JYLP_-_Lee_County-Fort_Myers_Maintenance_Agreement_(LAP_#447515-1).pdf

PDF 10 MB Posted

Attached to
John Yarbrough Linear Park (JYLP) Trail Construction from Colonial Blvd. to Hanson St. Rebid (Sun Trail 447515-1-54-01)
Solicitation number
ITB 26-061
Issued by
Lee County, Fort Lauderdale City, Florida

About this file

This is a maintenance agreement document between Lee County and the City of Fort Myers related to the John Yarbrough Linear Park (JYLP) Trail Construction project. The agreement establishes the operational and maintenance responsibilities following the completion of Phase IV Extension Shared Use Path and Bridge Improvements, which will extend approximately 1.83 miles from south of SR 884/Colonial Boulevard to Hanson Street. The project includes construction of a 912-foot multi-span prestressed concrete bridge over SR 886/Colonial Boulevard and a 139-foot prefabricated steel bridge structure over the 10-mile canal. The maintenance agreement outlines the terms under which the City of Fort Myers will assume responsibility for ongoing maintenance and operations of the completed trail infrastructure and bridge structures upon project completion.

The agreement establishes funding and maintenance responsibilities between Lee County and the City of Fort Myers, with the project funded through the Florida Shared-Use Nonmotorized Trail Network under the Department's FY-24/25 work program. The maintenance agreement specifies the conditions, obligations, and procedures for the City of Fort Myers to maintain the trail system and bridge structures in operational condition following project handover. The document addresses long-term stewardship requirements to ensure the trail infrastructure remains functional and safe for public use as part of the regional nonmotorized transportation network.

View the file

Other files

File Type Posted
John_Yarbrough_Linear_Park_(JYLP)_Trail_Construction_from_Colonial_Blvd._to_Hanson_St._Rebid_(Sun_Trail_447515-1-54-01)_(Addendum_#3_Revision).pdf PDF
John_Yarbrough_Linear_Park_(JYLP)_Trail_Construction_from_Colonial_Blvd._to_Hanson_St._Rebid_(Sun_Trail_447515-1-54-01).pdf PDF
AGREEMENT-FDOT_CONSTRUCTION_(9-28-26).pdf PDF
251120-59423_Permit_20251230.pdf PDF
20260302-NPR.pdf PDF
CONSTRUCTION_SUPPLEMENTAL_CONDITIONS_2-17-26.pdf PDF
447515-1-54-01_JYLinearPark_StructureCalcs_FY2026-27_SS_2026-09-01.pdf PDF
15200-JYLP_Sewer_Pump-out_Removal_2025-06-30_ML.pdf PDF
447515-1-54-01_JYLinearPark_StructuresPlans_SS_2026-09-01.pdf PDF
440341-1-54-01_JYLinearPark_Structures_GeotechReport_SS_2025-05-09.pdf PDF
447515-1-54-01_JYLinearPark_RoadwayPlans_SS_2026-09-01_(1).pdf PDF
2025000310065_ESMT_FSQ_The_Palms_at_Fort_Myers_LLC_-_JYLP.pdf PDF
JYLP_Valves_Conflict_05_14_2026.pdf PDF
440341-1-54-01_JYLinearPark_Roadway_GeotechReport_SS_2025-05-09.pdf PDF
447515-1-54-01_JYLinearPark_CanalArmoring_SS_2026-09-01.pdf PDF
2025-03-03_100_Bridge2_Peer_Rev_Cert_Letter.pdf PDF
440341-1-54-01_JYLinearPark_FinalBridgeHydraulicsReport_(1).pdf PDF
Completed_Use_and_Occupancy_Agreement.pdf PDF
Temporary_B2_EndBridge.pdf PDF
Temporary_B2_BeginBridge.pdf PDF
JYLP_Trail_Extension_SFWMD_FINAL_ERP_.pdf PDF
Completed_Maintenance_Agreement.pdf PDF
Permanent_B2_over_SR884.pdf PDF
11-05-2021_City_of_FM_John_Yarborough_Linear_Park_Trail_405600-001_SFG.pdf PDF
Temporary_B1_BeginBridge.pdf PDF
JYLP_Trail_Extension_SFWMD_FINAL_ERP_Exemption.pdf PDF
Temporary_B1_EndBridge.pdf PDF
Permanent_B1_over_TenMileCanal.pdf PDF
447515-1-54-01_JYLinearPark_SpecsPackage_SS_FY2026-27,_8-24-26.pdf PDF
INSURANCE_REQUIREMENTS_CHART.pdf PDF
trail_map.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .