Bid_Submittal_Form-JOC.pdf

PDF 78 KB Posted

Attached to
Ridgemoor Blvd and Brooker Creek at Brooker Creek Bridge #154153 Bridge Replacement Project (PID 005749A)
Solicitation number
26-0506-ITB-C
Issued by
Pinellas County, Clewiston City, Florida

About this file

This is a Bid Submittal Form for an indefinite quantity Job Order Contract (JOC) with Pinellas County, Florida. The contract covers construction services across five work categories: Non-Secure Areas during Normal Working Hours, Non-Secure Areas during Other than Normal Working Hours, Secure Areas during Normal Working Hours, Secure Areas during Other than Normal Working Hours, and Non Pre-priced Tasks. Bidders must examine all Contract Documents and the proposed work location before submitting their proposal. The contract requires bidders to provide all necessary labor, equipment, and materials to complete work in accordance with the Contract Documents and specified time limits for each Job Order.

Pricing for this indefinite quantity contract is structured through a single Adjustment Factor applicable to all unit prices in the Construction Task Catalog, with the base unit prices set at a net value of 1.0000. Bidders must submit one Adjustment Factor for all unit prices; submission of separate factors for different unit prices will result in bid rejection and non-responsive status. The Adjustment Factor is multiplied against each work category with specific weightings (Non-Secure Normal Hours 60%, Non-Secure Other Hours 10%, Secure Normal Hours 10%, Secure Other Hours 10%, and Non Pre-priced 10%) to calculate the Award Criteria Figure used for bid evaluation. Specific constraints apply: Other than Normal Working Hours factors must equal or exceed Normal Working Hours factors within each area type, Secure Areas factors must equal or exceed Non-Secure Areas factors, and Non Pre-priced Work factors must equal or exceed 1.0000. The County reserves the right to correct arithmetic errors using the submitted Adjustment Factor Bid amounts.

View the file

Other files

File Type Posted
Ridgemoor_Blvd_and_Brooker_Creek_at_Brooker_Creek_Bridge_#154153_Bridge_Replacement_Project_(PID_005749A)_(Addendum_#1_Revision).pdf PDF
Ridgemoor_Blvd_and_Brooker_Creek_at_Brooker_Creek_Bridge_#154153_Bridge_Replacement_Project_(PID_005749A).pdf PDF
Appendix_6_Geotechnical_Exploration_–_Structures_Report_03-05-2026.pdf PDF
Appendix_5_UWS_Pinellas_County_Utilities.pdf PDF
Appendix_6_FDOT_Right_of_Way_Certification_Memo_12-10-2025.pdf PDF
Appendix_6_FDOT_Engineering_“No-Rise”_Certification_Memo_11-12-2025.pdf PDF
PLANS_-_Sediment_and_Erosion_Control.pdf PDF
Appendix_6_Construction_Project_Requirements_Memo_02-27-2026.pdf PDF
Appendix_6_FDOT_Spectrum_Clear_Letter_3-27-2026.pdf PDF
Appendix_5_UWS_Clearwater_Gas.pdf PDF
Appendix_5_UWS_MCI_Metro_Access_Transmission_Services.pdf PDF
Appendix_6_FDOT_Environmental_Certification_Memo_01-30-2024.pdf PDF
Appendix_4_-_Special_Notices_6.23.pdf PDF
Appendix_6_FDOT_Preliminary_Engineering_Certification_Memo_03-6-2026.pdf PDF
Appendix_5_UWS_Duke.pdf PDF
Appendix_6_FDOT_WOW_Clear_Letter_8-2-2024.pdf PDF
Appendix_6_FDOT_Permit_Certification_Memo__02-24-2026.pdf PDF
Appendix_6_FDOT_Environmental_Certification_Memo_02-5-2026.pdf PDF
Appendix_6_FDOT_Utility_Certification_Memo_02-25-2026.pdf PDF
Appendix_5_UWS_Frontier.pdf PDF
Appendix_6_FDOT_Railroad_Certification_Memo_12-19-2025.pdf PDF
PLANS_-_ROADWAY.pdf PDF
PLANS-STRUCTURES.pdf PDF
Sample_Performance_and_Payment_Bonds_26-0506.pdf PDF
Section_7_-_County_Specifications.pdf PDF
FDOT_Specifications_Package.pdf PDF
APPENDIX_1-Permits_.pdf PDF
Sample_Application_for_Payment.pdf PDF
Sample_Change_Order.pdf PDF
QUALIFICATION-SUBMITTAL-FORM_FDOT.pdf PDF
Affdavit_of_Release_and_Guarantee.pdf PDF
Pricing_Proposal_ITB_26-0506(reference_only).pdf PDF
OpenGov_Fillable-_Final.pdf PDF
E-Verify_Affidavit.pdf PDF
Florida_Trench_Safety_Form.pdf PDF
Appendix_1-Permits_.pdf PDF
Sample_Agreement-26-0506.pdf PDF
2025_Pinellas_County_Supplemental_Specifications_.pdf PDF
SBE_Compliance_Form.pdf PDF
QUALIFICATION_SUBMITTAL_FORM_4-26-2026.pdf PDF
FDOT_Division_Specification_(FY2026-27)-ebook(signed)_(For_Legistar_only).pdf PDF
Airport_Security_Program.pdf PDF
Pricing_Proposal_(for_Review_Only).xlsx XLSX spreadsheet
Non-Competitive_Oversight_Committee_Justification_Form.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION F – BID SUBMITTAL FORM

NO CHANGES SHALL BE MADE TO THE FACTORS CONTAINED HEREIN.

