JYLP_Valves_Conflict_05_14_2026.pdf

PDF 55 KB Posted

Attached to
John Yarbrough Linear Park (JYLP) Trail Construction from Colonial Blvd. to Hanson St. Rebid (Sun Trail 447515-1-54-01)
Solicitation number
ITB 26-061
Issued by
Lee County, Fort Lauderdale City, Florida

About this file

This is a utility conflict analysis document for the City of Fort Myers related to the John Yarbrough Linear Park (JYLP) Trail Construction project, specifically addressing force main adjustments required due to design conflicts with existing sanitary sewer and air release valve infrastructure. The document identifies eight utility facilities requiring adjustment along the proposed trail alignment between Colonial Boulevard and Hanson Street, with conflicts occurring at various station locations spanning approximately 1.83 miles. The utility adjustments include five sanitary sewer valves and three FM air release valves, with most facilities requiring grade adjustment to accommodate the finished trail surface. One air release valve at station 361+99.81 requires relocation rather than simple grade adjustment. The adjustments are categorized under two pay items: Pay Item 1080-24-500 for grade adjustments and Pay Item 1080-24-400 for relocations. The analysis was revised as of December 7, 2022, and is associated with Florida Shared-Use Nonmotorized Trail Network funding under the Department's FY-24/25 work program.

The document serves as design coordination documentation to ensure that utility infrastructure does not conflict with the proposed 912-foot prestressed concrete bridge over SR 886/Colonial Boulevard and the 139-foot prefabricated steel bridge over 10-mile canal. This conflict analysis is essential for constructability planning and cost estimation, as contractors must account for the identification and adjustment of these utilities within their project budgets and schedules. The specific locations, distances from the proposed trail, and adjustment requirements provide critical information for the successful execution of the trail construction project and coordination between the City of Fort Myers and relevant utility operators.

View the file

Other files

File Type Posted
John_Yarbrough_Linear_Park_(JYLP)_Trail_Construction_from_Colonial_Blvd._to_Hanson_St._Rebid_(Sun_Trail_447515-1-54-01)_(Addendum_#3_Revision).pdf PDF
John_Yarbrough_Linear_Park_(JYLP)_Trail_Construction_from_Colonial_Blvd._to_Hanson_St._Rebid_(Sun_Trail_447515-1-54-01).pdf PDF
AGREEMENT-FDOT_CONSTRUCTION_(9-28-26).pdf PDF
251120-59423_Permit_20251230.pdf PDF
20260302-NPR.pdf PDF
CONSTRUCTION_SUPPLEMENTAL_CONDITIONS_2-17-26.pdf PDF
447515-1-54-01_JYLinearPark_StructureCalcs_FY2026-27_SS_2026-09-01.pdf PDF
15200-JYLP_Sewer_Pump-out_Removal_2025-06-30_ML.pdf PDF
447515-1-54-01_JYLinearPark_StructuresPlans_SS_2026-09-01.pdf PDF
440341-1-54-01_JYLinearPark_Structures_GeotechReport_SS_2025-05-09.pdf PDF
447515-1-54-01_JYLinearPark_RoadwayPlans_SS_2026-09-01_(1).pdf PDF
2025000310065_ESMT_FSQ_The_Palms_at_Fort_Myers_LLC_-_JYLP.pdf PDF
440341-1-54-01_JYLinearPark_Roadway_GeotechReport_SS_2025-05-09.pdf PDF
447515-1-54-01_JYLinearPark_CanalArmoring_SS_2026-09-01.pdf PDF
2025-03-03_100_Bridge2_Peer_Rev_Cert_Letter.pdf PDF
440341-1-54-01_JYLinearPark_FinalBridgeHydraulicsReport_(1).pdf PDF
Completed_Use_and_Occupancy_Agreement.pdf PDF
Temporary_B2_EndBridge.pdf PDF
Temporary_B2_BeginBridge.pdf PDF
JYLP_-_Lee_County-Fort_Myers_Maintenance_Agreement_(LAP_#447515-1).pdf PDF
JYLP_Trail_Extension_SFWMD_FINAL_ERP_.pdf PDF
Completed_Maintenance_Agreement.pdf PDF
Permanent_B2_over_SR884.pdf PDF
11-05-2021_City_of_FM_John_Yarborough_Linear_Park_Trail_405600-001_SFG.pdf PDF
Temporary_B1_BeginBridge.pdf PDF
JYLP_Trail_Extension_SFWMD_FINAL_ERP_Exemption.pdf PDF
Temporary_B1_EndBridge.pdf PDF
Permanent_B1_over_TenMileCanal.pdf PDF
447515-1-54-01_JYLinearPark_SpecsPackage_SS_FY2026-27,_8-24-26.pdf PDF
INSURANCE_REQUIREMENTS_CHART.pdf PDF
trail_map.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sanitary Sewer Valve 312+05.50 18.13' RT. Proposed Trail Adjust to finished grade - Pay Item # 1080-24-500

FM Air Release Valve 312+13.72 12.44' RT. Proposed Trail/Unpaved Shoulder Adjust to finished grade - Pay Item # 1080-24-500

Sanitary Sewer Valve 334+04.59 2.45' LT. Proposed Trail/Unpaved Shoulder Adjust to finished grade - Pay Item # 1080-24-500

FM Air Release Valve 334+08.42 4.86' LT. Proposed Trail/Unpaved Shoulder Adjust to finished grade - Pay Item # 1080-24-500

Sanitary Sewer Valve 361+94.62 9.74' RT. Proposed Trail Adjust to finished grade - Pay Item # 1080-24-500

FM Air Release Valve 361+99.81 3.77' RT. Proposed Trail Relocate - Pay Item # 1080-24-400

Sanitary Sewer Valve 362+62.21 3.17' RT. Proposed Trail Adjust to finished grade - Pay Item # 1080-24-500

Sanitary Sewer Valve 400+79.89 1.35' LT. Proposed Trail Adjust to finished grade - Pay Item # 1080-24-500

FM Air Release Valve 400+85.08 5.78' LT. Proposed Trail Adjust to finished grade - Pay Item # 1080-24-500

Offset CommentsDesign Element in Conflict With Utility Facility

(type, size, material) Station

City of Fort Myers

FPID 447515-1-54-01 - John Yarbrough Linear Park Multi-Use Trail Extension

Force Main Adjustments

(Revised 12/7/2022)

727262180

File details come from the government source that posted it. Updated .