11-05-2021_City_of_FM_John_Yarborough_Linear_Park_Trail_405600-001_SFG.pdf

PDF 27 MB Posted

Attached to
John Yarbrough Linear Park (JYLP) Trail Construction from Colonial Blvd. to Hanson St. Rebid (Sun Trail 447515-1-54-01)
Solicitation number
ITB 26-061
Issued by
Lee County, Fort Lauderdale City, Florida

About this file

This is a Scope of Work document prepared by the City of Fort Myers for the John Yarbrough Linear Park (JYLP) Trail Construction project, Phase IV Extension. The project encompasses the construction of a shared-use path and bridge improvements extending approximately 1.83 miles from south of State Road 884/Colonial Boulevard to Hanson Street. The scope includes two major structural components: a 912-foot multi-span prestressed concrete bridge spanning SR 886/Colonial Boulevard and a 139-foot prefabricated steel bridge structure crossing the 10-mile canal. The project is funded through the Florida Shared-Use Nonmotorized Trail Network under the Department's FY-24/25 work program. The document establishes technical specifications, performance standards, and construction requirements that qualified respondents must address in their submittals to ensure compliance with project objectives and quality standards.

The project represents a rebid effort for the Sun Trail 447515-1-54-01 initiative, indicating that previous solicitation attempts require re-execution. Contractors responding to this opportunity must demonstrate expertise in complex infrastructure construction involving both bridge engineering and trail development. The work involves coordination with state roadway systems and canal infrastructure, requiring respondents to possess relevant experience with similar multi-modal transportation projects and proficiency in managing projects with significant environmental and structural considerations. The funding mechanism through the Florida Department's shared-use trail network program indicates state-level support and oversight of the construction standards and project delivery requirements.

View the file

Other files

File Type Posted
John_Yarbrough_Linear_Park_(JYLP)_Trail_Construction_from_Colonial_Blvd._to_Hanson_St._Rebid_(Sun_Trail_447515-1-54-01)_(Addendum_#3_Revision).pdf PDF
John_Yarbrough_Linear_Park_(JYLP)_Trail_Construction_from_Colonial_Blvd._to_Hanson_St._Rebid_(Sun_Trail_447515-1-54-01).pdf PDF
AGREEMENT-FDOT_CONSTRUCTION_(9-28-26).pdf PDF
251120-59423_Permit_20251230.pdf PDF
20260302-NPR.pdf PDF
CONSTRUCTION_SUPPLEMENTAL_CONDITIONS_2-17-26.pdf PDF
447515-1-54-01_JYLinearPark_StructureCalcs_FY2026-27_SS_2026-09-01.pdf PDF
15200-JYLP_Sewer_Pump-out_Removal_2025-06-30_ML.pdf PDF
447515-1-54-01_JYLinearPark_StructuresPlans_SS_2026-09-01.pdf PDF
440341-1-54-01_JYLinearPark_Structures_GeotechReport_SS_2025-05-09.pdf PDF
447515-1-54-01_JYLinearPark_RoadwayPlans_SS_2026-09-01_(1).pdf PDF
2025000310065_ESMT_FSQ_The_Palms_at_Fort_Myers_LLC_-_JYLP.pdf PDF
JYLP_Valves_Conflict_05_14_2026.pdf PDF
440341-1-54-01_JYLinearPark_Roadway_GeotechReport_SS_2025-05-09.pdf PDF
447515-1-54-01_JYLinearPark_CanalArmoring_SS_2026-09-01.pdf PDF
2025-03-03_100_Bridge2_Peer_Rev_Cert_Letter.pdf PDF
440341-1-54-01_JYLinearPark_FinalBridgeHydraulicsReport_(1).pdf PDF
Completed_Use_and_Occupancy_Agreement.pdf PDF
Temporary_B2_EndBridge.pdf PDF
Temporary_B2_BeginBridge.pdf PDF
JYLP_-_Lee_County-Fort_Myers_Maintenance_Agreement_(LAP_#447515-1).pdf PDF
JYLP_Trail_Extension_SFWMD_FINAL_ERP_.pdf PDF
Completed_Maintenance_Agreement.pdf PDF
Permanent_B2_over_SR884.pdf PDF
Temporary_B1_BeginBridge.pdf PDF
JYLP_Trail_Extension_SFWMD_FINAL_ERP_Exemption.pdf PDF
Temporary_B1_EndBridge.pdf PDF
Permanent_B1_over_TenMileCanal.pdf PDF
447515-1-54-01_JYLinearPark_SpecsPackage_SS_FY2026-27,_8-24-26.pdf PDF
INSURANCE_REQUIREMENTS_CHART.pdf PDF
trail_map.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .