A

.3

589 590

.1

S

T A

P C

STA. 589+57.71

END APPROACH SLAB

587+93.67 STA.

BEGIN BRIDGE No. 154572

END APPROACH SLAB

BEGIN PROJECT

STA. 589+27.67

BEGIN APPROACH SLAB

END BRIDGE No. 154572

END PROJECT

12.92' LT.

STA. 592+38.65

BEGIN 8' UNPAVED SHLDR.

END 5' PAVED SHLDR.

STA. 900+00.00 � CONST. PGL RT.

STA. 590+85.00 � CONST. RIDGEMOOR BLVD. =

STA. 587+63.63

BEGIN APPROACH SLAB

49.45' LT.

+96.56

27.33' LT.

+97.54

48.74' LT.

+75.9558.79' LT.

+75.36

61.06' LT.

+62.02

26.31' LT.

+61.93

60.07' LT.

+54.51

27.42' LT.

+56.61

27.34' LT.

+22.91

45.06' LT.

+23.5743.87' LT.

+44.89

52.46' LT.

+45.33

48.31' LT.

+58.92

26.33' LT.

+59.28

51.43' LT.

+65.65

27.92' LT.

+64.53

EL. 14.28'

(50YR24HR)EL. 14.83'

(100YR24HR)

EL. 15.75'

(500YR24HR)

e = RC

PT STATION = 594+95.37

PC STATION = 587+08.11

R = 1600.000 L = 787.265' T = 401.771 D = 3.581°

¬ = 28.192° (RT)

PI STATION = 591+09.88

CURVE DATA CURVE DATA

PI STA. = 903+62.81

¬ = 14°20'39" (LT)

D = 01°59'14" T = 362.81 L = 721.83 R = 2,883.26

PC STA. = 900+00.00

PT STA. = 907+21.83

e = RC

WARNING: GAS MAIN AT AREAS OF CONSTRUCTION

*REINFORCE WITH 6"X6" w2.5Xw2.5 MIN. WELDED WIRE REINFORCEMENT IN THE MIDDLE OF THE SLAB

3'

4'

3'

2'

2'

4'

4'

4'

3'

5'

P T

S

T A

.5

WATER

WATERWATER

SD

U

R/W LINE

R/W LINE

¡ CONST. RIDGEMOOR BLVD.

10' UNPAVED SHLDR.

3' UNPAVED SHLDR.

£ SURVEY RIDGEMOOR BLVD.

RIDGEMOOR BLVD.

24.00' RT.

903+50.00STA.

22.45' LT.

597+02.47STA.

� CONST. PGL RT.

5' PAVED SHLDR.

.2

'R

STA. 904+02.33 RT.

BEGIN OVERBUILD

BEGIN MILLING AND RESURFACING

END RECONSTRUCTION

8' UNPAVED SHLDR.

, 26.82' LT.595+00.00STA.

BEGIN 10' UNPAVED SHLDR.

END 8' UNPAVED SHLDR.

40.39' RT.

RIDGEMOOR BLVD.

� CONST. PGL RT.

STA. 598+95.96

RIDGEMOOR BLVD. =

� CONST.908+14.19STA.

END OVERBUILD

MATCH EXISTING CROSS SLOPE

STA. 905+03.07, RT.

STA. 597+68.21, LT.

MATCH EXISTING CROSS SLOPE

END OVERBUILD

RIDGEMOOR BLVD.

STA. 72+76.36 � SURVEY

RIDGEMOOR BLVD. =

� CONST. PGL RT.

903+82.16STA.

STA. 73+11.82 � SURVEY RIDGEMOOR BLVD.

STA. 595+00.00 � CONST. RIDGEMOOR BLVD.

BEGIN OVERBUILD, LT.

BEGIN MILLING AND RESURFACING

END RECONSTRUCTION

END MILLING AND RESURFACING

24.00' RT.

STA. 904+02.33

END 5' PAVED SHLDR.

END 3' UNPAVED SHLDR.

6.74' LT.

904+76.82STA.

R

0.00' RT.

904+88.35STA.

TYPE F

CURB AND GUTTER

0.00' RT.

905+03.07STA.

1" = 5' Vertical

1" = 50' Horizontal

SCALE10 10

15 15

20 20

25 25

593 594 595 596

EXISTING GROUND LINE

597 598

RC

PGL (LT.)

-1.099% +0.482%

(-)1.099%

(+)0.482%

.3

E

L

.2

V

.6

E

L

.2

V

142.31K =

VC225

.1

E

L

.7

V

P I

.3

.0

.8

.7

.6

.5

.5

.5

.5

.2

E

L

.2

S T

A

DATE DESCRIPTION

NO.

