This is a pricing proposal for the Ridgemoor Boulevard and Brooker Creek Bridge Replacement Project, a federally funded Local Agency Program (LAP) project administered through the Florida Department of Transportation (FDOT) on behalf of Pinellas County. The project involves replacement of the existing 120-foot flat slab bridge with a 135-foot structure along with associated roadway and drainage improvements. The proposal itemizes costs across multiple work categories including survey and layout, mobilization, maintenance of traffic, erosion and sediment control, clearing and grubbing, grading, pavement milling and placement, and miscellaneous items. Notable quantities include 24,509 work zone signs, 66,393 channelizing devices, 3,581 linear feet of sediment barrier, 2.17 acres of clearing and grubbing, 5,432 square yards of type B stabilization, 4,338 square yards of asphalt milling, and various asphalt concrete placements totaling over 1,400 tons.
The engineer's estimate reflects unit prices for labor-intensive survey work ranging from $50,000 to $300,000 per lump sum item, with mobilization estimated at $700,000 and maintenance of traffic at $500,000. Traffic control items carry relatively low unit costs ranging from $0.06 to $224.63 per item or linear foot, while earth work and paving items range from $10.36 to $408.94 per unit. The proposal reflects the comprehensive scope required for a major bridge replacement project involving temporary traffic management, environmental protections, and full roadway reconstruction. As a federally funded project through FDOT, the work will be subject to federal requirements and oversight in addition to state and local regulations.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROADWAY
| Ridgemoor Boulevard and Brooker Creek at Brooker Creek Bridge Replacement | 4/3/26 | ||||
| Engineer Estimate | |||||
| Pay Item No. | Description | Quantity | Unit | UnitPrice | Amount |
| ROADWAY- PARTICIPATING | |||||
| 005-0701 | SURVEY, CONSTRUCTION LAYOUT | 1.00 | LS | $ 300,000.00 | $300,000.00 |
| 005-0703 | SURVEY, EARTHWORK QUANTITY MEASUREMENTS | 1.00 | LS | $ 50,000.00 | $50,000.00 |
| 005-0705 | SURVEY, PERMITTING AS-BUILT REQUIREMENTS | 1.00 | LS | $ 50,000.00 | $50,000.00 |
| 0101-0100 | MOBILIZATION | 1.00 | LS | $ 700,000.00 | $700,000.00 |
| 0102-1000 | MAINTENANCE OF TRAFFIC | 1.00 | LS | $ 500,000.00 | $500,000.00 |
| 0102-2200 | SPECIAL DETOUR- TEMPORARY PAVEMENT | 541.00 | SY | $35.30 | $19,097.30 |
| 0102-4-1 | PEDESTRIAN OR BICYCLE SPECIAL DETOUR | 696.00 | SY | $105.97 | $73,755.12 |
| 102-5000 | WATER, FOR DUST CONTROL | 100.00 | THG | $100.00 | $10,000.00 |
| 0102-60 | WORK ZONE SIGN | 24,509.00 | ED | $0.25 | $6,127.25 |
| 0102-71-15 | TEMPORARY BARRIER, F&I, ANCHORED | 1,319.00 | LF | $10.70 | $14,113.30 |
| 0102-71-25 | TEMPORARY BARRIER, RELOCATE, ANCHORED | 1,825.00 | LF | $4.58 | $8,358.50 |
