DRAFTFA5685-08-R-0001(PaintIDIQ)CostBreakdown.XLS
XLS spreadsheet 93 KB Posted
- Attached to
- Request for Information for Exterior/Interior Paint IDIQ Federal contract opportunity
- Solicitation number
- Reference-Number-FA5685-08-R-0001_Draft
About this file
Blank Cost Estimate with all line items that will be included in final contract
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA5685-08-R-0001-0001Amendment.doc | DOC document | |
| PastPerformanceQuestionnaire(Atch6 RFPFA5685-08-R-0001).doc | DOC document | |
| RFPFA5685-08-R-0001.doc | DOC document | |
| DRAFTFA5685-08-R-0001(PaintIDIQ)Specifications.DOC | DOC document | |
| DRAFTFA5685-08-R-0001(PaintIDIQ)AFForm66.XLS | XLS spreadsheet | |
| DRAFTFA5685-08-R-0001(PaintIDIQ)SOW.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MASTER1
| {END}{UP} | {DOWN 52}~ | {/ Block;Erase} | This is NOT a comprehensive cost estimation macro. The User | ||||||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | {UP 52} | {/ Block;Copy} | {RIGHT 3} | is required to do many of the revisions manually. The User | |||||||||||||
| CONTRACTOR | 1 OF 4 | {/ Protection;Disable} | {ESC}{UP 53} | {DOWN 33}~ | must be capable of using a spreadsheet with minimum help. | ||||||||||||
| {/ Block;Copy} | .{DOWN 52} | {RIGHT 5} | |||||||||||||||
| CONTRACT FOR (Work to be performed) | INSTRUCTIONS FOR COMPLETING AF FORM 3052 | 4 OF 4 | {DOWN 52} | {RIGHT 12}~~ | {/ Block;Erase} | The cost form is prepared for Quattro Pro version 4.0. The printer | |||||||||||
| MAINTAIN, PAINT EXTERIOR AND INTERIOR VARIOUS FACILITIES, ID/IQ | Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to | {RIGHT 12}~ | {/ Protection;Enable} | {RIGHT 1} | selected is Canon Laser Printer LPB-4. Hovewer, as the program's | ||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | permit itemizing of all direct costs. | {DOWN 53}~ | {DOWN 33}~ | soft fonts are used, changing a printer should not present problems. | ||||||||||||
| Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples : square yards - SY, cubic yards - CY, square | {/ Protection;Enable} | {RIGHT 3} | |||||||||||||||
| UNIT OF | feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB). | {/ Block;Erase} | It is possible that, at the first trials, problems with page fitting may | ||||||||||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be | {DOWN 33}~ | arise. The User should experiment with the size of the first | |||||||||
| NO | UNIT | TOTAL | funished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will | {LEFT 8} | font on the font table. | ||||||||||||
| BASIC YEAR (EXTERIOR) | be issued. Otherwise, the contractor is responsible for determining quantity estimates. | {/ Protection;Enable} | |||||||||||||||
| (1) | (2) | (3) | (4) | (5) | Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1. | The User is recommended to work in protected mode initially to avoid | |||||||||||
| REPAIR CRACKED AND DETERIORATED PLASTERED & | Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. | erasing any formulas. | |||||||||||||||
| 1 | CONCRETE SURFACES | SM | 12,000.00 | Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost. | |||||||||||||
| PAINT PLASTERED & CONCRETE SURFACES WITH TWO COATS OF | Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract | RECAP sheet formulas and the discipline totals at the end of each | |||||||||||||||
| 2 | SILICONE BASED PAINT & ONE COAT OF PRIMER | SM | 12,000.00 | and of significant dollar value. | discipline need to be manually revised with every new estimate. | ||||||||||||
| Col 10 Line Total. Self-explanatory. | |||||||||||||||||
| 3 | PROVIDE AND APPLY READY MIXED COLORED PLASTER | SM | 200.00 | NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last | There are three utility macros that can be started by pressing | ||||||||||||
| REMOVAL OF EXISTING PAINT & RUST AND CLEAN | page as follows. | simultaneously, the <Alt> key and one letter (See below). | |||||||||||||||
| 4 | METAL SURFACES WITH SOLVENT | SM | 6,000.00 | ||||||||||||||
| TOTAL MATERIAL COSTS | $ | N/A | <Alt>C ....... Erases the contents of one page of cost estimate | ||||||||||||||
| 5 | REMOVE EXISTING LEAD BASED PAINT WITH PAINT REMOVAL SYSTEM | SM | 800.00 | BASIC YEAR | <Alt>Z ....... Inserts a new cost estimate page | ||||||||||||
| PAINT GALVANIZED METAL SURFACES WITH TWO COATS OF | TOTAL LABOR COSTS | $ | N/A | <Alt>X ....... Adds a new cost estimate page at the very end | |||||||||||||
| 6 | SYNTHETIC ENAMEL PAINT & ONE COAT OF EPOXY RESIN BASED PRIMER | SM | 3,500.00 | ||||||||||||||
