251120-59423_Permit_20251230.pdf

PDF 162 KB Posted

Attached to
John Yarbrough Linear Park (JYLP) Trail Construction from Colonial Blvd. to Hanson St. Rebid (Sun Trail 447515-1-54-01)
Solicitation number
ITB 26-061
Issued by
Lee County, Fort Lauderdale City, Florida

About this file

This is an Environmental Resource General Permit issued by the South Florida Water Management District to the City of Fort Myers for the John Yarbrough Linear Park Pedestrian Bridge project located in Lee County, Florida. The permit authorizes construction of two 12-foot-wide multi-use trail bridges—one spanning the Ten Mile Canal and one spanning Colonial Boulevard (SR 884)—as part of the extension of the existing John Yarbrough Linear Park Trail from Colonial Boulevard to Hanson Street, approximately 1.83 miles in length. The project includes a 912-foot multi-span prestressed concrete bridge over Colonial Boulevard and a 139-foot prefabricated steel bridge structure over the Ten Mile Canal. The permit was issued on December 30, 2025, and is valid for five years, expiring December 30, 2030. The authorization is conditioned upon compliance with all general and specific conditions outlined in the permit, including erosion and sediment control requirements, protection of listed species, maintenance of hydraulic openings to prevent downstream scour, and preservation of navigational clearances.

The permit is subject to extensive environmental compliance requirements, including performance-based erosion and sediment control best management practices to be implemented immediately prior to, during, and after construction. Permittee responsibilities include maintaining the project in accordance with approved plans, restoring disturbed wetland areas to original elevations with native vegetation within seven days of construction completion, and implementing protective measures for federally and state-listed aquatic species such as manatees and marine turtles. No dredging of access or work channels is authorized, and temporary fill roads cannot be constructed waterward of mean high water. The permit does not authorize construction of additional motorized vehicle travel lanes or new roadway corridors. The City of Fort Myers is responsible for obtaining all required federal, state, local, and special district authorizations prior to construction commencement and must comply with all applicable laws governing listed species protection and state water quality standards. Persons may request an administrative hearing within 21 days of receipt of this permit notice or seek judicial review within 30 days of final agency action.

View the file

Other files

File Type Posted
John_Yarbrough_Linear_Park_(JYLP)_Trail_Construction_from_Colonial_Blvd._to_Hanson_St._Rebid_(Sun_Trail_447515-1-54-01)_(Addendum_#3_Revision).pdf PDF
John_Yarbrough_Linear_Park_(JYLP)_Trail_Construction_from_Colonial_Blvd._to_Hanson_St._Rebid_(Sun_Trail_447515-1-54-01).pdf PDF
AGREEMENT-FDOT_CONSTRUCTION_(9-28-26).pdf PDF
20260302-NPR.pdf PDF
CONSTRUCTION_SUPPLEMENTAL_CONDITIONS_2-17-26.pdf PDF
447515-1-54-01_JYLinearPark_StructureCalcs_FY2026-27_SS_2026-09-01.pdf PDF
15200-JYLP_Sewer_Pump-out_Removal_2025-06-30_ML.pdf PDF
447515-1-54-01_JYLinearPark_StructuresPlans_SS_2026-09-01.pdf PDF
440341-1-54-01_JYLinearPark_Structures_GeotechReport_SS_2025-05-09.pdf PDF
447515-1-54-01_JYLinearPark_RoadwayPlans_SS_2026-09-01_(1).pdf PDF
2025000310065_ESMT_FSQ_The_Palms_at_Fort_Myers_LLC_-_JYLP.pdf PDF
JYLP_Valves_Conflict_05_14_2026.pdf PDF
440341-1-54-01_JYLinearPark_Roadway_GeotechReport_SS_2025-05-09.pdf PDF
447515-1-54-01_JYLinearPark_CanalArmoring_SS_2026-09-01.pdf PDF
2025-03-03_100_Bridge2_Peer_Rev_Cert_Letter.pdf PDF
440341-1-54-01_JYLinearPark_FinalBridgeHydraulicsReport_(1).pdf PDF
Completed_Use_and_Occupancy_Agreement.pdf PDF
Temporary_B2_EndBridge.pdf PDF
Temporary_B2_BeginBridge.pdf PDF
JYLP_-_Lee_County-Fort_Myers_Maintenance_Agreement_(LAP_#447515-1).pdf PDF
JYLP_Trail_Extension_SFWMD_FINAL_ERP_.pdf PDF
Completed_Maintenance_Agreement.pdf PDF
Permanent_B2_over_SR884.pdf PDF
11-05-2021_City_of_FM_John_Yarborough_Linear_Park_Trail_405600-001_SFG.pdf PDF
Temporary_B1_BeginBridge.pdf PDF
JYLP_Trail_Extension_SFWMD_FINAL_ERP_Exemption.pdf PDF
Temporary_B1_EndBridge.pdf PDF
Permanent_B1_over_TenMileCanal.pdf PDF
447515-1-54-01_JYLinearPark_SpecsPackage_SS_FY2026-27,_8-24-26.pdf PDF
INSURANCE_REQUIREMENTS_CHART.pdf PDF
trail_map.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

South Florida Water Management District Environmental Resource General Permit No. 36-115618-P

Date Issued: December 30, 2025

Permittee: City of Fort Myers

2200 Second Street Fort Myers, FL 33901

Project:

John Yarbrough Linear Park Pedestrian Bridge

Location:

Lee County, See Exhibit 1

Application No. 251120-59423

Description: The project will involve two, 12-foot-wide, multi-use trail bridges, one of which will traverse from the eastern to the western side of the Ten Mile Canal, and the second which will span Colonial Boulevard. See Exhibit No. 1.0 for a Project Location Map. The proposed project is associated with the extension of the existing John Yarbrough Linear Park Trail from Colonial Boulevard (SR 884) to Hanson Street. Please refer to Exhibit No. 2.0 for plans. The issuance of this General Permit constitutes certification of compliance with state water quality standards in accordance with Rule 62-330.062, FAC.

Rule: 62-330.443, F.A.C.: General Permit to the Florida Department of Transportation, Counties, and Municipalities for Minor Bridge Alteration, Placement, Replacement, Removal, Maintenance, and Operation

Expiration: December 30, 2030

Your application to use a General Environmental Resource Permit has been approved. This action is taken based on Chapter 373, Part IV, of Florida Statutes (F.S.) and the rules in Chapter 62-330, Florida Administrative Code (F.A.C.). Please read this entire agency action thoroughly and understand its contents.

This permit is subject to:

Not receiving a filed request for a Chapter 120, F.S., administrative hearing.

The attached General Conditions for Environmental Resource General Permits.

The attached Specific Conditions.

All referenced Exhibits.

Should you object to these conditions, please refer to the attached "Notice of Rights" which addresses the procedures to be followed if you desire a public hearing or other review of the proposed agency action.

Please contact this office if you have any questions concerning this matter. If we do not hear from you in accordance with the "Notice of Rights", we will assume that you concur with the District's action.

Certificate of Service

I hereby certify that this written notice has been mailed or electronically transmitted to the Permittee (and the persons listed in the distribution list) on December 30, 2025 , in accordance with Section 120.60(3), F.S.

Notice was also electronically posted on this date through a link on the home page of the District's website ( www.sfwmd.gov/regpermitting).

Jonathan Wadas, P.E.

Section Leader http://www.sfwmd.gov/regpermitting

General Conditions for All General Permits, 62-330.405, F.A.C.

1. The general permit is valid only for the specific activity indicated. Any deviation from the specified activity and the conditions for undertaking that activity shall constitute a violation of the permit and shall subject the permittee to enforcement action and revocation of the permit under Chapter 373, F.S.

2. The general permit does not eliminate the necessity to obtain any required federal, state, local and special district authorizations prior to the start of any construction, alteration, operation, maintenance, removal or abandonment authorized by this permit; and it does not authorize any violation of any other applicable federal, state, local, or special district laws (including, but not limited to, those governing the “take” of listed species).

3. This general permit does not convey to the permittee or create in the permittee any property right, or any interest in real property, nor does it authorize any entrance upon or activities on property which is not owned or controlled by the permittee, or convey any rights or privileges other than those specified in the general permit.

4. The general permit does not relieve the permittee from liability and penalties when the permitted activity causes harm or injury to: human health or welfare; animal, plant or aquatic life; or property. It does not allow the permittee to cause pollution that violates state water quality standards.

5. Section 253.77, F.S., provides that a person may not commence any excavation, construction, or other activity involving the use of state-owned or other lands of the state, the title to which is vested in the Board of Trustees of the Internal Improvement Trust Fund without obtaining the required consent, lease, easement, or other form of authorization authorizing the proposed use.

Therefore, the permittee is responsible for obtaining any necessary authorizations from the Board of Trustees prior to commencing activity on state-owned lands.

6. The authorization to conduct activities under a general permit may be modified, suspended or revoked in accordance with Chapter 120, F.S., and Section 373.429, F.S.

7. The general permit is not transferable to a new third party. To be used by a different permittee, a new notice to use a general permit must be submitted in accordance with rule 62-330.402, F.A.C. Activities constructed in accordance with the terms and conditions of a general permit are automatically authorized to be operated and maintained by the permittee and subsequent owners in accordance with subsection 62-330.340(1), F.A.C. Any person holding the general permit, persons working under the general permit, and owners of land while work is conducted under the general permit shall remain liable for any corrective actions that may be required as a result of any permit violations prior to sale, conveyance, or other transfer of ownership or control of the permitted project, activity, or the real property at which the permitted project or activity is located.

8. Upon reasonable notice to the permittee, Agency staff with proper identification shall have permission to enter, inspect, sample and test the permitted system to ensure conformity with the plans and specifications approved by the general permit.

9. The permittee shall maintain any permitted project or activity in accordance with the plans submitted to the Agency and authorized in this general permit.

10. A permitee's right to conduct a specific activity under this general permit is authorized for a duration of five years.

11. Activities shall be conducted in a manner that does not cause or contribute to violations of

Permit No: 36-115618-P, Page 2 state water quality standards. Performance-based erosion and sediment control best management practices shall be implemented and maintained immediately prior to, during, and after construction as needed to stabilize all disturbed areas, including other measures specified in the permit to prevent adverse impacts to the water resources and adjacent lands.

Erosion and sediment control measures shall be installed and maintained in accordance with the State of Florida Erosion and Sediment Control Designer and Reviewer Manual (Florida Department of Environmental Protection and Florida Department of Transportation, June 2007), available at https://www.flrules.org/Gateway/reference.asp?No=Ref-04227, and the Florida Stormwater Erosion and Sedimentation Control Inspector’s Manual (Florida Department of Environmental Protection, Nonpoint Source Management Section, Tallahassee, Florida, July 2008), available at http://publicfiles.dep.state.fl.us/DEAR/ Stormwater_Training_Docs/erosion-inspectors-manual.pdf.

12. Unless otherwise specified in the general permit, temporary vehicular access within wetlands during construction shall be performed using vehicles generating minimum ground pressure to minimize rutting and other environmental impacts. Within forested wetlands, the permittee shall choose alignments that minimize the destruction of mature wetland trees to the greatest extent practicable. When needed to prevent rutting or soil compaction, access vehicles shall be operated on wooden, composite, metal, or other non-earthen construction mats. In all cases, access in wetlands shall comply with the following:

(a) Access within forested wetlands shall not include the cutting or clearing of any native wetland tree having a diameter four inches or greater at breast height;

(b) The maximum width of the construction access area shall be limited to 15 feet;

(c) All mats shall be removed as soon as practicable after equipment has completed passage through, or work has been completed, at any location along the alignment of the project, but in no case longer than seven days after equipment has completed work or passage through that location; and

(d) Areas disturbed for access shall be restored to natural grades immediately after the maintenance or repair is completed.

