This is a technical specification document for the City of Fort Myers related to bridge construction for the John Yarbrough Linear Park Phase IV Extension Shared Use Path project. The document addresses temporary end bridge design and construction specifications for a 912-foot multi-span prestressed concrete bridge over SR 886/Colonial Boulevard and a 139-foot prefabricated steel bridge over the 10-mile canal. The project extends approximately 1.83 miles from south of SR 884/Colonial Boulevard to Hanson Street and is funded through the Florida Shared-Use Nonmotorized Trail Network under the Department's FY-24/25 work program.

The specification document establishes technical requirements and engineering standards for temporary bridge end structures, including load-bearing capacity, material specifications, installation procedures, and safety protocols necessary to support bridge construction and eventual removal. These temporary structures are critical components of the overall construction methodology, serving as temporary supports during the installation of the permanent prestressed concrete and steel bridge components that will form the shared-use path infrastructure crossing over the roadway and canal obstacles.

View the file

Other files

File Type Posted
John_Yarbrough_Linear_Park_(JYLP)_Trail_Construction_from_Colonial_Blvd._to_Hanson_St._Rebid_(Sun_Trail_447515-1-54-01)_(Addendum_#3_Revision).pdf PDF
John_Yarbrough_Linear_Park_(JYLP)_Trail_Construction_from_Colonial_Blvd._to_Hanson_St._Rebid_(Sun_Trail_447515-1-54-01).pdf PDF
AGREEMENT-FDOT_CONSTRUCTION_(9-28-26).pdf PDF
251120-59423_Permit_20251230.pdf PDF
20260302-NPR.pdf PDF
CONSTRUCTION_SUPPLEMENTAL_CONDITIONS_2-17-26.pdf PDF
447515-1-54-01_JYLinearPark_StructureCalcs_FY2026-27_SS_2026-09-01.pdf PDF
15200-JYLP_Sewer_Pump-out_Removal_2025-06-30_ML.pdf PDF
447515-1-54-01_JYLinearPark_StructuresPlans_SS_2026-09-01.pdf PDF
440341-1-54-01_JYLinearPark_Structures_GeotechReport_SS_2025-05-09.pdf PDF
447515-1-54-01_JYLinearPark_RoadwayPlans_SS_2026-09-01_(1).pdf PDF
2025000310065_ESMT_FSQ_The_Palms_at_Fort_Myers_LLC_-_JYLP.pdf PDF
JYLP_Valves_Conflict_05_14_2026.pdf PDF
440341-1-54-01_JYLinearPark_Roadway_GeotechReport_SS_2025-05-09.pdf PDF
447515-1-54-01_JYLinearPark_CanalArmoring_SS_2026-09-01.pdf PDF
2025-03-03_100_Bridge2_Peer_Rev_Cert_Letter.pdf PDF
440341-1-54-01_JYLinearPark_FinalBridgeHydraulicsReport_(1).pdf PDF
Completed_Use_and_Occupancy_Agreement.pdf PDF
Temporary_B2_EndBridge.pdf PDF
Temporary_B2_BeginBridge.pdf PDF
JYLP_-_Lee_County-Fort_Myers_Maintenance_Agreement_(LAP_#447515-1).pdf PDF
JYLP_Trail_Extension_SFWMD_FINAL_ERP_.pdf PDF
Completed_Maintenance_Agreement.pdf PDF
Permanent_B2_over_SR884.pdf PDF
11-05-2021_City_of_FM_John_Yarborough_Linear_Park_Trail_405600-001_SFG.pdf PDF
Temporary_B1_BeginBridge.pdf PDF
JYLP_Trail_Extension_SFWMD_FINAL_ERP_Exemption.pdf PDF
Permanent_B1_over_TenMileCanal.pdf PDF
447515-1-54-01_JYLinearPark_SpecsPackage_SS_FY2026-27,_8-24-26.pdf PDF
INSURANCE_REQUIREMENTS_CHART.pdf PDF
trail_map.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mail Processing Center Federal Aviation Administration Southwest Regional Office Obstruction Evaluation Group 10101 Hillwood Parkway Fort Worth, TX 76177

Aeronautical Study No.