| 0102-74-1 | CHANNELIZING DEVICE- TYPES I, II, DI, VP, DRUM, OR LCD | 66,393.00 | ED | $0.14 | $9,295.02 |
| 0102-74-8 | CHANNELIZING DEVICE- PEDESTRIAN LCD (LONGITUDINAL CHANNELIZING DEVICE) | 243,942.00 | ED | $0.06 | $14,636.52 |
| 0102-76 | ARROW BOARD / ADVANCE WARNING ARROW PANEL | 549.00 | ED | $2.64 | $1,449.36 |
| 0102-78-1 | TEMPORARY RAISED/RETROREFLECTIVE PAVEMENT MARKER, TYPE D | 1,194.00 | EA | $6.19 | $7,390.86 |
| 0102-89-1 | TEMPORARY CRASH CUSHION, REDIRECTIVE OPTION | 6.00 | LO | $2,097.49 | $12,584.94 |
| 0102-99 | PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY | 1,609.00 | ED | $13.16 | $21,174.44 |
| 102115 | TYPE III BARRICADE | 1,146.00 | ED | $0.38 | $435.48 |
| 102120 | TEMPORARY TRAFFIC SIGNALS FOR LANE CLOSURE ON TWO-LANE, TWO-WAY ROADWAYS | 830.00 | ED | $224.63 | $186,442.90 |
| 0102913-21 | REMOVABLE TAPE, WHITE, SOLID 6" | 0.11 | GM | $14,974.93 | $1,647.24 |
| 0102913-31 | REMOVABLE TAPE, YELLOW, SOLID 6" | 0.11 | GM | $15,218.63 | $1,674.05 |
| 104-99 | PREVENTION, CONTROL AND ABATEMENT OF EROSION AND WATER POLLUTION | 1.00 | LS | $125,000.00 | $125,000.00 |
| 0104-10-3 | SEDIMENT BARRIER | 3,581.00 | LF | $3.58 | $12,819.98 |
| 0104-11 | FLOATING TURBIDITY BARRIER | 912.00 | LF | $18.51 | $16,881.12 |
| 0104-15 | SOIL TRACKING PREVENTION DEVICE | 3.00 | EA | $6,365.05 | $19,095.15 |
| 0104-18 | INLET PROTECTION SYSTEM | 6.00 | EA | $166.54 | $999.24 |
| 110-0101 | CLEARING & GRUBBING | 2.17 | AC | $37,312.02 | $80,967.08 |
| 0110-4-10 | REMOVAL OF EXISTING CONCRETE | 333.00 | SY | $45.37 | $15,108.21 |
| 0110-21 | TREE PROTECTION BARRIER | 2,496.00 | LF | $7.05 | $17,596.80 |
| 110-9-1 | IRRIGATION SYSTEM, TEMPORARY CAP | 20.00 | EA | $100.00 | $2,000.00 |
| 120-1100 | GRADING | 1.00 | LS | $175,000.00 | $175,000.00 |
| 0120-1 | REGULAR EXCAVATION | 274.60 | CY | $10.36 | $2,844.86 |
| 0120-6 | EMBANKMENT | 933.00 | CY | $10.10 | $9,423.30 |
| 0160-4 | TYPE B STABILIZATION | 5,432.00 | SY | $14.89 | $80,882.48 |
| 285-701 | OPTIONAL BASE, BASE GROUP 01 (RECYCLED CONCRETE AGGREGATE LBR 150) 4" MIN. THICKNESS | 934.00 | SY | $20.88 | $19,501.92 |
| 285-706 | OPTIONAL BASE, BASE GROUP 06 (RECYCLED CONCRETE AGGREGATE LBR 150) 8" MIN. THICKNESS | 3,500.00 | SY | $30.96 | $108,360.00 |
| 0327-70-6 | MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH | 4,338.00 | SY | $4.21 | $18,262.98 |
| 0334-1-13 | SUPERPAVE ASPHALTIC CONC, TRAFFIC C | 784.20 | TN | $161.71 | $126,812.98 |
| 0337-7-83 | ASPHALT CONCRETE FRICTION COURSE,TRAFFIC C, FC-12.5, PG 76-22 | 713.60 | TN | $205.58 | $146,701.89 |
| 0339-1 | MISCELLANEOUS ASPHALT PAVEMENT | 12.10 | TN | $408.94 | $4,948.17 |
| 0425-1541 | INLETS, DT BOT, TYPE D, <10' | 2.00 | EA | $8,310.64 | $16,621.28 |
| 0425-1701 | INLETS, GUTTER, TYPE S, <10' | 2.00 | EA | $6,223.10 | $12,446.20 |