SHEET

/2 c u s e rs

\p u b li c \m b ip w \5

\d m s \P

L P

R R

D N

E W

.d g n

:0

:0

P

M E d .M a c k e n z ie

32801 FLORIDA, ORLANDO

200 EAST ROBINSON STREET, SUITE 250

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

Feet

0 10

ST-3

FL 10.83' (N)

FL 10.66' (S)

24" RCP

WITH MANHOLE

CURB INLET

ST-4

FL 10.33' (N)

FL 10.35' (S)

24" RCP

CATCH BASIN

FL 10.92'

24" RCP

MES

FL 10.74'

24" RCP

MES

FL 10.77'

24" RCP

MES

ST-7

ST-8

ST-9

RESURFACING LIMITS)

3 FOR MILLING &

(SEE TYPICAL SECTION

STA. 84+30.00, LT.

END CONSTRUCTION

RESURFACING

END MILLING AND

ST-4

EXISTING PIPE TO REMAIN

EXISTING STRUCTURES TO REMAIN

EXISTING PIPE TO REMAIN

STRUCTURE TO REMAIN

EXISTING

STRUCTURE TO REMAIN

EXISTING PIPES AND

ST-3

ST-7

ST-8

ST-9

TOP IN KIND

REPLACE INLET

71 72 73 74 75 76 77

N89°52'50"E

P T

S

T A

.5

P

T

S

T A

.5

906 907 908

A

.8

P

T

N89°54'43"E

594 595 596 597 598 599

A

.3

P

T

.7

S

T A

P O T

N89°32'33"E S89°51'26"E

STA. 595+00.00, LT.

BEGIN OVERBUILD

END RECONSTRUCTION

EL. 16.27±

STA. 597+68.21, LT.

END OVERBUILD

e = RC

PT STATION = 594+95.37

PC STATION = 587+08.11

R = 1600.000 L = 787.265' T = 401.771 D = 3.581°

¬ = 28.192° (RT)

PI STATION = 591+09.88

CURVE DATA CURVE DATA

PI STA. = 903+62.81

¬ = 14°20'39"(LT)

D = 01°59'14" T = 362.81 L = 721.83 R = 2,883.26

PC STA. = 900+00.00

PT STA. = 907+21.83

e = RC

WARNING: GAS MAIN AT AREAS OF CONSTRUCTION

OVERBUILD LIMITS

MILLING AND RESURFACING LIMITS

RECONSTRUCTION LIMITS

1" = 5' Vertical

1" = 50' Horizontal

SCALE

-5 -5

0 0

5 5

10 10

25 25

30 30

35 35

900 901 902 903 904 905 906

STA. 904+02.33

BEGIN OVERBUILD

END RECONSTRUCTION

EL. 16.11±

STA. 905+03.07

END OVERBUILD

(-)0.985%

(-)0.781%

(-)0.600%

.7

E

L

.0

S

T A

.9

E

L

.0

S

T A

EL. 20.04

STA. 900+00.00

BEGIN PROFILE

PGL RT. RIDGEMOOR BLVD.

ALONG � CONST. PGL RT.

EXISTING GROUND LINE

1" = 5' Vertical

1" = 50' Horizontal

SCALE

-5 -5

0 0

5 5

10 10

25 25

30 30

35 35

900 901 902 903 904 905 906

STA. 904+02.33

BEGIN OVERBUILD

END RECONSTRUCTION

EL. 16.11±

STA. 905+03.07

END OVERBUILD

(-)0.985%

(-)0.781%

(-)0.600%

.7

E

L

.0

S T

A

.9

E

L

.0

S T

A

EL. 20.04

STA. 900+00.00

BEGIN PROFILE

PGL RT. RIDGEMOOR BLVD.

ALONG � CONST. PGL RT.

EXISTING GROUND LINE

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

32801 FLORIDA, ORLANDO

200 EAST ROBINSON STREET, SUITE 250

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

ROADWAY PROFILE

PGL_RT1 - PROFILE 1 [SHEET] : c:\users\public\mbipw\5\dms22332\PROFRD01.dgn

10:59:27 AM3/2/2026Ed.Mackenzie

� CONST. PGL (RT.)

585+45.17STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

FL 14.5' (LT)

GUTTER ELEV. 17.07'

17.44'EOP ELEV.

INDEX 425-010, 425-040

CONST. GUTTER INLET TYPE S

(18.79' LT)585+45.17STA.

S-1

S-1

¡ CONST. RIDGEMOOR BLVD.

18" PIPE

EXISTING 18" PIPE

FL 9.2' (LT)

FL 9.2' (RT)

12.27'TOP OF GRATE ELEV.

INDEX 425-010, 425-052

CONST. DBI TYPE D

(43.44' LT)585+45.17STA.

S-2

S-2

CONST. CONC. JACKET (INDEX 430-001)

18" PIPE

:2

1:

E L

.2

.6

L T

.0

L T

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

� SURVEY RIDGEMOOR BLVD.