2021-ASO-37240-OE

Issued Date: 02/12/2022

Carl Karakos City of Fort Myers 2200 Second Street Fort Myers, FL 33901

**DETERMINATION OF NO HAZARD TO AIR NAVIGATION FOR TEMPORARY STRUCTURE**

The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning:

Structure: Crane Construction Crane Location: Fort Myers, FL Latitude: 26-35-43.87N NAD 83 Longitude: 81-51-20.49W Heights: 18 feet site elevation (SE)

120 feet above ground level (AGL) 138 feet above mean sea level (AMSL)

This aeronautical study revealed that the temporary structure does exceed obstruction standards but would not be a hazard to air navigation provided the condition(s), if any, in this letter is (are) met:

**SEE ATTACHMENT FOR ADDITIONAL CONDITION(S) OR INFORMATION**

This determination is based, in part, on the foregoing description which includes specific coordinates, heights, frequency(ies) and power. Any changes in coordinates, heights and frequencies or use of greater power, except those frequencies specified in the Colo Void Clause Coalition; Antenna System Co-Location; Voluntary Best Practices, effective 21 Nov 2007, will void this determination. Any future construction or alteration, including increase to heights, power or the addition of other transmitters, requires separate notice to the FAA. This determination includes all previously filed frequencies and power for this structure.

This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of a structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the

FAA.

This determination concerns the effect of this temporary structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body.

A copy of this determination will be forwarded to the Federal Aviation Administration Flight Procedures Office if the structure is subject to the issuance of a Notice To Airman (NOTAM).

If you have any questions, please contact our office at (404) 305-6462, or mike.blaich@faa.gov. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2021-ASO-37240-OE

Signature Control No: 494906904-511652016 ( TMP ) Michael Blaich Specialist

Additional Condition(s) or Information for ASN 2021-ASO-37240-OE

Proposal: To construct and/or operate a(n) Crane to a height of 120 feet above ground level, 138 feet above mean sea level.

Location: The structure will be located 0.67 nautical miles northeast of FMY Airport reference point.

Part 77 Obstruction Standard(s) Exceeded and Aeronautical Impacts, if any:

Based on this aeronautical study, the structure would not constitute a substantial adverse effect on aeronautical operations or procedures because it will be temporary. The temporary structure would not be considered a hazard to air navigation provided all of the conditions specified in this determination are strictly met.

As a condition to this Determination, the structure is to be marked/lighted in accordance with FAA Advisory circular 70/7460-1 M, Obstruction Marking and Lighting, flags/red lights-Chapters 3(Marked),4,5(Red),14(Temporary),&15.

Any failure or malfunction that lasts more than thirty (30) minutes and affects a top light or flashing obstruction light, regardless of its position, should be reported immediately to (877) 487-6867 so a Notice to Airmen (NOTAM) can be issued. As soon as the normal operation is restored, notify the same number.

It is required that the FAA be notified 5 business days prior to the temporary structure being erected and again when the structure is removed from the site. Notification should be made to this office through your registered e-filing account. Notification is necessary so that aeronautical procedures can be temporarily modified to accommodate the structure.

NOTIFICATION IS REQUIRED AGAIN THROUGH YOUR REGISTERED E-FILING ACCOUNT

WHEN THE TEMPORARY STRUCTURE IS REMOVED FROM THE SITE FOR NOTICE TO

AIRMAN (NOTAM) CANCELLATION.

It is required that the manager of PAGE FLD, (239) 590-6601 be notified at least 5 business days prior to the temporary structure being erected and again when the structure is removed from the site.

It is required that the manager of Page Field ATCT at 239-936-7867 be notified at least 5 business days prior to the temporary structure being erected and again when the structure is removed from the site. Additionally, please provide contact information for the onsite operator in the event that Air Traffic Control requires the temporary structure to be lowered immediately.

This determination expires on 08/12/2023 unless extended, revised, or terminated by the issuing office.

NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST

BE E-FILED AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. AFTER RE-EVALUATION

OF CURRENT OPERATIONS IN THE AREA OF THE STRUCTURE TO DETERMINE THAT NO

SIGNIFICANT AERONAUTICAL CHANGES HAVE OCCURRED, YOUR DETERMINATION MAY BE

ELIGIBLE FOR ONE EXTENSION OF THE EFFECTIVE PERIOD.