13. Barges or other work vessels used to conduct in-water activities shall be operated in a manner that prevents unauthorized dredging, water quality violations, and damage to submerged aquatic communities.

14. The construction, alteration, or use of the authorized project shall not adversely impede navigation or create a navigational hazard in the water body.

15. Except where specifically authorized in the general permit, activities must not:

(a) Impound or obstruct existing water flow, cause adverse impacts to existing surface water storage and conveyance capabilities, or otherwise cause adverse water quantity or flooding impacts to receiving water and adjacent lands; or

(b) Cause an adverse impact to the maintenance of surface or ground water levels or surface water flows established pursuant to section 373.042, F.S., or a Works of the District established pursuant to section 373.086, F.S.

16. If prehistoric or historic artifacts, such as pottery or ceramics, projectile points, stone tools, dugout canoes, metal implements, historic building materials, or any other physical remains that could be associated with Native American, early European, or American settlement are encountered at any time within the project site area, the permitted project shall cease all activities involving subsurface disturbance in the vicinity of the discovery. The permittee or other designee shall contact the Florida Department of State, Division of Historical Resources, Compliance Review Section (DHR), at (850)245-6333, as well as the appropriate permitting agency office. Project activities shall not resume without verbal or written authorization from the Division of Historical Resources. If unmarked human remains are encountered, all work shall stop immediately and the proper authorities notified in accordance with section 872.05, F.S.

17. The activity must be capable, based on generally accepted engineering and scientific

Permit No: 36-115618-P, Page 3 principles, of being performed and of functioning as proposed, and must comply with any applicable District special basin and geographic area criteria.

18. The permittee shall comply with the following when performing work within waters accessible to federally- or state-listed aquatic species, such as manatees, marine turtles, smalltooth sawfish, and Gulf sturgeon:

(a) All vessels associated with the project shall operate at “Idle Speed/No Wake” at all times while in the work area and where the draft of the vessels provides less than a four-foot clearance from the bottom. All vessels will follow routes of deep water whenever possible.

(b) All deployed siltation or turbidity barriers shall be properly secured, monitored, and maintained to prevent entanglement or entrapment of listed species.

(c) All in-water activities, including vessel operation, must be shut down if a listed species comes within 50 feet of the work area. Activities shall not resume until the animal(s) has moved beyond a 50-foot radius of the in-water work, or until 30 minutes elapses since the last sighting within 50 feet. Animals must not be herded away or harassed into leaving. All onsite project personnel are responsible for observing water-related activities for the presence of listed species.

(d) Any listed species that is killed or injured by work associated with activities performed shall be reported immediately to the Florida Fish and Wildlife Conservation Commission (FWC) Hotline at 1(888)404-3922 and ImperiledSpecies@myFWC.com.

(e) Whenever there is a spill or frac-out of drilling fluid into waters accessible to the above species during a directional drilling operation, the FWC shall be notified at ImperiledSpecies@myfwc.com with details of the event within 24 hours following detection of the spill or frac-out.

19. The permittee shall hold and save the Agency harmless from any and all damages, claims, or liabilities which may arise by reason of the construction, alteration, operation, maintenance, removal, abandonment or use of any activity authorized by the general permit.

20. The permittee shall immediately notify the Agency in writing of any submitted information that is discovered to be inaccurate.

Permit No: 36-115618-P, Page 4

Specific Conditions for General Permits, 62-330.443, F.A.C.

1. (a) No dredging of access or work channels is authorized by this general permit;

(b) Temporary fill roads shall not be constructed waterward of mean high water or ordinary high water;

(c) All fill placed in wetlands, other than fill on which a bridge or approach is constructed, shall be regraded to the original wetland elevations and revegetated with native wetland species endemic to adjoining, undisturbed wetlands, within seven days of completion of construction.