GM

BE BFOC

CONDUIT

(� SURVEY RIDGEMOOR BLVD)

1" PVC BT/FOC Vvh #11 @ 63+42.11

(� SURVEY RIDGEMOOR BLVD)

2" DB & 4" PVC BT/FOC Vvh #11 @ 63+42.11

(� SURVEY RIDGEMOOR BLVD)

(2)-4" PVC FOC Vvh #12 @ 63+42.25

(� SURVEY RIDGEMOOR BLVD)

(3)-1.50" DB BE Vvh #14 @ 63+41.58

(� SURVEY RIDGEMOOR BLVD)

12" PVC WATER Vvh #15 @ 63+42.06

TO REMAIN

TO BE RELOCATED

STA. 592+30.74

1" = 10' Vertical 1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

FL 10.7' (LT)

FL 10.7' (RT)

49" SLOT ELEV. 12.88' (AH, BK)

13.88'TOP OF GRATE ELEV.

INDEX 425-010, 425-052

CONST. DBI TYPE D

(52.73' LT)592+30.74STA.

S-4

FL 14.0' (LT)

GUTTER ELEV. 17.53'

17.90'EOP ELEV.

INDEX 425-010, 425-040

CONST. GUTTER INLET TYPE S

(19.56' LT)592+30.74STA.

S-3

S-3

S-4

EXISTING 18" PIPE

¡ CONST. RIDGEMOOR BLVD.

18" PIPE

CONST. CONC. JACKET (INDEX 430-001)

18" PIPE

1:4

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

� SURVEY RIDGEMOOR BLVD.

GM

BEBFOC

CONDUIT

(� SURVEY RIDGEMOOR BLVD)

12" PVC WATER Vvh #3 @ 70+40.06

(� SURVEY RIDGEMOOR BLVD)

(3)-2" PVC BE Vvh #2 @ 70+40.40

(� SURVEY RIDGEMOOR BLVD)

(2)-4" PVC FOC Vvh #4 @ 70+37.11

(� SURVEY RIDGEMOOR BLVD)

2" DB BT & 4" PVC BT/FOC Vvh #5 @ 70+37.14

TO BE RELOCATED

TO REMAIN

TO BE RELOCATED

TO BE RELOCATED

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

MICHAEL BAKER INTERNATIONAL, INC.

56982LICENSE NUMBER:

PAUL Q. SNEAD, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

DRAINAGE STRUCTURES

CL_CONST-1 - 585+45.17 [SHEET] : c:\users\public\mbipw\5\dms22307\DRXSRD01.dgn

1:56:06 PM3/30/2026Ed.Mackenzie

583+00.00STA.

1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

WM

BFOCBT

GM

BE

BE

BE

BE

� CONST. RIDGEMOOR BLVD. � RIDGEMOOR BLVD.

ECON

583+50.00STA.

1" = 10' Vertical 1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

2.00% 5.02%1:6

WM BFOC

BT GM

BE BEBE BE

� CONST. RIDGEMOOR BLVD. � RIDGEMOOR BLVD.

SAWCUT

.3

E L

ECON

584+00.00STA.

1" = 10' Vertical 1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

0.95% 5.02%

1:6

WM BFOC

BT GM

BEBE BE

� CONST. RIDGEMOOR BLVD. � RIDGEMOOR BLVD.

SAWCUT

.7

E L

.7

L T

.3

L T

1:6

E L .4

ECON

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

ROADWAY CROSS SECTIONS

CL_CONST-2 - 583+00.00 [SHEET] : c:\users\public\mbipw\5\dms22332\RDXSRD01.dgn

9:38:39 AM4/9/2026Patrick.Siu

BEGIN RECONSTRUCTION STA. 583+44.69 RT.

584+50.00STA.

1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

2.00% 5.02%

WM

BFOC

BT GM

BE BEBE BE

� CONST. RIDGEMOOR BLVD. � RIDGEMOOR BLVD.

SAWCUT

.1

E L

.1

L T

.6

L T

E L .3

' ECON

1:6

1:6

585+00.00STA.

1" = 10' Vertical 1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

1:6

6.00% 2.00% 2.00% 5.00%

WM

BFOC

BT

GMBE

BE

BE

BE

� CONST. RIDGEMOOR BLVD. � RIDGEMOOR BLVD.

.5

E L

.4

L T

.4

L T

E L .3

ECON

1:6

1:6

585+50.00STA.

1" = 10' Vertical 1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

1:

1:4 6.00% 2.00% 2.00% 5.00%

WM

BFOC

BT

GM

BE

BE

BE

BE

� CONST. RIDGEMOOR BLVD. � RIDGEMOOR BLVD.

.0

E L

.3

L T

.0

L T

.3

E L

ECON

1:66.00%

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

CL_CONST-2 - 584+50.00 [SHEET] : c:\users\public\mbipw\5\dms22332\RDXSRD01.dgn

9:38:42 AM4/9/2026Patrick.Siu

19.62' RT.

STA. 585+74.44

SHW

E X

IS

T

W E

T L A

N D

S

BEGIN RECONSTRUCTION STA. 584+81.33 LT.

586+00.00STA.

1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

1:6

6.00% 2.00% 2.00% 5.00%

WM

BFOC

BT

GMBE

BE

BE

BE

� CONST. RIDGEMOOR BLVD. � RIDGEMOOR BLVD.

.6

E L

ECON

6.00%

586+50.00STA.

1" = 10' Vertical 1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

30 30

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

1:5

6.00% 2.00% 2.00% 5.00% 1:3¡

WM

BFOC

BT

GMBE

BE

BE

BE

� CONST. RIDGEMOOR BLVD. � RIDGEMOOR BLVD.

.3

E L

ECON

6.00%

587+00.00STA.

1" = 10' Vertical 1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

30 30

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

1:5

2.00% 1:4

6.00% 2.00% 2.00% 5.00% 1:3¡

WM

BFOC

BT

GMBE

BE

BE

BE

� CONST. RIDGEMOOR BLVD. � RIDGEMOOR BLVD.

.1

E L

ECON

6.00%

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

CL_CONST-2 - 586+00.00 [SHEET] : c:\users\public\mbipw\5\dms22332\RDXSRD01.dgn

9:38:44 AM4/9/2026Patrick.Siu

19.95' RT.

STA. 586+71.30

SHW

E X

IS

T

W E

T L A

N D

S

E X

IS

T

W E

T L A

N D

S

E X

IS

T

W E

T L A

N D

S

E X

IS

T

W E

T L A

N D

S

E X

IS

T

W E

T L A

N D

S

E X

IS

T

W E

T L A

N D

S

587+50.00STA.

1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

30 30

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

1:5

2.00% 2.00%

BFOC

BT

GM

BE

BEBE

� CONST. RIDGEMOOR BLVD. � RIDGEMOOR BLVD.

.8

E L

ECON

1:3 5.00%

6.00%2.00%

588+00.00STA.

1" = 10' Vertical 1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

30 30

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

BFOC

BT

GMBE

BE

BE

BE

� CONST. RIDGEMOOR BLVD. � RIDGEMOOR BLVD.

.5

E L

2.00% 2.00%

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

CL_CONST-2 - 587+50.00 [SHEET] : c:\users\public\mbipw\5\dms22332\RDXSRD01.dgn

9:38:46 AM4/9/2026Patrick.Siu

23.17' RT.

STA. 587+73.69

SHW

E X

IS

T

W E

T L A

N D

S

E X

IS

T

W E

T L A

N D

S

E X

IS

T

W E

T L A

N D

S

E X

IS

T

W E

T L A

N D

S

588+50.00STA.

1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

0 0

10 10

20 20

30 30

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

BFOC

GMBE

BE

BE

BE

� CONST. RIDGEMOOR BLVD. � RIDGEMOOR BLVD.

.9

E L

2.00% 2.00%

589+00.00STA.

1" = 10' Vertical 1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

30 30

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

BFOC GM BEBE BEBE

� CONST. RIDGEMOOR BLVD. � RIDGEMOOR BLVD.

.9

E L

2.00% 2.00%

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

CL_CONST-2 - 588+50.00 [SHEET] : c:\users\public\mbipw\5\dms22332\RDXSRD01.dgn

9:38:48 AM4/9/2026Patrick.Siu

589+50.00STA.

1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

30 30

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

WM

BFOC

GM

BE

BE

BE

BE

� CONST. RIDGEMOOR BLVD. � RIDGEMOOR BLVD.

.5

E L

2.00% 2.00%

1:3

1:

590+00.00STA.

1" = 10' Vertical 1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

30 30

E X

IS

T

IN

G

R /W

L

IN

E

1:

1:

2.00% 2.00% 5.00%

WM

BFOC

BT

GMBE

BE

BE

BE

� CONST. RIDGEMOOR BLVD. � RIDGEMOOR BLVD.

.9

E L

ECON

6.00%

2.00%

6.00% 1:6

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

CL_CONST-2 - 589+50.00 [SHEET] : c:\users\public\mbipw\5\dms22332\RDXSRD01.dgn

9:38:49 AM4/9/2026Patrick.Siu

23.92' RT

STA. 589+47.23

SHW

E X

IS

T

W E

T L A

N D

S

E X

IS

T

W E

T L A

N D

S

E X

IS

T

W E

T L A

N D

S

E X

IS

T

W E

T L A

N D

S

590+50.00STA.

1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

30 30

E X

IS

T

IN

G

R /W

L

IN

E

1:

6.00% 2.00% 2.00% 5.00%

WM

BFOC

BT

GMBE

BE

BE

BE

� CONST. RIDGEMOOR BLVD. � RIDGEMOOR BLVD.

.4

E L

ECON

ECON

2.00%

6.00%

1:

1:6

591+00.00STA.

1" = 10' Vertical 1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

30 30

E X

IS

T

IN

G

R /W

L

IN

E 1:5

6.00% 2.00% 2.00%

WM

BFOC

BT

GM

BE

BE

BE

BE

� CONST. RIDGEMOOR BLVD. � RIDGEMOOR BLVD.