Additional information for ASN 2021-ASO-37240-OE

AGL = Above Ground Level AMSL = Above Mean Sea Level NM = Nautical Miles ARP = Airport Reference Point RWY = Runway ASN = Aeronautical Study Number IFR = Instrument Flight Rule RNAV = Area Navigation GPS = Global Positioning System LPV = Localizer Performance with Vertical Guidance DA = Decision Altitude VFR = Visual Flight Rule ATIS = Automated Terminal Information Service

To use a Temporary Crane to a height of 120 feet AGL, 138 feet AMSL, would be located 1,369 feet from RWY 23 and approximately 0.67 NM northeast of the Page Field Airport (FMY) ARP, Fort Myers, FL.

The proposed temporary crane (used for bridge construction) has been identified as an obstruction under the standards of Title 14, Code of Federal Regulations (CFR), Part 77 as follows:

Section 77.17(a)(3) - a height that increases minimum instrument flight altitudes within a terminal area (TERPS criteria).

RNAV (GPS) RWY 23, (missed approach penetration) LPV DA from 274 to 342.

Section 77.17 (a) (5): The surface of a takeoff and landing area of an airport or any imaginary surface established under 77.19, 77.21, or 77.23. However, no part of the takeoff or landing area itself will be considered an obstruction.

Section 77.19 (e) FMY: Transition Surface. These surfaces extend outward and upward at right angles to the runway centerline and the runway centerline extended at a slope of 7 to 1 from the sides of the primary surface and from the sides of the approach surfaces. Transitional surfaces for those portions of the precision approach surface which project through and beyond the limits of the conical surface extend a distance of 5,000 feet measured horizontally from the edge of the approach surface and at right angles to the runway centerline. The proposal will exceed Runway 05/23 Transition Surface by 71 feet.

The proposals would also be located within the traffic pattern airspace (TPA) for all categories of aircraft using FMY. The proposals would exceed the RWY 05/23 Transitional Surface by 10 feet.

The temporary crane does not constitute substantial adverse effect because the equipment would be temporary and would not be a hazard to air navigation provided the conditions are strictly met.

Additional conditions:

1. The temporary crane operator shall contact the FMY Airport Manager at 239-590-6601 a minimum of 5-business days prior to the temporary crane being raised, and when operations are complete.

2. The temporary crane operator shall contact FMY Air Traffic Control Tower (ATCT) Manager at 239-936-7867 a minimum of 5-business days prior to the temporary crane being raised, daily when the crane is raised, and when operations are complete and the crane is lowered each day.

3. The temporary crane operator shall maintain a form of direct two-way communications at all times by providing his phone number on initial contact.

4. Hours of operation shall be determined by the Airport Manager and ATCT.

5. Information to pilots regarding the location and height of the crane, and any runway related actions via local Notice to Airmen (NOTAM) and ATIS shall be at the discretion of the Airport Manager/ATCT.

6. The temporary crane shall be lowered to the ground when not in use, between the hours determined by the Airport Manager and the ATCT, in conditions less than VFR (contact the ATCT for updated weather before raising the crane), during inclement weather, or when instructed to do so by the ATCT.

7. The sponsor shall ensure the crane, as a condition to this Determination, the structure is to be marked/lighted in accordance with FAA Advisory circular 70/7460-1 M, Obstruction Marking and Lighting, flags/red lights- Chapters 3 (Marked), 4, 5 (Red), 14 (Temporary), and 15. The advisory circular is available for viewing at the following website: https://oeaaa.faa.gov.

8. The method for "e-filing" a NOTAM request to mitigate the IFR impacts must be followed as outlined below at least 5-business days in advance by the Sponsor or Representative to ensure the safety of air navigation and to personnel and property on the ground. The Sponsor is responsible for requesting extension of NOTAM. The NOTAM must also be cancelled in the same manner when operations are complete. The sponsor is responsible for ensuring the NOTAM is e-filed accordingly through the OE/AAA system.

Login to: oeaaa.faa.gov web site

Click-Temporary Structure Notification

Enter the aeronautical study number (ASN) & click search

Click - Add 7460-2

Click- Request a NOTAM

Enter all information & save

9. Notify mike.blaich@faa.gov, and luke.w.wray@faa.gov when crane operations are complete and the equipment removed from the work site.