UNSPSC 95121627: Footbridge

Commodity

Code facts

NIGP codes
1
Open opportunities
3 12 posted in the last 90 days

UNSPSC codes and definitions come from the UN Development Programme (managed by GS1 US), and state and local contract opportunities from the governments' procurement sites.

State & local contract opportunities

Notice Posted Due
2627-05 Mixville Park Pedestrian Bridge Open · Connecticut
Master Services Agreement for Miscellaneous Bridge Repairs Open · Florida
Bascule Bridge Maintenance and Emergency Response Repair Services Closed · Florida —
REBID Haralson Mill Rd. Covered Bridge Rehabilitation Open · Georgia
20-20260817094815 bsmc Closed · Mississippi
CDBG-DR HS019 Construction-Alger Rd Bridge Replacement and Jefferson Ave Pipe Culvert Rehab Closed · Florida
Church St Bridge Rehabilitation Closed · Connecticut
Main Street Bridge No. 794004 Repairs - Cleaning and Painting Closed · Florida
169-20260731111926 bsjc Closed · Mississippi
20-20260729084210 lcbs Closed · Mississippi
169-20260715112018 bsjc Closed · Mississippi
7-20260724115618 MDOT Closed · Mississippi
45-20260622154744 bspc Closed · Mississippi
7-20260622155941 Jackson Closed · Mississippi
45-20260602095226 bspc Closed · Mississippi
Benning Road Bridges and Transportation Project 34th street to Minnesota Ave. Closed · District of Columbia
122-20260521133343 MDOT Closed · Mississippi
122-20260521130442 MDOT Closed · Mississippi
Franklin gateway bridge replacement over rottenwood creek RFB-26-53499 Closed · Georgia
IFB - george washington blvd pedestrian bridge Closed · Utah
169-20260528091053 bsjc Closed · Mississippi
118-20260422141411 bssc Closed · Mississippi
Bridge Steel And Coating Maintenance Repairs Closed · Oregon
147-20260402140502 bsrc Closed · Mississippi
167-20260401153914 Byram Closed · Mississippi
BS148B - ITB Cox Creek (Waverly ) Dr bridge (city of Millersburg) (Range 0-5M) Closed · Oregon
T32-D6-Bridge-A1Cherokee SR417 Ex20-186812 Closed · Georgia
State Parks Project – Willapa Hills Trail Fish Passage and Habitat Restoration at Willapa Hills State Park Closed · Washington
Construction Services for Los Vecinos Tijeras Creek Pedestrian Bridge Closed · New Mexico
McLeod Creek Prefabricated Pedestrian Bridges Closed · Utah
T32-D6-Bridge-A3 Carroll SR1 1-20 - 186104 Closed · Georgia
T32-D6-Bridge-A1Bartow SR1000, SR3 -186100 Closed · Georgia
T32-D6-Bridge-A1 SR1000, SR293-186102 Closed · Georgia
122-20260306161609 Hinds Closed · Mississippi
122-20260306161754 Hinds Closed · Mississippi
IFB - pedestrian bridges for trail projects Closed · Utah
Haralson Mill Rd. Covered Bridge Rehabilitation Closed · Georgia
Hopewell Middle School Bridge Project Closed · Georgia
Addendum #2 BDC17-25/26 Big Shoals State Park - Trail Bridges Replacement Closed · Florida
Bid No. SY25002 - Nutwood Ave Pedestrian Bridge (Titan Gateway) Closed · California
Addendum #1 BDC17-25/26 Big Shoals State Park - Trail Bridge Replacement Closed · Florida
Garfoot Creek Bridge Construction Closed · Wisconsin
T32-D6-Bridge I-75 I-575 2 locations-184406 Closed · Georgia
T32-D6-Bridge I-75 R-R Allatoona Dam-184409 Closed · Georgia
T32-D6-Bridge Bartow I-75 GladeRd-184403 Closed · Georgia
Rebid NB Boone Bridge (I-5 Over Willamette River at MP 283. 11) Joint Rehabilitation Project Closed · Oregon
Invitation to Bid BDC17-25/26 Big Shoals State Park – Trail Bridge Replacement Closed · Florida
BR2026-1 Bonnybrook Trail Rehabilitation Project For Bridge No. 102-025 And 102-029 Closed · Connecticut
121-20260109123914 bsac Closed · Mississippi
121-20260109124346 bsac Closed · Mississippi
Show 40 more

Latest 50 of 240 listed here. See the rest on GovTribe.