.8

E L

.9

E L

ECON

ECON

6.00% 5.00% 1:6

� PGL RT.

591+50.00STA.

1" = 10' Vertical 1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

30 30

E X

IS

T

IN

G

R /W

L

IN

E

1:6 6.00% 2.00% 1.98%

WM

BFOC

BT

GMBE

BE

BE

BE

� CONST. RIDGEMOOR BLVD.

� RIDGEMOOR BLVD.

.3

E L . 1

.4

E L

ECON

ECON

6.00% 5.00% 1:6

� PGL RT.

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

CL_CONST-2 - 590+50.00 [SHEET] : c:\users\public\mbipw\5\dms22332\RDXSRD01.dgn

9:38:51 AM4/9/2026Patrick.Siu

23.48' RT

STA. 590+43.29

SHW

22.08' RT

STA. 591+43.47

SHW

E X

IS

T

W E

T L A

N D

S

E X

IS

T

W E

T L A

N D

S

E X

IS

T

W E

T L A

N D

S

E X

IS

T

W E

T L A

N D

S E

X

IS

T W

E T

L A

N D

S

E X

IS

T

W E

T L A

N D

S

592+00.00STA.

1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

1:6

5.97% 2.00% 1.97% 1:6

WM

BFOC

BT

GM

BE

BE

BE

BE

� CONST. RIDGEMOOR BLVD.

� RIDGEMOOR BLVD.

.7

E L . 1

.9

E L

ECON

ECON

7.03% 2.00%

� PGL RT.

592+50.00STA.

1" = 10' Vertical 1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

1:6

6.00% 2.00% 1.96% 1:66.59%

WM

BFOC

BT

GM

BE

BE

BE

BE

� CONST. RIDGEMOOR BLVD.

� RIDGEMOOR BLVD.

.2

E L

.4

E L

ECON

ECON

2.00%

� PGL RT.

593+00.00STA.

1" = 10' Vertical 1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

1:6

6.00% 2.00% 1.95% 1:66.30%

WM

BFOC

BT

GM

BE

BE

BE

BE

� CONST. RIDGEMOOR BLVD.

� RIDGEMOOR BLVD.

.6

E L . 1

.0

E L

ECON

ECON

2.00%

� PGL RT.

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

CL_CONST-2 - 592+00.00 [SHEET] : c:\users\public\mbipw\5\dms22332\RDXSRD01.dgn

9:38:53 AM4/9/2026Patrick.Siu

28.28' RT.

STA. 592+41.79

SHW

E X

IS

T

W E

T L A

N D

S

593+50.00STA.

1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

1:6

6.00% 2.00% 1.94%

5.73%

WM

BFOC

BT

GMBE

BE

BE

BE

� CONST. RIDGEMOOR BLVD.

� RIDGEMOOR BLVD.

.1

E L

.7

E L

ECON

ECON

2.00% 1:6

� PGL RT.

594+00.00STA.

1" = 10' Vertical 1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

1:6 6.00% 2.00%

1.92% 5.17%

WM

BFOC

BT GMBE

BE

BE

BE

� CONST. RIDGEMOOR BLVD.

� RIDGEMOOR BLVD.

.5

E L

.3

E L

ECON

ECON

2.00% 1:6

� PGL RT.

594+50.00STA.

1" = 10' Vertical 1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

1:6 6.00% 2.00%

1.93% 1:64.51%

WM

BFOC

BT GMBE

BE

BE

BE

� CONST. RIDGEMOOR BLVD.

� RIDGEMOOR BLVD.

.0

E L

.9

E L

ECON

ECON

2.00%

� PGL RT.

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

CL_CONST-2 - 593+50.00 [SHEET] : c:\users\public\mbipw\5\dms22332\RDXSRD01.dgn

9:38:55 AM4/9/2026Patrick.Siu

END RECONSTRUCTION STA. 595+00.00 LT.

1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

1:6 6.00% 2.00%

1.92% 3.69%

WM

BFOC

BT

GM

BE

BE

BE

BE

� CONST. RIDGEMOOR BLVD. � RIDGEMOOR BLVD.

.7

E L

.6

E L

ECON

END RECONSTRUCTION STA. 904+02.33 RT.

� PGL RT.

595+50.00STA.

1" = 10' Vertical 1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

1:6 6.00% 2.00%

1.94%

WM

BFOC

BT

GM

BE

BE

BE

BE

� CONST. RIDGEMOOR BLVD. � RIDGEMOOR BLVD.

.5

E L

.3

E L

ECON

1.61% 8.66%

� PGL RT.

596+00.00STA.

1" = 10' Vertical 1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

1:6 6.00% 2.00% ¡

WM

BFOC

BT GMBE

BE

BE

BE

� CONST. RIDGEMOOR BLVD. � RIDGEMOOR BLVD.

.5

E L

ECON

ECON

� PGL RT.

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

CL_CONST-2 - 595+00.00 [SHEET] : c:\users\public\mbipw\5\dms22332\RDXSRD01.dgn

9:38:57 AM4/9/2026Patrick.Siu

596+50.00STA.

1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

6.00% 2.00% ¡

WM

BFOC

BT

GMBE

BE

BE

BE

� CONST. RIDGEMOOR BLVD. � RIDGEMOOR BLVD.

.7

E L

ECON

ECON

� PGL RT.

597+00.00STA.

1" = 10' Vertical 1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140

10 10

20 20

6.00% 2.00% ¡

BFOC

BE

BE

BE

BE

� CONST. RIDGEMOOR BLVD. � RIDGEMOOR BLVD.

.9

E L

ECON ECON

� PGL RT.

597+50.00STA.

1" = 10' Vertical 1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140 10 10

20 20

6.00% 2.00% ¡

BFOC

BE BEBE BE

� CONST. RIDGEMOOR BLVD. � RIDGEMOOR BLVD.

.1

E L

ECON ECON

� PGL RT.

598+00.00STA.

1" = 10' Vertical 1" = 20' Horizontal

SCALE

140 120 100 80 60 40 20 0 20 40 60 80 100 120 140 10 10

20 20

BFOC

BE BEBE BE

� CONST. RIDGEMOOR BLVD. � RIDGEMOOR BLVD.

ECON ECON

� PGL RT.

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

CL_CONST-2 - 596+50.00 [SHEET] : c:\users\public\mbipw\5\dms22332\RDXSRD01.dgn

9:38:59 AM4/9/2026Patrick.Siu

DATE DESCRIPTION

NO.

SHEET

/2 c u s e r s \p u b li c \m b ip w \5

\d m s

\T C

G N

R D

.d g n

:0

:2

A M

E d

.M a c k e n z ie

32801 FLORIDA, ORLANDO

200 EAST ROBINSON STREET, SUITE 250

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

ENGINEER OF RECORD

CONTROL PLAN

TEMPORARY TRAFFIC

THERE ARE NO LANE CLOSURE HOURS RESTRICTIONS FOR THIS ROADWAY.5.

AND PEDESTRIAN CLOSURE/DETOUR DETAILS.

UTILIZE FDOT STANDARD PLANS INDEX 102-110, 102-600, 102-603, 102-660 AND 102-661 FOR ROADWAY WORK,4.

DURING CONSTRUCTIONDURING ACTIVE LANE CLOSURES2 WEEKS BEFORE CONSTRUCTION

UTILIZE PORTABLE CHANGEABLE MESSAGE SIGNS (PCMS) AS SHOWN BELOW.3.

WITH WORK ACTIVITIES.

ACCESS POINTS MAY BE LOCATED AS NEEDED IN THE FIELD AND MAY BE RELOCATED IN AN EFFORT TO COORDINATE2.

40 MPHPHASE III/IV:

30 MPHPHASE II:

30 MPHPHASE I:

ADVISORY SPEED THROUGH THE TEMPORARY SIGNAL SHALL BE 15 MPH.

THE EXISTING POSTED SPEED IS 40 MPH AND SHALL BE MODIFIED AS STATED BELOW FOR EACH PHASE OF CONSTRUCTION.1.

GENERAL NOTES:

MM/DD/YY

BEGINS

CONST

AHEAD

CLOSED

LANE

DELAY

EXPECT

MESSAGE 1 MESSAGE 2

AHEAD

ZONE

WORK

CAUTION

USE

MESSAGE 1 MESSAGE 2

IN THE EVENT OF A POWER FAILURE, IMMEDIATELY SWITCH TO FLAGGER CONTROLLED OPERATION.4.

ON TRAFFIC VOLUMES.

CONTROLLER TIMINGS PROVIDED ARE INITIAL AND TIMINGS MAY BE CHANGED AT THE DISCRETION OF THE PROJECT ENGINEER, BASED 3.

ROADWAY IN PHASE 1 AND A SINGLE LANE WITH MIDBLOCK CROSSING TRAFFIC CONTROL OPERATION FOR PHASE 2.

THIS TEMPORARY TRAFFIC SIGNALIZATION IS USED TO PROVIDE A SINGLE LANE TRAFFIC CONTROL OPERATION FOR THIS TWO-LANE

THESE PLANS SHOW A TEMPORARY TRAFFIC SIGNAL CONTROLLER, TEMPORARY PORTABLE TRAFFIC SIGNAL SYSTEM, AND SIGNAL HEADS. 2.

PLACE TEMPORARY SIGNALS AT LOCATIONS SHOWN IN THE PLANS.1.

TEMPORARY SIGNAL PHASING NOTES:

ANOTHER TYPE OF VEHICLE DETECTION IS USED, THE ENGINEER MUST BE INFORMED SO THE "EXTENSION TIME" CAN BE REEVALUATED.