Within “clear zones,” revegetation shall be with native herbaceous species endemic to adjoining, undisturbed wetlands. During the five-year period following the initial planting or restoration of the site, these areas shall be maintained to ensure planted or naturally recruited native wetland species are surviving and growing, and that the areal coverage of exotic and invasive species constitutes less than 10% areal coverage;

(d) Hydraulic openings of bridges shall be sufficient to prevent downstream scour, increased downstream water velocities, and increased flood elevations on the property of others;

(e) Minimum horizontal and vertical navigational clearances on bridges over navigable waters of the United States shall be established in accordance with procedures outlined in Chapter 2 of the U.S. Coast Guard Bridge Administration Manual, COMDTINST M16590.5C, (March 26, 2004), and in no circumstance shall placement or replacement of a bridge result in a reduction of horizontal and vertical navigational clearances;

(f) Replacement or modification of a bridge that includes changes in the configuration of the bridge and fill areas due to changes in materials, construction techniques, or meeting current construction codes or safety standards are authorized under this permit. Any connecting road expansion or alteration associated with such replacement or modification must be authorized by a separate general or individual permit under chapter 62-330, F.A.C., as applicable, before the start of construction; and

(g) This general permit does not authorize the construction of additional travel lanes for motorized vehicles, except that any single-lane bridge may be widened to two travel lanes, provided the bridge widening does not exceed that reasonably necessary to match the existing travel lane alignment of a two-lane road. This permit does not authorize new corridors or roadway connections where there is no existing structure over wetlands or waterways.

Permit No: 36-115618-P, Page 5

Distribution List

Ashley Gorham

Robert Whitman, Kisinger Campo & Associates Corp

Karina Gelinas

Stephen Mcgucken, Kisinger Campo & Associates, Corp

Audubon of Florida

Div of Recreation and Park - District 4

US Army Corps of Engineers - Permit Section

Permit No: 36-115618-P, Page 6

Exhibits

The following exhibits to this permit are incorporated by reference. The exhibits can be viewed by clicking on the links below or by visiting the District's RegPermitting website (www.sfwmd.gov/ regpermitting) and searching under this application number 251120-59423 .

Exhibit No. 1.0 Location Map

Exhibit No. 2.0 Plans

Permit No: 36-115618-P, Page 7 http://www.sfwmd.gov/regpermitting http://www.sfwmd.gov/regpermitting https://api.sfwmd.gov/v1/service/cms/documents/0900eeea96eb4dc0/content https://api.sfwmd.gov/v1/service/cms/documents/0900eeea96eb4eb0/content

NOTICE OF RIGHTS

As required by Chapter 120, Florida Statutes, the following provides notice of the opportunities which may be available for administrative hearing pursuant to Sections 120.569 and 120.57, Florida Statutes, or judicial review pursuant to Section 120.68, Florida Statutes, when the substantial interests of a party are determined by an agency. Please note that this Notice of Rights is not intended to provide legal advice. Some of the legal proceedings detailed below may not be applicable or appropriate for your situation. You may wish to consult an attorney regarding your legal rights.

RIGHT TO REQUEST ADMINISTRATIVE HEARING

A person whose substantial interests are or may be affected by the South Florida Water Management District’s (District) action has the right to request an administrative hearing on that action pursuant to Sections 120.569 and 120.57, Florida Statutes. Persons seeking a hearing on a District decision which affects or may affect their substantial interests shall file a petition for hearing in accordance with the filing instructions set forth herein within 21 days of receipt of written notice of the decision unless one of the following shorter time periods apply: (1) within 14 days of the notice of consolidated intent to grant or deny concurrently reviewed applications for environmental resource permits and use of sovereign submerged lands pursuant to Section 373.427, Florida Statutes; or (2) within 14 days of service of an Administrative Order pursuant to Section 373.119(1), Florida Statutes. "Receipt of written notice of agency decision" means receipt of written notice through mail, electronic mail, posting, or publication that the District has taken or intends to take final agency action. Any person who receives written notice of a District decision and fails to file a written request for hearing within the timeframe described above waives the right to request a hearing on that decision.

If the District takes final agency action that materially differs from the noticed intended agency decision, persons who may be substantially affected shall, unless otherwise provided by law, have an additional point of entry pursuant to Rule 28-106.111, Florida Administrative Code.