Opportunities by state

Rank State Open now Posted, last 90 days
1 Mississippi 0 5
2 Florida 1 4
3 Connecticut 1 2
4 Georgia 1 1

NIGP codes for 95121627

Definition

A bridge allowing pedestrians to span an obstacle while on a path

About UNSPSC 95121627

UNSPSC 95121627 Footbridge, a Commodity code, encompasses pedestrian and bicycle bridge construction and replacement projects that state and local governments solicit regularly across the country. Recent opportunities show state and local agencies buying removal and replacement of existing pedestrian bridges, new pedestrian and multi-use trail bridges with concrete and prestressed-concrete construction, bridge rehabilitation and deck repairs, prefabricated pedestrian structures, and associated site work including approach slabs, railings, drainage, and utility coordination. Issuing bodies include county transportation and engineering departments (Summit County Utah, Pinellas County Florida, Hillsborough County Florida, Bulloch County Georgia, Marion County Oregon, Montgomery County Pennsylvania), cities (Waco Texas, Jackson Mississippi, Charlotte North Carolina, Palm Bay Florida, Marietta Georgia, St. George Utah, Dallas Texas, Arlington Texas), special authorities (Orange County Florida, Jekyll Island State Park Authority Georgia), and municipal transit and utilities departments. The code sees steady activity across multiple states with no single geographic concentration; recent solicitations span Utah, Mississippi, Florida, Georgia, Texas, Oregon, North Carolina, Pennsylvania, and Wisconsin.

Representative recent opportunities include Summit County, Utah's McLeod Creek Bridge Replacement (PCMC27006ENG, IFB due August 5, 2026) for removal and replacement of two pedestrian bridges with prefabricated structures and site restoration; Orange County, Florida's Horizon West Trail Phase 1A (Y26-754, IFB due August 13, 2026) for a 0.668-mile multi-use trail with a prestressed concrete boardwalk, estimated at $5.657 million; Pinellas County, Florida's Ridgemoor Boulevard Bridge replacement (ITB-C #26-0506, qualifications due July 7, 2026 and bids July 28, 2026) for a 135-foot prestressed concrete structure over Brooker Creek, estimated at $7.616 million with federal funding participation; and the City of Waco and TxDOT's Speegleville Bridge Over Middle Bosque Replacement (RFB 2026-023, IFB due July 29, 2026) for two 670-foot bridges and roadway reconstruction, estimated at $17.3 million. Bulloch County, Georgia solicited bridge construction work requiring GDOT prequalification in concrete structures (FY27-ENGCP-003-2 Cypress Lake Road and FY27-ENGCP-002-2 G.W. Oliver Road, both due July 24, 2026). Bids typically require 5 percent bid bonds, performance and payment bonds at 100 percent of contract value, prevailing wage compliance on federally funded work, FDOT or GDOT prequalification where specified, and substantial completion within 240 to 960 calendar days depending on project scope.

Quick answers

What is UNSPSC 95121627?

UNSPSC 95121627 is Footbridge, a commodity in UNSPSC 95000000, Land and Buildings and Structures and Thoroughfares.

Which states post the most state and local bids under UNSPSC 95121627?

The states with the most state and local contract opportunities under UNSPSC 95121627 posted in the last 90 days are Mississippi (5), Florida (4) and Connecticut (2).

Which NIGP codes match UNSPSC 95121627?

UNSPSC 95121627 maps to 1 NIGP code, 91313 Construction, Bridge and Drawbridge (Includes Reconstruction/Rehabilitation).

What is the latest state & local contract opportunity under UNSPSC 95121627?

The latest state & local contract opportunity under UNSPSC 95121627 is 2627-05 Mixville Park Pedestrian Bridge from Connecticut, posted October 13, 2026.

On GovTribe

See everything under UNSPSC 95121627

  • State & local contract opportunities, awards and contract vehicles under this code
  • Contacts who buy under this code
  • Ask GovTribe AI about this code