"EXTENSION TIME" IN THE CONTROLLER TIMING CHART IS BASED ON 20 FOOT LONG LOOP DETECTOR WITH A 5 SECOND DELAY. IF

VEHICLE DETECTION SHALL BE PROVIDED ON THE APPROACH TO EACH STOP LINE USING A FDOT CERTIFIED DETECTION DEVICE. 3.

EACH PHASE OF THE CONTROLLER SHALL BE VEHICLE ACTUATED WITH "ALL RED REST" ACTIVATED. 2.

CROSSING IS MOVEMENT P4, ON TIMING FUNCTION 2.

MOVEMENT 2, ON TIMING FUNCTION 1, AND WESTBOUND RIDGEMOOR BLVD. IS MOVEMENT 6, ON TIMING FUNCTION 3. THE MIDBLOCK

THE TEMPORARY TRAFFIC SIGNAL CONTROLLER SHALL PROVIDE SOP 2 (MODIFIED) OPERATION, EAST BOUND RIDGEMOOR BLVD. IS 1.

TEMPORARY SIGNAL CONTROLLER OPERATION NOTES:

PHASE 2 INFORMATION

PHASE 1 INFORMATION

PEDESTRIAN WALK

ALL RED

YELLOW CLEARANCE

T

IM

IN

G

F U

N C

T

IO

N

RECALL

PED. CLEARANCE

MAXIMUM GREEN 2

MOVEMENT NUMBER

TIMING FUNCTION

MAXIMUM GREEN 1

EXTENSION

MINIMUM GREEN

TF 3

PHASE 1 PHASE 2

S.O.P. 2 - MOD

TF 1

3-SECT., 1-WAY

4 AS

R

Y

G

PHASE 3

TF 2

PEDESTRIAN WALK

ALL RED

YELLOW CLEARANCE

T

IM

IN

G

F U

N C

T

IO

N

RECALL

PED. CLEARANCE

MAXIMUM GREEN 2

MOVEMENT NUMBER

TIMING FUNCTION

CONTROLLER TIMINGS

MAXIMUM GREEN 1

EXTENSION

MINIMUM GREEN

P4

2 6

1 3

1 2

10 6 2 P4

P4

TF 3

PHASE 1 PHASE 2

S.O.P. 2 - MOD

TF 1

3-SECT., 1-WAY

4 AS

R

Y

G

PHASE 3

TF 2

2 6

2 N/A

2CONTROLLER TIMINGS

N/A

R/W VARIES R/W VARIES

R/W LINE R/W LINE

STA. 587+63.63 TO STA. 589+57.71

PHASE IA TYPICAL SECTION

� CONST. RIDGEMOOR BLVD.

STA. 589+57.71 TO STA. 904+02.33

STA. 583+44.69 TO STA. 587+63.63

PHASE I TYPICAL SECTION

PHASE I

SHOWN IN PLANS EXCLUDING FRICTION COURSE.

PLACE OVERBUILD WITHIN THE WORK ZONE AREA AS4.

COURSE SURFACE.

FINAL TYPICAL SECTION EXCLUDING FINAL FRICTION

CONFIGURATION WITHIN THE WORK ZONE AREA PER

CONSTRUCT PERMANENT ROADWAY FEATURES AND3.

CLEAR AND GRUB LEFT AND RIGHT SIDE OF ROADWAY.2.

AND TEMPORARY SIGNALS.

EROSION AND SEDIMENT CONTROL DEVICES

CONTROL DEVICES, TEMPORARY PAVEMENT,

PLACE ADVANCE WARNING SIGNS, TRAFFIC1.

2' 10' WORK ZONE

(KEEPER PIN)

CONCRETE BARRIER

TYPE K TEMPORARY

VARIES

NATURAL GROUND

R/W LINE R/W LINE

NATURAL GROUND

� CONST. RIDGEMOOR BLVD.

PAVEMENT

5' TEMP.

10' WORK ZONE

R/W VARIES R/W VARIES

PHASE IA

WORK ZONE AREA AS SHOWN IN PLANS.

DEMOLISH EXISTING BRIDGE WITHIN THE1. SAWCUT LINE

1'-6"

1'-10½"

2'-1½"

2'2'2'

(ANCHORED)

CONCRETE BARRIER

TYPE K TEMPORARY

1'

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/2 c u s e rs \p u b li c \m b ip w \5

\d m s

\T C

T Y

R D

.d g n

:4

:3

P

M E d .M a c k e n z ie

32801 FLORIDA, ORLANDO

200 EAST ROBINSON STREET, SUITE 250

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

ENGINEER OF RECORD

CONTROL PLAN

TEMPORARY TRAFFIC

STA. 587+63.63 TO STA. 589+57.71

PHASE IB TYPICAL SECTION

PHASE IB

WORK ZONE AREA AS SHOWN IN PLANS.

