John Yarbrough Linear Park (JYLP) Trail Construction from Colonial Blvd. to Hanson St. Rebid (Sun Trail 447515-1-54-01)

Open State & local contract opportunity Posted

Solicitation number
ITB 26-061
State
Florida
Responses due

Opportunity facts

UNSPSC codes
Show all 44
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

The City of Fort Myers is requesting submittals from qualified construction contractors for Phase IV Extension Shared Use Path and Bridge Improvements on the John Yarbrough Linear Park Trail, a 1.83-mile project extending from south of SR 884/Colonial Boulevard to Hanson Street, with proposals due November 9, 2026 under rebid Sun Trail 447515-1-54-01. The project is funded through the Florida Shared-Use Nonmotorized Trail Network under the Florida Department of Transportation's FY-24/25 work program and requires execution of significant bridge infrastructure that is the primary scope differentiator: a 912-foot multi-span prestressed concrete bridge over SR 886/Colonial Boulevard and a 139-foot prefabricated steel bridge structure over the 10-Mile Canal.

The scope encompasses the complete shared-use path construction, bridge structures, canal armoring with fabric-formed concrete riprap and bedding stone, utility adjustments (five sanitary sewer valves and three air release valves along the alignment), and all associated earthwork, drainage, and trail finishes. Contractors must comply with Florida Department of Transportation Standard Specifications (FY 2026-27 edition), the Build America, Buy America Act, and federal Endangered Species Act requirements. Environmental permits are substantially cleared: the South Florida Water Management District issued an ERP on December 30, 2025 (valid through December 30, 2030), and the U.S. Army Corps of Engineers confirmed no Department of the Army permit is required. The FAA has issued aeronautical study determinations for both permanent bridge structures and temporary construction cranes, with conditions including marking, lighting, and notification protocols.

The City will award the contract to the lowest responsible, responsive contractor after establishing qualifications and financial ability. Contractors must furnish Performance and Payment Bonds each equal to 100% of contract price, maintain Commercial General Liability ($1,000,000 per occurrence / $2,000,000 aggregate), Builders' Risk insurance equal to the total contract price, and other required coverages including Professional Liability and Pollution Liability at $1,000,000 each. All bonds and certificates of insurance must be recorded in Lee County public records prior to commencing work. The contractor is responsible for all surveying, daily as-built drawings certified by a Florida licensed surveyor (2% contract hold until submission), Critical Path Method scheduling within 15 days of Notice to Proceed, and pre-construction conference. Contract time commences on the date of Notice to Proceed, issued after all required documentation is received. Supporting design documents include geotechnical reports, hydraulics analysis, structural calculations and plans, roadway and canal armoring plans, and utility conflict documentation.

Opportunity text

The City of Fort Myers (City) requests submittals from interested and qualified Respondents to provide:

Construction services associated with the John Yarbrough Linear Park - Phase IV Extension Shared Use Path and Bridge Improvements from South of SR 884/Colonial Boulevard to Hanson Street, approximately 1.83 miles. This includes a 912' multi-span prestressed concrete bridge over SR 886/Colonial Blvd. and a 139' prefabricated steel bridge structure over 10-mile canal. This project is being funded through the Florida Shared-Use Nonmotorized Trail Network under the Department's FY-24/25 work program.

Files

File Type Posted
John_Yarbrough_Linear_Park_(JYLP)_Trail_Construction_from_Colonial_Blvd._to_Hanson_St._Rebid_(Sun_Trail_447515-1-54-01)_(Addendum_#3_Revision).pdf PDF
John_Yarbrough_Linear_Park_(JYLP)_Trail_Construction_from_Colonial_Blvd._to_Hanson_St._Rebid_(Sun_Trail_447515-1-54-01).pdf PDF
AGREEMENT-FDOT_CONSTRUCTION_(9-28-26).pdf PDF
20260302-NPR.pdf PDF
251120-59423_Permit_20251230.pdf PDF
JYLP_Valves_Conflict_05_14_2026.pdf PDF
440341-1-54-01_JYLinearPark_Roadway_GeotechReport_SS_2025-05-09.pdf PDF
CONSTRUCTION_SUPPLEMENTAL_CONDITIONS_2-17-26.pdf PDF
15200-JYLP_Sewer_Pump-out_Removal_2025-06-30_ML.pdf PDF
2025000310065_ESMT_FSQ_The_Palms_at_Fort_Myers_LLC_-_JYLP.pdf PDF
440341-1-54-01_JYLinearPark_Structures_GeotechReport_SS_2025-05-09.pdf PDF
447515-1-54-01_JYLinearPark_CanalArmoring_SS_2026-09-01.pdf PDF
447515-1-54-01_JYLinearPark_RoadwayPlans_SS_2026-09-01_(1).pdf PDF
447515-1-54-01_JYLinearPark_StructureCalcs_FY2026-27_SS_2026-09-01.pdf PDF
447515-1-54-01_JYLinearPark_StructuresPlans_SS_2026-09-01.pdf PDF
2025-03-03_100_Bridge2_Peer_Rev_Cert_Letter.pdf PDF
440341-1-54-01_JYLinearPark_FinalBridgeHydraulicsReport_(1).pdf PDF
11-05-2021_City_of_FM_John_Yarborough_Linear_Park_Trail_405600-001_SFG.pdf PDF
JYLP_Trail_Extension_SFWMD_FINAL_ERP_Exemption.pdf PDF
Temporary_B1_BeginBridge.pdf PDF
Temporary_B1_EndBridge.pdf PDF
Temporary_B2_BeginBridge.pdf PDF
Permanent_B2_over_SR884.pdf PDF
Completed_Maintenance_Agreement.pdf PDF
JYLP_-_Lee_County-Fort_Myers_Maintenance_Agreement_(LAP_#447515-1).pdf PDF
JYLP_Trail_Extension_SFWMD_FINAL_ERP_.pdf PDF
Permanent_B1_over_TenMileCanal.pdf PDF
Temporary_B2_EndBridge.pdf PDF
Completed_Use_and_Occupancy_Agreement.pdf PDF
447515-1-54-01_JYLinearPark_SpecsPackage_SS_FY2026-27,_8-24-26.pdf PDF
INSURANCE_REQUIREMENTS_CHART.pdf PDF
trail_map.pdf PDF
Show all 32

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors