About this file

This document is a technical drawing and specification sheet prepared by Stantec for the City of Fort Myers, Florida, detailing the removal and replacement of a sewer pump-out assembly located at John Yarbrough Linear Park. The project involves isolating flow in an existing 24-inch force main by closing two valves located north of Colonial Boulevard, removing the existing pump-out assembly and manhole structure, and removing all piping from the pump-out assembly back to the existing 24-inch by 24-inch WYE fitting. The work scope includes installing new DR18 PVC pipe with two restrained mechanical joint DI solid sleeves, backfilling the excavation to match existing adjacent grade using select fill compacted to 98 percent ASTM D1557 density in 12-inch maximum lifts, and properly disposing of all demolished materials in accordance with applicable laws and regulations. The project is scheduled for completion in June 2025, as indicated by the document date and project timeline.

The contract includes three bid line items: CFM-002 for the pump-out assembly removal (one lump sum item), CFM-003 for 24-inch line stop contingency (two units), and CFM-004 for additional sewer pump-out removal mobilization contingency (one lump sum item). The specifications require contractors to have emergency repair sleeves on hand in case flow cannot be isolated, provide a professional licensed surveyor to seal and certify the location of the new installed pipe, and comply with City of Fort Myers Public Utilities Department technical specifications and FDOT design standards for traffic management and lane closures. Work may be performed during day or night hours as determined by the City based on its ability to isolate the main.

View the file

Other files

File Type Posted
John_Yarbrough_Linear_Park_(JYLP)_Trail_Construction_from_Colonial_Blvd._to_Hanson_St._Rebid_(Sun_Trail_447515-1-54-01)_(Addendum_#3_Revision).pdf PDF
John_Yarbrough_Linear_Park_(JYLP)_Trail_Construction_from_Colonial_Blvd._to_Hanson_St._Rebid_(Sun_Trail_447515-1-54-01).pdf PDF
AGREEMENT-FDOT_CONSTRUCTION_(9-28-26).pdf PDF
251120-59423_Permit_20251230.pdf PDF
20260302-NPR.pdf PDF
CONSTRUCTION_SUPPLEMENTAL_CONDITIONS_2-17-26.pdf PDF
447515-1-54-01_JYLinearPark_StructureCalcs_FY2026-27_SS_2026-09-01.pdf PDF
447515-1-54-01_JYLinearPark_StructuresPlans_SS_2026-09-01.pdf PDF
440341-1-54-01_JYLinearPark_Structures_GeotechReport_SS_2025-05-09.pdf PDF
447515-1-54-01_JYLinearPark_RoadwayPlans_SS_2026-09-01_(1).pdf PDF
2025000310065_ESMT_FSQ_The_Palms_at_Fort_Myers_LLC_-_JYLP.pdf PDF
JYLP_Valves_Conflict_05_14_2026.pdf PDF
440341-1-54-01_JYLinearPark_Roadway_GeotechReport_SS_2025-05-09.pdf PDF
447515-1-54-01_JYLinearPark_CanalArmoring_SS_2026-09-01.pdf PDF
2025-03-03_100_Bridge2_Peer_Rev_Cert_Letter.pdf PDF
440341-1-54-01_JYLinearPark_FinalBridgeHydraulicsReport_(1).pdf PDF
Completed_Use_and_Occupancy_Agreement.pdf PDF
Temporary_B2_EndBridge.pdf PDF
Temporary_B2_BeginBridge.pdf PDF
JYLP_-_Lee_County-Fort_Myers_Maintenance_Agreement_(LAP_#447515-1).pdf PDF
JYLP_Trail_Extension_SFWMD_FINAL_ERP_.pdf PDF
Completed_Maintenance_Agreement.pdf PDF
Permanent_B2_over_SR884.pdf PDF
11-05-2021_City_of_FM_John_Yarborough_Linear_Park_Trail_405600-001_SFG.pdf PDF
Temporary_B1_BeginBridge.pdf PDF
JYLP_Trail_Extension_SFWMD_FINAL_ERP_Exemption.pdf PDF
Temporary_B1_EndBridge.pdf PDF
Permanent_B1_over_TenMileCanal.pdf PDF
447515-1-54-01_JYLinearPark_SpecsPackage_SS_FY2026-27,_8-24-26.pdf PDF
INSURANCE_REQUIREMENTS_CHART.pdf PDF
trail_map.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

O

RI

G

IN

AL

S

HE

ET

AN

SI

D us

-p pf ss

\s ha re d_ pr oj ec ts\

0\ dr aw in g\ se t0 1\ ac tiv e\ ci vil \s he et

\g -0

.0

6.