CONSTRUCT PROPOSED BRIDGE WITHIN THE1.

STA. 589+57.71 TO STA. 595+00.00

STA. 584+81.33 TO STA. 587+63.63

PHASE II TYPICAL SECTION

PHASE II

SHOWN IN PLANS EXCLUDING FRICTION COURSE.

PLACE OVERBUILD WITHIN THE WORK ZONE AREA AS4.

COURSE SURFACE.

FINAL TYPICAL SECTION EXCLUDING FINAL FRICTION

CONFIGURATION WITHIN THE WORK ZONE AREA PER

CONSTRUCT PERMANENT ROADWAY FEATURES AND3.

BARRIERS.

CONSTRUCT TEMPORARY PEDESTRIAN WAY AND2.

DEVICES AND TEMPORARY SIGNALS.

CONTROL DEVICES, EROSION AND SEDIMENT CONTROL

SHIFT ADVANCE WARNING SIGNS, TRAFFIC1.

NATURAL GROUND

R/W LINE R/W LINE

NATURAL GROUND

� CONST. RIDGEMOOR BLVD.

R/W VARIES R/W VARIES

10'WORK ZONE

R/W VARIES R/W VARIES

R/W LINE R/W LINE

� CONST. RIDGEMOOR BLVD.

2' 10'

WORK ZONE

(KEEPER PIN)

CONCRETE BARRIER

TYPE K TEMPORARY

VARIES

1'-6"

1'-10½"

2'-1½"

2'2'2'

(ANCHORED)

CONCRETE BARRIER

TYPE K TEMPORARY

32'-4"

6' TEMPORARY PEDESTRIAN WAY

CHANNELIZING DEVICE

PEDESTRIAN LONGITUDINAL

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/2 c u s e rs \p u b li c \m b ip w \5

\d m s

\T C

T Y

R D

.d g n

:0

:5

A M

E d

.M a c k e n z ie

32801 FLORIDA, ORLANDO

200 EAST ROBINSON STREET, SUITE 250

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

ENGINEER OF RECORD

CONTROL PLAN

TEMPORARY TRAFFIC

STA. 587+63.63 TO STA. 589+57.71

PHASE IIB TYPICAL SECTION

PHASE IIA

STA. 587+63.63 TO STA. 589+57.71

PHASE IIA TYPICAL SECTION

PHASE IIB

WORK ZONE AREA AS SHOWN IN PLANS.

CONSTRUCT PROPOSED BRIDGE WITHIN THE1.

R/W VARIES R/W VARIES

R/W LINE R/W LINE

� CONST. RIDGEMOOR BLVD.

WORK ZONE VARIES

2' 2' 1'

11' 5'7'-7"

1'-10½" 1'-10½"

CONCRETE BARRIER

TYPE K TEMPORARY

WORK ZONE AREA AS SHOWN IN PLANS.

DEMOLISH EXISTING BRIDGE WITHIN THE1.

R/W VARIES R/W VARIES

R/W LINE R/W LINE

� CONST. RIDGEMOOR BLVD.

WORK ZONE

2' 2' 1'

11' 5'7'-7"

1'-10½" 1'-10½"

(ANCHORED)

CONCRETE BARRIER

TYPE K TEMPORARY

(ANCHORED)

CONCRETE BARRIER

TYPE K TEMPORARY

CONCRETE BARRIER

TYPE K TEMPORARY

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/2 c u s e rs \p u b li c \m b ip w \5

\d m s

\T C

T Y

R D

.d g n

:0

:1

A M

E d

.M a c k e n z ie

32801 FLORIDA, ORLANDO

200 EAST ROBINSON STREET, SUITE 250

MICHAEL BAKER INTERNATIONAL, INC.

84217LICENSE NUMBER:

TIMOTHY P. WINEBERG, P.E.

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

ENGINEER OF RECORD

CONTROL PLAN

TEMPORARY TRAFFIC

PHASE III

PLANS FOR MORE DETAILS.

AREA AS SHOWN IN THE PLANS. REFER TO STRUCTURES

ADJACENT TO TRAVEL LANE WITHIN THE WORK ZONE

CONSTRUCT PROPOSED BRIDGE TRAFFIC RAILING2.

CONTROL DEVICES. REMOVE TEMPORARY SIGNALS.

SHIFT ADVANCE WARNING SIGNS AND TRAFFIC1.

STA. 587+63.63 TO STA. 589+57.71

PHASE III TYPICAL SECTION

R/W VARIES R/W VARIES

R/W LINE R/W LINE

� CONST. RIDGEMOOR BLVD.

WORK ZONE

1'

4'

1'-4"

(FREE STANDING)

CONCRETE BARRIER

TYPE K TEMPORARY

10'6'-1½"

1'-10½"

4'12'12'4'5' 1'

4' 8'

1'-4"

PHASE IV

REMOVE ALL TRAFFIC CONTROL SIGNS AND DEVICES.4.

REMOVE ALL…