| 0425-15-51 | INLET TOP, REPLACE, CURB INLET | 1.00 | EA | $10,000.00 | $10,000.00 |
| 430-175-118 | PIPE CULVERT,OPTIONAL MATERIAL,ROUND, 18"S/CD (CONCRETE ONLY) | 63.00 | LF | $300.00 | $18,900.00 |
| 0430-94-1 | DESILTING PIPE, 0 - 24" | 65.00 | LF | $32.41 | $2,106.65 |
| 0430-96 | DRAINAGE PIPE REPAIR-CONCRETE COLLAR AT JOINT | 2.00 | EA | $500.00 | $1,000.00 |
| 0520-6 | SHOULDER GUTTER- CONCRETE | 490.00 | LF | $45.31 | $22,201.90 |
| 0520-1-10 | CONCRETE CURB AND GUTTER TYPE F | 27.00 | LF | $69.88 | $1,886.76 |
| 0522-2 | CONCRETE SIDEWALK AND DRIVEWAYS, 6" THICK | 115.00 | SY | $112.69 | $12,959.35 |
| 0524-1-29 | CONCRETE DITCH PAVEMENT, 4", REINFORCED | 213.00 | SY | $199.22 | $42,433.86 |
| 0527-2 | DETECTABLE WARNINGS | 69.00 | SF | $47.68 | $3,289.92 |
| 0536-1-0 | GUARDRAIL -ROADWAY, GENERAL/LOW SPEED TL-2 | 220.00 | LF | $30.43 | $6,694.60 |
| 0536-6 | PIPE RAIL FOR GUARDRAIL | 220.00 | LF | $22.37 | $4,921.40 |
| 0536-8111 | GUARDRAIL TRANSITION CONNECTION TO RIGID BARRIER, F&I- INDEX 536-001, APPROACH TL-2 | 2.00 | EA | $3,500.46 | $7,000.92 |
| 0536-73 | GUARDRAIL REMOVAL | 327.00 | LF | $3.39 | $1,108.53 |
| 0536-85-24 | GUARDRAIL END TREATMENT- PARALLEL APPROACH TERMINAL | 2.00 | EA | $3,893.24 | $7,786.48 |
| 0570-1-2 | PERFORMANCE TURF, SOD | 2,322.00 | SY | $6.17 | $14,326.74 |
| 0570-1-3 | PERFORMANCE TURF, SOD AND SOIL- SHOULDER TREATMENT INDEX 570-010 | 289.00 | SY | $7.31 | $2,112.59 |
| 0710-11101 | PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID, 6" | 1.03 | GM | $2,526.29 | $2,607.13 |
| 0710-11123 | PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID FOR CROSSWALK AND ROUNDABOUT, 12" | 253.00 | LF | $1.63 | $412.39 |
| 0710-11125 | PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID FOR STOP LINE OR CROSSWALK, 24" | 313.00 | LF | $2.82 | $882.66 |
| 0710-11201 | PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW, SOLID, 6" | 1.45 | GM | $2,617.20 | $3,781.85 |
| SUBTOTAL | $3,166,869.66 |
| STRUCTURES- PARTICIPATING | |||||
| 0108-1 | MONITOR EXISTING STRUCTURES- INSPECTION AND SETTLEMENT MONITORING | 1.00 | LS | $38,308.14 | $38,308.14 |
| 0108-2 | MONITOR EXISTING STRUCTURES- VIBRATION MONITORING | 1.00 | LS | $74,946.20 | $74,946.20 |
| 0110-3 | REMOVAL OF EXISTING STRUCTURES/BRIDGES | 6,450.00 | SF | $126.43 | $815,473.50 |
| 0400-2-4 | CONC CLASS II, BRIDGE SUPERSTRUCTURE | 239.00 | CY | $1,846.58 | $441,332.62 |
| 0400-2-10 | CONCRETE CLASS II, APPROACH SLABS | 136.00 | CY | $800.71 | $108,896.56 |
| 0400-4-5 | CONCRETE CLASS IV, BRIDGE SUBSTRUCTURE | 119.00 | CY | $2,923.31 | $347,873.89 |
| 0400-4-8 | CONC CLASS IV, BULKHEAD | 50.00 | CY | $2,946.00 | $147,300.00 |
| 0400-7-1 | BRIDGE DECK GROOVING | 614.00 | SY | $7.21 | $4,426.94 |
| 0400-9-1 | BRIDGE DECK PLANING | 614.00 | SY | $8.04 | $4,936.56 |
| 400147 | COMPOSITE NEOPRENE PADS | 13.60 | CF | $1,429.15 | $19,436.44 |
| 0415-1-4 | REINFORCING STEEL - BRIDGE SUPERSTRUCTURE | 41,632.00 | LB | $1.58 | $65,778.56 |
| 0415-1-5 | REINFORCING STEEL- BRIDGE SUBSTRUCTURE | 13,352.00 | LB | $1.81 | $24,167.12 |
| 0415-1-8 | REINFORCING STEEL- BULKHEAD | 2,186.00 | LB | $2.53 | $5,530.58 |
| 0415-1-9 | REINFORCING STEEL- APPROACH SLABS | 25,890.00 | LB | $1.59 | $41,165.10 |
| 0450-2-36 | PREST BEAMS: FLORIDA-I BEAM 36" | 804.00 | LF | $607.65 | $488,550.60 |
| 0455-15-15 | PREFORMED PILE HOLES, 30" TO 34" DRILL/PUNCH SIZE | 180.00 | LF | $164.98 | $29,696.40 |
| 0455-20-1 | PILE INSPECTION, DRIVEN PILE | 18.00 | EA | $561.83 | $10,112.94 |
| 0455-34-5 | PRESTRESSED CONCRETE PILING, 24" SQ | 1,290.00 | LF | $258.60 | $333,594.00 |
| 455115 | PILE REDRIVE | 6.00 | EA | $460.99 | $2,765.94 |
| 0455133-2 | SHEET PILING STEEL, TEMPORARY-CRITICAL | 1,059.00 | SF | $116.00 | $122,844.00 |
| 0455133-3 | SHEET PILING STEEL, F&I PERMANENT | 6,409.00 | SF | $91.00 | $583,219.00 |
| 455137 | LOAD TEST (DYNAMIC), DATA COLLECTION AND ANALYSIS | 24.00 | EA | $990.70 | $23,776.80 |
| 0455137-2 | LOAD TEST (DYNAMIC), VERIFICATION TEST | 6.00 | EA | $2,804.59 | $16,827.54 |
| 0455143-5 | TEST PILES-PRESTRESSED CONCRETE,24" SQ | 258.00 | LF | $477.63 | $123,228.54 |
| 0458-1-11 | BRIDGE DECK EXPANSION JOINT, NEW CONSTRUCTION, F&I POURED JOINT WITH BACKER ROD | 124.00 | LF | $66.85 | $8,289.40 |
| 0515-4-2 | BULLET RAIL, DOUBLE RAIL | 388.00 | LF | $52.54 | $20,385.52 |
| 0521-5-13 | CONCRETE TRAFFIC RAILING- BRIDGE, 36" SINGLE-SLOPE | 388.00 | LF | $135.74 | $52,667.12 |
| 0521-6-11 | CONCRETE PARAPET, PEDESTRIAN/BICYCLE, 27" HEIGHT | 388.00 | LF | $156.13 | $60,578.44 |
| 0530-3-3 | RIPRAP- RUBBLE, BANK AND SHORE | 573.00 | TN | $300.00 | $171,900.00 |
| 0530-74 | BEDDING STONE | 229.00 | TN | $250.00 | $57,250.00 |
| 0630-2-16 | CONDUIT, FURNISH & INSTALL, EMBEDDED CONCRETE BARRIERS AND TRAFFIC RAILINGS | 1,164.00 | LF | $25.23 | $29,367.72 |
| 0635-3-13 | JUNCTION BOX, FURNISH & INSTALL, EMBEDDED | 4.00 | EA | $1,500.26 | $6,001.04 |
| SUBTOTAL | $4,280,627.21 |
| SIGNING AND PAVEMENT MARKINGS- PARTICIPATING | |||||
| 0700 1111 | SINGLE COLUMN GROUND SIGN ASSEMBLY, F&I GROUND MOUNT, LESS THAN 12 SF | 11.00 | EA | $755.02 | $8,305.22 |
| 0700 1600 | SINGLE COLUMN GROUND SIGN ASSEMBLY, REMOVE | 7.00 | EA | $124.50 | $871.50 |
| 0700 13 15 | RETROREFLECTIVE SIGN STRIP- FURNISH AND INSTALL, 5' | 1.00 | EA | $153.94 | $153.94 |
| 0705 10 1 | OBJECT MARKER, TYPE 1 | 1.00 | EA | $318.28 | $318.28 |
| 0706 1 3 | RAISED PAVEMENT MARKER, TYPE B | 168.00 | EA | $5.87 | $986.16 |
| 0710 90 | PAINTED PAVEMENT MARKINGS, FINAL SURFACE | 1.00 | LS | $3,000.00 | $3,000.00 |
| 0711 11160 | THERMOPLASTIC, STANDARD, WHITE, MESSAGE OR SYMBOL | 2.00 | EA | $242.72 | $485.44 |
| 0711 11170 | THERMOPLASTIC, STANDARD, WHITE, ARROW | 2.00 | EA | $104.35 | $208.70 |