Any person to whom an emergency order is directed pursuant to Section 373.119(2), Florida Statutes, shall comply therewith immediately, but on petition to the board shall be afforded a hearing as soon as possible.

A person may file a request for an extension of time for filing a petition. The District may grant the request for good cause. Requests for extension of time must be filed with the District prior to the deadline for filing a petition for hearing. Such requests for extension shall contain a certificate that the moving party has consulted with all other parties concerning the extension and whether the District and any other parties agree to or oppose the extension. A timely request for an extension of time shall toll the running of the time period for filing a petition until the request is acted upon.

FILING INSTRUCTIONS

A petition for administrative hearing must be filed with the Office of the District Clerk. Filings with the Office of the District Clerk may be made by mail, hand-delivery, or e-mail. Filings by facsimile will not be accepted. A petition for administrative hearing or other document is deemed filed upon receipt during normal business hours by the Office of the District Clerk at the District’s headquarters in West Palm Beach, Florida. The District’s normal business hours are 8:00 a.m. – 5:00 p.m., excluding weekends and District holidays. Any document received by the Office of the District Clerk after 5:00 p.m. shall be deemed filed as of 8:00 a.m. on the next regular business day.

Rev. 1/16/20 1 Permit No: 36-115618-P, Page 8

Additional filing instructions are as follows:

Filings by mail must be addressed to the Office of the District Clerk, 3301 Gun Club Road, West Palm Beach, Florida 33406.

Filings by hand-delivery must be delivered to the Office of the District Clerk. Delivery of a petition to the District's security desk does not constitute filing. It will be necessary to request that the District's security officer contact the Office of the District Clerk. An employee of the District's Clerk's office will receive and process the petition.

Filings by e-mail must be transmitted to the Office of the District Clerk at clerk@sfwmd.gov.

The filing date for a document transmitted by electronic mail shall be the date the Office of the District Clerk receives the complete document.

INITIATION OF ADMINISTRATIVE HEARING

Pursuant to Sections 120.54(5)(b)4. and 120.569(2)(c), Florida Statutes, and Rules 28-106.201 and 28-106.301, Florida Administrative Code, initiation of an administrative hearing shall be made by written petition to the District in legible form and on 8 1/2 by 11 inch white paper. All petitions shall contain:

Identification of the action being contested, including the permit number, application number, District file number or any other District identification number, if known.

1.

The name, address, any email address, any facsimile number, and telephone number of the petitioner, petitioner’s attorney or qualified representative, if any.

2.

An explanation of how the petitioner’s substantial interests will be affected by the agency determination.

3.

A statement of when and how the petitioner received notice of the District’s decision.4.

A statement of all disputed issues of material fact. If there are none, the petition must so indicate.

5.

A concise statement of the ultimate facts alleged, including the specific facts the petitioner contends warrant reversal or modification of the District’s proposed action.

6.

A statement of the specific rules or statutes the petitioner contends require reversal or modification of the District’s proposed action.

7.

If disputed issues of material fact exist, the statement must also include an explanation of how the alleged facts relate to the specific rules or statutes.

8.

A statement of the relief sought by the petitioner, stating precisely the action the petitioner wishes the District to take with respect to the District’s proposed action.

9.

MEDIATION

The procedures for pursuing mediation are set forth in Section 120.573, Florida Statutes, and Rules 28-106.111 and 28-106.401–.405, Florida Administrative Code. The District is not proposing mediation for this agency action under Section 120.573, Florida Statutes, at this time.

RIGHT TO SEEK JUDICIAL REVIEW

Pursuant to Section 120.68, Florida Statutes, and in accordance with Florida Rule of Appellate Procedure 9.110, a party who is adversely affected by final District action may seek judicial review of the District's final decision by filing a notice of appeal with the Office of the District Clerk in accordance with the filing instructions set forth herein within 30 days of rendition of the order to be reviewed, and by filing a copy of the notice with the appropriate district court of appeals via the Florida Courts E-Filing Portal.

Rev. 1/16/20 2 Permit No: 36-115618-P, Page 9