1:

:2

AM

CITY OF FORT MYERS

JOHN YARBOROUGH

LINEAR PARK

SEWER PUMP-OUT REMOVAL

FORT MYERS, Florida

JUNE, 2025

STANTEC PROJECT NUMBER: 177315200

CERTIFICATE OF AUTHORIZATION NO. 27013

NTS

N

LOCATION MAP

ATLANTIC OCEAN

GULF OF MEXICO

FORT MYERS

PROJECT

AREA

NTS

N

PROJECT LOCATION

PLANTATION GARDENS DR

COMMERCE

LAKES DR

PALO

M

INO

LANE

TR

EE

LIN

E

AV

E

CHAMBERLIN

PKWY

PROJECT

LOCATION

This item has been digitally signed and sealed by Marc Lean, PE on the date adjacent to the seal.

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

Project No.:

Scale:

Revision:

Drawing No.

Sheet:

Title

C lie nt /P ro je ct

Permit/Seal

Dsgn. Chkd. YYYY.MMDwn.

Th e

C on tra ct or sh al l v er ify a nd b e re sp on sib le fo r a ll d im en sio ns

. D O

N O

T s ca le th e dr aw in g

- a ny e rro rs or o m iss io ns sh al l b e re po rte d to S ta nt ec w ith ou t d el ay

Th e

C op yr ig ht s t o al l d es ig ns a nd d ra w in gs a re th e pr op er ty o f S ta nt ec

. R ep ro du ct io n or u se fo r a ny p ur po se o th er th an th at a ut ho riz ed b y St an te c is fo rb id de n.

File Name: C-101

ORIGINAL SHEET - ANSI D

us

-p pf ss

\s ha re d_ pr oj ec ts\

0\ dr aw in g\ se t0 1\ ac tiv e\ ci vil \s he et

\c -1

.0

6.

1:

:1

AM

Iss ue d By

Ap pd

YY

YY

.M M

.D D

Re vis io n

By Ap pd

YY

YY

.M

M .D

D

Te l:

w w w .st an te c.

co m C er tif ic at e of

A ut ho riz at io n No

. 2

St an te c

Ja ck so n

St

Fo rt M ye rs, F L 3

(2

) 9

-1

A

B

C

D

1 2 3 4 5

C

ITY

O F

FO

RT

M

YE

RS

JO

HN

Y

AR

BR

O

UG

H

LIN

EA

R

PA

RK

SE

W

ER

P

UM

P- O

UT

R

EM

O

VA

L

FO

RT

M

YE

RS

, F

L

2025.06 of 2

NOTES

1. ALL EQUIPMENT, MATERIALS, WORK SHALL BE COMPLETED IN CONFORMANCE

WITH THE CITY OF FORT MYERS PUBLIC UTILITIES DEPARTMENTS'S TECHNICAL

SPECIFICATIONS, WHICH CAN BE FOUND HERE:

https://www.fortmyers.gov/2143/Details-Specs

2. ISOLATE FLOW IN THE EXISTING 24-INCH FORCE MAIN BY CLOSING VALVE 1 AND

VALVE 2, LOCATED APPROXIMATELY 400 LF NORTH OF VALVE 1, JUST NORTH OF

COLONIAL BLVD.

3. PROVIDE A MEANS TO PROPERLY CAPTURE AND DISPOSE OF ANY

WASTEWATER THAT MAY NEED TO DRAIN FROM THE 24-INCH FORCE MAIN IN

ORDER TO REMOVE THE PUMP-OUT ASSEMBLY AND RESTORE THE FORCE MAIN

TO SERVICE. DRAIN AS NECESSARY TO COMPLETE THE WORK.

4. REMOVE EXISTING PUMP-OUT ASSEMBLY AND MANHOLE STRUCTURE.

5. REMOVE ALL PIPING FROM THE PUMP-OUT ASSEMBLY BACK TO THE EXISTING

24"x24" WYE FITTING, INCLUDING THE WYE FITTING. THEN, INSTALL NEW DR18

PVC PIPE WITH TWO RESTRAINED MJ DI SOLID SLEEVES.

6. BACKFILL EXCAVATION TO MATCH EXISTING ADJACENT GRADE USING SELECT

FILL, COMPACTED TO 98% ASTM D1557. BACKFILL AND COMPACT TO GRADE IN

12" (MAX) LIFTS.

7. PROPERLY DISPOSED OF ALL DEMOLISHED MATERIALS IN ACCORDANCE WITH

ALL APPLICABLE LAWS AND REGULATIONS.

8. CONTRACTOR SHALL NOTE CONTINGENCY BID ITEMS HAVE BEEN PROVIDED IN

THE EVENT THE EXISTING ISOLATION VALVES DON'T FUNCTION.