| 0711 11224 | THERMOPLASTIC, STANDARD, YELLOW, SOLID, 18" FOR DIAGONAL OR CHEVRON | 384.00 | LF | $6.88 | $2,641.92 |
| 0711 16101 | THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SOLID, 6" | 0.70 | GM | $6,782.36 | $4,740.87 |
| 0711 16131 | THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SKIP, 6",10-30 SKIP OR 3-9 LANE DROP | 0.10 | GM | $2,038.15 | $193.62 |
| 0711 16201 | THERMOPLASTIC, STANDARD-OTHER SURFACES, YELLOW, SOLID, 6" | 0.86 | GM | $6,671.56 | $5,730.87 |
| 0711 16231 | THERMOPLASTIC, STANDARD-OTHER SURFACES, YELLOW, SKIP, 6" | 0.03 | GM | $1,806.32 | $54.19 |
| 713103101 | PERMANENT TAPE, WHITE, SOLID, 6" FOR CONCRETE BRIDGES | 0.05 | GM | $53,214.12 | $2,767.13 |
| 713103201 | PERMANENT TAPE, YELLOW, SOLID, 6" FOR CONCRETE BRIDGES | 0.05 | GM | $52,718.20 | $2,741.35 |
| SUBTOTAL | $33,199.19 |
| ROADWAY- NON-PARTICIPATING | |||||
| 0107-1 | LITTER REMOVAL | 12.50 | AC | $750.00 | $9,375.00 |
| 0107-2 | MOWING | 0.60 | AC | $25,000.00 | $15,000.00 |
| $0.00 | |||||
| SUBTOTAL | $24,375.00 |
| UNSPECIFIED- NON-PARTICIPATING | |||||
| 999-0000 | UNSPECIFIED WORK | 800,000.00 | EA | $1.00 | $800,000.00 |
| $0.00 | |||||
| SUBTOTAL | $800,000.00 |
| SUBTOTAL- PARTICIPATING | $ 7,480,696.06 | |
| SUBTOTAL- NON- PARTICIPATING | $824,375.00 | |
| TOTAL BID | $ 8,305,071.06 |
STRUCTURES
| 0108 1 | MONITOR EXISTING STRUCTURES- INSPECTION AND SETTLEMENT MONITORING | LS | 1 | $38,308.14 | $38,308.14 |
| 0108 2 | MONITOR EXISTING STRUCTURES- VIBRATION MONITORING | LS | 1 | $74,946.20 | $74,946.20 |
| 0110 3 | REMOVAL OF EXISTING STRUCTURES/BRIDGES | SF | 6450 | $126.43 | $815,473.50 |
| 0400 2 4 | CONC CLASS II, BRIDGE SUPERSTRUCTURE | CY | 239 | $1,846.58 | $441,332.62 |
| 0400 2 10 | CONCRETE CLASS II, APPROACH SLABS | CY | 136 | $800.71 | $108,896.56 |
| 0400 4 5 | CONCRETE CLASS IV, BRIDGE SUBSTRUCTURE | CY | 119 | $2,923.31 | $347,873.89 |
| 0400 4 8 | CONC CLASS IV, BULKHEAD | CY | 50 | $2,946.00 | $147,300.00 |
| 0400 7 1 | BRIDGE DECK GROOVING | SY | 614 | $7.21 | $4,426.94 |
| 0400 9 1 | BRIDGE DECK PLANING | SY | 614 | $8.04 | $4,936.56 |
| 400147 | COMPOSITE NEOPRENE PADS | CF | 13.6 | $1,429.15 | $19,436.44 |
| 0415 1 4 | REINFORCING STEEL - BRIDGE SUPERSTRUCTURE | LB | 41632 | $1.58 | $65,778.56 |
| 0415 1 5 | REINFORCING STEEL- BRIDGE SUBSTRUCTURE | LB | 13352 | $1.81 | $24,167.12 |
| 0415 1 8 | REINFORCING STEEL- BULKHEAD | LB | 2186 | $2.53 | $5,530.58 |
| 0415 1 9 | REINFORCING STEEL- APPROACH SLABS | LB | 25890 | $1.59 | $41,165.10 |
| 0450 2 36 | PREST BEAMS: FLORIDA-I BEAM 36" | LF | 804 | $607.65 | $488,550.60 |
| 0455 15 15 | PREFORMED PILE HOLES, 30" TO 34" DRILL/PUNCH SIZE | LF | 180 | $164.98 | $29,696.40 |
| 0455 20 1 | PILE INSPECTION, DRIVEN PILE | EA | 18 | $561.83 | $10,112.94 |
| 0455 34 5 | PRESTRESSED CONCRETE PILING, 24" SQ | LF | 1290 | $258.60 | $333,594.00 |