ANY CORRECTIONS TO BIDDER ENTRIES SHALL BE INITIALED BY BIDDER.

TO THE COUNTY OF PINELLAS, FLORIDA:

We, the undersigned, hereby declare that no person or persons, firm or corporation, other than the undersigned, are interested in this proposal, as principals, and that this Proposal is made without collusion with any person, firm or corporation, and we have carefully and to our full satisfaction examined the Contract Documents, and that we have made a full examination of the location of the proposed work and the source of supply of materials, and we hereby agree to furnish all necessary labor, equipment, and materials, fully understanding that this is an indefinite quantity Contract, and that we will fully complete all necessary work in accordance with the Contract Documents, within the time limit specified in each Job Order for the unit prices set forth in the Construction Task Catalog®, multiplied by the Adjustment Factors inserted below.

All Unit Prices listed in the Construction Task Catalog® are priced at a net value of 1.0000. The Adjustment Factors shall be an increase or decrease to all the Unit Prices listed in the Construction Task Catalog®. For example, 1.1000 would be a 10% increase to the Unit Prices and 0.9500 would be a 5% decrease to the Unit Prices. Bidders who submit separate Adjustment Factors for separate Unit Prices will be considered non-responsive and their bid will be rejected.

EXAMPLE: Write the Adjustment Factor to four decimal places as the following example illustrates.

1 . 2 1 9 8

OR

0 . 9 9 9 9

For bid evaluation purposes only, the following work distributions shall be used to determine the Award Criteria Figure:

Adjustment Factor % Weight (For Bid Evaluation Only)

Non-Secure Areas, Normal Working Hours 60%

Non-Secure Areas, Other than Normal Working Hours

10%

Secure Areas, Normal Working Hours 10%

Secure Areas, Other than Normal Working Hours 10%

Non Pre-priced 10%

BID FORM

SCHEDULE OF PRICES

Adjustment Factor Name Adjustment Factor

Bid X Multiplier =Extended Total

1. Non-Secure Areas, Normal Working Hours Adjustment Factor

__ . __ __ __ __ X 0.60 = __ . __ __ __ __

2. Non-Secure Areas, Other than Normal Working Hours Adjustment Factor

__ . __ __ __ __ X 0.10 = __ . __ __ __ __

3. Secure Areas, Normal Working Hours Adjustment Factor

__ . __ __ __ __ X 0.10 = __ . __ __ __ __

4. Secure Areas, Other than Normal Working Hours Adjustment Factor

__ . __ __ __ __ X 0.10 = __ . __ __ __ __

5.

Non Pre-priced Task Adjustment Factor __ . __ __ __ __ X 0.10 = __ . __ __ __ __

6. Sum the Extended Total column.

The Sum is the Award Criteria Figure.

1. Specify lines 1 through 6 to 4 decimal places. Use conventional rounding methodology (i.e., if the number in the 5th decimal place is 0-4, the number in the 4th decimal remains unchanged; if the number in the 5th decimal place is 5-9, the number in the 4th decimal is rounded upward).

2. The Other Than Normal Working Hours in Non-Secure Areas Adjustment Factor must be greater than or equal to the Normal Working Hours Adjustment Factor in Non-Secure Areas.

3. The Other Than Normal Working Hours in Secure Areas Adjustment Factor must be greater than or equal to the Normal Working Hours Adjustment Factor in Secure Areas.

4. The Normal Working Hours in Secure Areas Adjustment Factor must be greater than or equal to the Normal Working Hours Adjustment Factor in Non-Secure Areas.

5. The Other Than Normal Working Hours in Secure Areas Adjustment Factor must be greater than or equal to the Other Than Normal Working Hours Adjustment Factor in Non-Secure Areas.

6. The Non Pre-priced Work tasks Adjustment Factor must be equal to or greater than 1.0000.

7. The weighted multipliers (x multiplier) above are for the purpose of calculating an Award Criteria Figure only. No assurances are made by the Owner that Work will be ordered under the Contract in a distribution consistent with the weighted percentages above. The Award Criteria Figure is only used for the purpose of determining the Bid.

8. When submitting Job Order Price Proposals related to specific Job Orders, the Bidder shall utilize one or more of the Adjustment Factors applicable to the Work being performed.

9. The County reserves the right to correct any arithmetic errors for correctness. In the event of an error, the County will use the Adjustment Factors listed in the column titled “Adjustment Factor Bid” to calculate the extended totals and the Award Criteria Figure.