DRAFTFA5685-08-R-0001(PaintIDIQ)AFForm66.XLS

XLS spreadsheet 46 KB Posted

Attached to
Request for Information for Exterior/Interior Paint IDIQ Federal contract opportunity
Solicitation number
Reference-Number-FA5685-08-R-0001_Draft
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Draft AF Form 66

View the file

Other files for this federal contract opportunity

Other files attached to Request for Information for Exterior/Interior Paint IDIQ, newest first.
File Type Posted
FA5685-08-R-0001-0001Amendment.doc DOC document
PastPerformanceQuestionnaire(Atch6 RFPFA5685-08-R-0001).doc DOC document
RFPFA5685-08-R-0001.doc DOC document
DRAFTFA5685-08-R-0001(PaintIDIQ)Specifications.DOC DOC document
DRAFTFA5685-08-R-0001(PaintIDIQ)CostBreakdown.XLS XLS spreadsheet
DRAFTFA5685-08-R-0001(PaintIDIQ)SOW.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

sheet1(1)

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERPROJECT TITLE: MAINTAIN, PAINT EXTERIORSOLICITATION/CONTRACT NUMBER
AND INTERIOR VARIOUS FACILITIES ID/IQ
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT,REFERENCE,TYPE OF SUBMITTALITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCertification of ComplianceShop Drawings (Material Approval + 10 Days)SamplesColor selectionManufacturer's RecomendationManunfacturer's WarrantyCatalog DataOperating InstructionPlan, Schedule, TestREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
GENERAL
1Key personal Sec. 013003 CPNTP+10D
2Testing laboratory Sec. 013003 CPNTP+10D
2Progress schedule Sec. 013103 CPNTP+10D
4Quality control plan Sec. 014003 CPNTP+10D
5Safety plan Sec. 014203 CPNTP+10D
6Notices for project completion & final insp. Sec.01700FINAL INSP-10 DAYS
ARCHITECTURAL
EXTERIOR
1Silicone Based Paint and Primer3 CP1EA1EA3CP3ST3CPNTP+10D
2Ready Mixed Colored Plaster3 CP1EA1EA3CP3ST3CPNTP+10D
3Synthetic Enamel Paint and Primer3 CP1EA1EA3CP3ST3CPNTP+10D
4Metal Primer For Galvanized Surfaces3 CP1EA1EA3CP3ST3CPNTP+10D
5Wood protective stain with varnish and impregnate coat3 CP1EA1EA3CP3ST3CPNTP+10D
6Epoxy Resin Based Primer and Paint3 CP1EA1EA3CP3ST3CPNTP+20D
7Cement Based Polymer Modified Surface Repair Grout3 CP1EA1EA3CP3ST3CPNTP+20D
8Acrylic Resin Based Seal Material3 CP1EA1EA3CP3ST3CPNTP+20D
9Traffic and Road Marking Paint3 CP1EA1EA3 CP3CP3ST3CPNTP+20D
INTERIOR
10Water Based Satin Paint and Primer3 CP1EA1EA3CP3ST3CPNTP+10D
11Interior Silicone Based Paint and Primer3 CP1EA1EA3CP3ST3CPNTP+10D
12Epoxy Based Paint and Primer3 CP1EA1EA3CP3ST3CPNTP+10D
13Cement Based Polymer Modified Repair & Finishing Grout3 CP1EA1EA3 CP3CP3ST3CPNTP+20D
14Solvent Containing Acrylic Resin Based Concrete Seal Material3 CP1EA1EA3CP3ST3CPNTP+20D
15Epoxy Resin Based Primer & Non-skid Material3 CP1EA1EA3CP3ST3CPNTP+20D
16Epoxy Resin Based Primer & Self Leveling Material, Quartz Sand and Non-skid Material3 CP1EA1EA3 CP3CP3ST3CPNTP+20D
17Epoxy Resin Based Primer & Self Leveling Material3 CP1EA1EA3 CP3CP3ST3CPNTP+20D
18Epoxy Resin Based Primer & Self Leveling Material and Quartz Sand3 CP1EA1EA3 CP3CP3ST3CPNTP+20D
19One Component Polurethane Based Cold Joint Sealant3 CP1EA1EA3CP3ST3CPNTP+20D
20Gypsum Board Panels and Galvanized Metal Studs & Runners3 CP1EA1EA3CP3STNTP+20D
21Gypsum Satin Plaster, Gypsum Primer and Gypsum Adhesive3 CP1EA1EA3CP3STNTP+20D
LEAD BASED PAINT ABATEMENT (EXTERIOR & INTERIOR)
22Paint Removal System3 CP3 CP3CP3STNTP+30D
CP: COPY, ST:SET, PN: SAMPLES PANEL, MD:MODULE, SM:SQUARE METER, EA: EACH, KG: KILOGRAM, CON: CONTAINER, LM: LINEAR METER, MAT APP: MATERIAL APPROVAL
COMPUTER GENERATED AF 66, OCT 89

&C

EX.INT. PT. ID/IQ

Sheet1 (2)

Sheet1 (3)

&CSC- &

sheet1(4)

Sheet1 (5)

Sheet2

&A Page &P

Sheet3

Sheet4

Sheet5

Sheet6

Sheet7

Sheet8

Sheet9

Sheet10

Sheet11

Sheet12

Sheet13

Sheet14

Sheet15

Sheet16

File details come from the government source that posted it. Updated .