9. CONTRACTOR'S BID SHALL INCLUDE HAVING EMERGENCY REPAIR SLEEVES ON

HAND IN THE EVENT FLOW CANNOT BE ISOLATED FOR COMPLETING THE WORK.

10. CONTRCTOR SHALL PROVIDE MOT IN CONFORMANCE WITH INDEX 600 OF THE

FDOT DESIGN STANDARDS. FDOT LANE CLOSURE RESTRICTIONS APPLY AND

ONLY EVENING CLOSURES ARE ALLOWED (ASSUMING APPROPRIATE).

11. CONTRACTOR'S PRICE TO COMPLETE THE WORK SHALL INCLUDE COMPLETING

THE WORK DURING THE DAY OR NIGHT, AS DETERMINED BY THE CITY BASED ON

ITS ABILITY TO ISOLATE THE MAIN.

C O

LO

N

IA

L

BL

VD

TEN MILE CANAL

C-101

SEWER PUMP-OUT

REMOVAL PLAN

NONE

MPL ML OB

PROPOSED WORK

SCALE: NONE

EXISTING

SCALE: NONE

EXISTING 24" FORCE MAIN

REMOVED

VALVE 2 LOCATED APPROXIMATELY

400 LF NORTH OF VALVE 1

VALVE 2

(NORTH OF

COLONIAL BLVD)

EXISTING PUMP-OUT CONNECTION

TO BE REMOVED

SEE NOTES

VALVE 1

S

15'-0"

S( B)

L

F

90 LF

EXISTING 24"x24" DI MJ WYE

TO BE REMOVED AND REPLACED WITH PVC PIPE

REMOVE EXISTING

PUMP-OUT AND MANHOLE

RESTORE AREAS TO

EXISTING GRADE

SCHEDULE OF VALUES

BID ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE

CFM-002 PUMP-OUT ASSEMBLY REMOVAL LS 1

CFM-003 24" LINE STOP CONTINGENCY EA 2

CFM-004 ADDITIONAL SEWER PUMP-OUT REMOVAL

MOBILIZATION CONTINGENCY LS 1

CFM-002 PUMP-OUT ASSEMBLY REMOVAL - THIS ITEM SHALL INCLUDE ALL MOBILIZATION, DEMOBILIZATION, EQUIPMENT, MATERIALS, LABOR, AND SERVICES FOR THE COMPLETE REMOVAL OF THE EXISTING MANHOLE STRUCTURE AND LID, PUMP OUT ASSEMBLY PIPING

FROM THE STRUCTURE ALL THE WAY TO THE EXISTING 24-INCH FORCE MAIN, REMOVAL OF THE EXISTING 24" x 24" WYE FITTING, INSTALLATION OF NEW 24" DIAMETER DR18 PVC PIPE AND SOLID SLEEVES WITH RESTRAINED MECHANICAL JOINTS, THEN BACKFILL THE

EXCAVATION USING SELECT FILL, COMPACTING IN 12-INCH MAX. LOOSE LIFTS TO ACHIEVE 98% DENSITY PER ASTM D1557. THIS ALSO

INCLUDE PROPERLY DISPOSING OF ALL REMOVED MATERIALS IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL REGULATIONS.

THIS ITEM SHALL ALSO INCLUDE THE CONTRACTOR HAVING A PROFESSIONAL LICENSED SURVEYOR PROVIDE A SIGNED AND SEALED

PLAN SHOWING THE LOCATION OF THE NEW PIPE INSTALLED.

CFM-003 24" LINE STOP CONTINGENCY - THIS ITEM SHALL INCLUDE ALL COSTS FOR PLACING INTO SERVICE EACH LINE STOP NEEDED TO

ISOLATE FLOW TO ALLOW FOR REMOVAL OF THE EXISTING 24" x 24" WYE FITTING AND PUMP-OUT ASSEMBLY.

CFM-004 ADDITIONAL SEWER PUMP-OUT REMOVAL MOBILIZATION CONTINGENCY - THIS ITEM SHALL INCLUDE ALL COSTS FOR THE

CONTRACTOR TO REMOBILIZE TO THE SITE IN THE EVENT THEY CANNOT ISOLATE THE FORCE MAIN FOR REMOVING THE EXISTING 24" x

24" WYE FITTING AND PUMP-OUT ASSEMBLY

MEASUREMENT AND PAYMENT

N

PROPOSED BRIDGE

TOTAL BID AMOUNT

15200-G-001
g-001
c-101
C-101
2025-06-30T12:08:23-0400
Marc Lean
I am approving this document

File details come from the government source that posted it. Updated .