Pre-Proposal_RFIs.docx
DOCX document 12 KB Posted
- Attached to
- Install Explosion Proof Receptacles - Hangar 35 Federal contract opportunity
- Solicitation number
- W912JB-19-R-5021
About this file
RFI Questions & Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Drawing_E101-Model.pdf | ||
| DSCN3997.JPG | JPG image | |
| Site_Visit_Attendance_Sheet.pdf | ||
| Pre-Proposal_Conference_Minutes_-_Hgr._35_Explosion_Proof_Receptacles.pdf | ||
| 19-R-5021-0001.pdf | ||
| W912JB19R5021_Install_Explosion_Proof_Receptacles.pdf | ||
| Drawing_E101-Model.pdf | ||
| Vetting_Access_Request_List_Blank.pdf | ||
| Building_35__30_20_amp_plug_AF_Form_66.pdf | ||
| STATEMENT_OF_WORK_Recp_HGR_35_(002).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI Q&A – Install Explosion Proof Receptacles (W912JB-19-R-5021)
1) Are exact quantities for explosion proof receptacles going to be posted on fbo?
A. There are 13 devices in the bay which must be made Class 1 explosion proof
2) What is the load schedule and branch circuits for the receptacles?
A. 13 devices in the bay which must be made Class 1 explosion proof, in accordance with technical order 1-1-3., NFPA 70, UFC 4-211-01 and ETL 98-8, and are required to be GFCI protected. 7 of which are 120volt 20amp and 6 which are 220volt single phase. (3wire twist lock).
3) Can you provide any info regarding the to be installed receptacles load requirements such amps,voltage,phase either single or 3 phase requirements?
A. Basis of design receptacle is listed in the statement of work. (meet or exceed the specified Appleton EBR Receptacles with interlocked circuit breaker)