| 455115 | PILE REDRIVE | EA | 6 | $460.99 | $2,765.94 |
| 0455133 2 | SHEET PILING STEEL, TEMPORARY-CRITICAL | SF | 1059 | $55.15 | $58,403.85 |
| 0455133 3 | SHEET PILING STEEL, F&I PERMANENT | SF | 6409 | $32.19 | $206,305.71 |
| 455137 | LOAD TEST (DYNAMIC), DATA COLLECTION AND ANALYSIS | EA | 24 | $990.70 | $23,776.80 |
| 0455137 2 | LOAD TEST (DYNAMIC), VERIFICATION TEST | EA | 6 | $2,804.59 | $16,827.54 |
| 0455143 5 | TEST PILES-PRESTRESSED CONCRETE,24" SQ | LF | 258 | $477.63 | $123,228.54 |
| 0458 1 11 | BRIDGE DECK EXPANSION JOINT, NEW CONSTRUCTION, F&I POURED JOINT WITH BACKER ROD | LF | 124 | $66.85 | $8,289.40 |
| 0515 4 2 | BULLET RAIL, DOUBLE RAIL | LF | 388 | $52.54 | $20,385.52 |
| 0521 5 13 | CONCRETE TRAFFIC RAILING- BRIDGE, 36" SINGLE-SLOPE | LF | 388 | $135.74 | $52,667.12 |
| 0521 6 11 | CONCRETE PARAPET, PEDESTRIAN/BICYCLE, 27" HEIGHT | LF | 388 | $156.13 | $60,578.44 |
| 0530 3 3 | RIPRAP- RUBBLE, BANK AND SHORE | TN | 573 | $140.04 | $80,242.92 |
| 0530 74 | BEDDING STONE | TN | 229 | $195.13 | $44,684.77 |
| 0630 2 16 | CONDUIT, FURNISH & INSTALL, EMBEDDED CONCRETE BARRIERS AND TRAFFIC RAILINGS | LF | 1164 | $25.23 | $29,367.72 |
| 0635 3 13 | JUNCTION BOX, FURNISH & INSTALL, EMBEDDED | EA | 4 | $1,500.26 | $6,001.04 |
SIGNING AND PAVEMENT MARKINGS
| 0700 1111 | SINGLE COLUMN GROUND SIGN ASSEMBLY, F&I GROUND MOUNT, LESS THAN 12 SF | EA | 11 | $755.02 | $8,305.22 |
| 0700 1600 | SINGLE COLUMN GROUND SIGN ASSEMBLY, REMOVE | EA | 7 | $124.50 | $871.50 |
| 0700 13 15 | RETROREFLECTIVE SIGN STRIP- FURNISH AND INSTALL, 5' | EA | 1 | $153.94 | $153.94 |
| 0705 10 1 | OBJECT MARKER, TYPE 1 | EA | 1 | $318.28 | $318.28 |
| 0706 1 3 | RAISED PAVEMENT MARKER, TYPE B | EA | 168 | $5.87 | $986.16 |
| 0710 90 | PAINTED PAVEMENT MARKINGS, FINAL SURFACE | LS | 1 | $3,000.00 | $3,000.00 |
| 0711 11160 | THERMOPLASTIC, STANDARD, WHITE, MESSAGE OR SYMBOL | EA | 2 | $242.72 | $485.44 |
| 0711 11170 | THERMOPLASTIC, STANDARD, WHITE, ARROW | EA | 2 | $104.35 | $208.70 |
| 0711 11224 | THERMOPLASTIC, STANDARD, YELLOW, SOLID, 18" FOR DIAGONAL OR CHEVRON | LF | 384 | $6.88 | $2,641.92 |
| 0711 16101 | THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SOLID, 6" | GM | 0.699 | $6,782.36 | $4,740.87 |
| 0711 16131 | THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SKIP, 6",10-30 SKIP OR 3-9 LANE DROP | GM | 0.095 | $2,038.15 | $193.62 |
| 0711 16201 | THERMOPLASTIC, STANDARD-OTHER SURFACES, YELLOW, SOLID, 6" | GM | 0.859 | $6,671.56 | $5,730.87 |
| 0711 16231 | THERMOPLASTIC, STANDARD-OTHER SURFACES, YELLOW, SKIP, 6" | GM | 0.03 | $1,806.32 | $54.19 |
| 713103101 | PERMANENT TAPE, WHITE, SOLID, 6" FOR CONCRETE BRIDGES | GM | 0.052 | $53,214.12 | $2,767.13 |
| 713103201 | PERMANENT TAPE, YELLOW, SOLID, 6" FOR CONCRETE BRIDGES | GM | 0.052 | $52,718.20 | $2,741.35 |