Building_35__30_20_amp_plug_AF_Form_66.pdf

PDF 16 KB Posted

Attached to
Install Explosion Proof Receptacles - Hangar 35 Federal contract opportunity
Solicitation number
W912JB-19-R-5021
Issued by
Department of the Army Michigan Army National Guard

About this file

AF66 Submittal Form

View the file

Other files for this federal contract opportunity

Other files attached to Install Explosion Proof Receptacles - Hangar 35, newest first.
File Type Posted
Drawing_E101-Model.pdf PDF
DSCN3997.JPG JPG image
Pre-Proposal_RFIs.docx DOCX document
Site_Visit_Attendance_Sheet.pdf PDF
Pre-Proposal_Conference_Minutes_-_Hgr._35_Explosion_Proof_Receptacles.pdf PDF
19-R-5021-0001.pdf PDF
W912JB19R5021_Install_Explosion_Proof_Receptacles.pdf PDF
Drawing_E101-Model.pdf PDF
Vetting_Access_Request_List_Blank.pdf PDF
STATEMENT_OF_WORK_Recp_HGR_35_(002).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO.

W O 201501246

APPROVED DISAPPROVED

1 Installation Plan and procedures x x x x x x

2 Conduit, Fittinges Anchorages x x x x x x x x

Wiring Conductor, Mounting

Hardware x x x x x x x x

4 Wire Conduit MSD Sheets x x x x x x x x

5 Construction Mateials x x x x x x x x

6 30 Amp Power Receptacles x x x x x x x x

7 20 Amp Power Receptacles x x x x x x x x

SOLICITATION/CONTRACT NO.PROJECT TITLE

Project Title VGLZ192035 Install

Explosion Proof Receptacle In Hangar

Bay Building 35

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66 Modified)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S

R E

C O

M M

E N

D A

T

IO

N S

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

C

E R

T

IF

IC

A

T

IO

N O

F C

O M

P L

IA

N

C E

A N

D C

L O

S E

O U

T

RETURN

SUSPENSION

DATE

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

C A

T A

L O

G D

A T

A

DATE

RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

L

IN

E N

U M

B E

R

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

O T

H E

R

M

A T

E R

IA

L o r D

A T

A

S H

O P

D R

A W

IN

G

S

DATE CONTRACTOR NOTIFIED

REMARKS

FINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

FOLLOW-UP

SUBMITTAL

REQUIRED

BY 14 DAYS

AFTER

NTP

File details come from the government source that posted it.