| PAINT METAL SURFACES WITH TWO COATS OF | TOTAL OTHER DIRECT COSTS | $ | N/A | Macros <Alt>C and <Alt>Z must be started with the cursor parked | |||||||||||||
| 7 | SYNTHETIC ENAMEL PAINT & ONE COAT OF ANTIRUST METAL PRIMER | SM | 2,500.00 | in column A, and right below the cell containing page break, just | |||||||||||||
| TOTAL DIRECT COSTS | $ | N/A | before the page the contents of which are to be erased, or | ||||||||||||||
| 8 | SCRAPE OR SAND TO REMOVE DETERIORATED WOOD SURFACES | SM | 250.00 | before the location of the new page to be inserted. | |||||||||||||
| PAINT WOOD SURFACES WITH TWO COATS OF | OVERHEAD | Included In | % | $ | 0.00 | ||||||||||||
| 9 | SYNTHETIC ENAMEL PAINT & ONE COAT OF PRIMER | SM | 150.00 | Unit Price | To insert new items in a page use and empty page as a holding tank | ||||||||||||
| APPLY IMPREGNATE COAT AND TWO COATS OF COLORED WOOD PROTECTIVE STAIN ON | SUBTOTAL | $ | N/A | and rearrange items by copying ("copy special, contents", to avoid | |||||||||||||
| 10 | WOOD SURFACES | SM | 100.00 | disturbing the cell formats) to and from it. Do not use "move" | |||||||||||||
| PAINT SURFACES WITH TWO COATS OF ACRYLIC OR SILICONE | PROFIT | Included In | % | $ | 0.00 | untill you feel comfortable with the spreadsheet. | |||||||||||
| 11 | BASED GFM PAINT & PRIMER | SM | 100.00 | Unit Price | |||||||||||||
| PAINT SURFACES WITH TWO COATS OF SYNTHETIC | TOTAL PRICE | $ | The decision of splitting the item definitions to two lines lies | ||||||||||||||
| 12 | ENAMEL GFM PAINT & PRIMER OR WOOD STAIN | SM | 100.00 | with the User. Ensure the lines are not clipped during printing. | |||||||||||||
| EXTERIOR CONCRETE AND METAL SURFACE PREPARATION, CLEANING AND | |||||||||||||||||
| 13 | SAND BLASTING | SM | 200.00 | The form is designed using for A4 size, for 8.5"x11" minor | |||||||||||||
| REMOVAL OF EXISTING EPOXY MATERIAL, SAND BLASTING AND | DATE : | FIRM NAME : | adjusments may be required. To print on A4, set page break | ||||||||||||||
| 14 | SURFACE PREPARATION | SM | 1,200.00 | ------------------------------------- | --------------------------------------------------- | options in the printer page layout to "NO". | |||||||||||
| PROVIDE & APPLY ONE COAT OF EPOXY RESIN BASED PRIMER AND TWO | TITLE : | BY : | |||||||||||||||
| 15 | COATS OF EPOXY RESIN BASED PAINT | SM | 1,200.00 | ----------------------------------- | |||||||||||||
| PROVIDE AND REPAIR CRACKED AND DETERIORATED EXTERIOR CONCRETE SURFACES | (Signature) | ||||||||||||||||
| 16 | WITH CEMENT BASED POLYMER MODIFIED SURFACE REPAIR & FINISHING GROUT | SM | 1,500.00 | INSTRUCTIONS TO OFFERORS | The discipline totals must be centered, written in uppercase, | ||||||||||||
| PROVIDE & SEAL EXTERIOR CONCRETE SURFACES WITH TWO COATS OF ONE | 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and | ||||||||||||||||
| 17 | COMPONENT SOLVENT CONTAINING ACRYLIC RESIN BASED MATERIAL | SM | 1,100.00 | estimated costs (and attached supporting information) suitable for detaied review and analysis. Prior to the award of a contract resulting from | The discipline totals must be centered, written in uppercase, | ||||||||||||
| this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data | |||||||||||||||||
| 18 | REMOVAL OF EXISTING JOINT SEALANT | LM | 200.00 | (see ASPR 3-807.3(e) and 3-807.4) | |||||||||||||
| 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this | |||||||||||||||||
| 19 | PROVIDE & APPLY TWO COMPONENT COLD SEALANT ON JOINTS | LM | 250.00 | form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and | |||||||||||||
| analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of | |||||||||||||||||
| 20 | PROVIDE AND APPLY TRAFFIC AND ROAD MARKING PAINT | SM | 100.00 | a. The existing, verifiable data. | |||||||||||||
| b. The judgmental factors applied in projecting from known data to the estimate, and | |||||||||||||||||
| 21 | APPLY PORTLAND CEMENT PLASTER (EXTERIOR) | SM | 100.00 | c. The contingencies used by the offeror in his proposed price. | |||||||||||||
| In short, the offeror's estimating process itself needs to be disclosed. | |||||||||||||||||
| TOTAL OF EXTERIOR PAINT | 3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), | ||||||||||||||||
| (Computer Generated AF Form 3052., AUG 93) | and made available to the contracting officer or his authorized representative upon request. | ||||||||||||||||
| 4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the | |||||||||||||||||
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate | |||||||||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection | ||||||||||||||||
| CONTRACTOR | 2 OF 4 | with any negotiations prior to contract award. | |||||||||||||||
| (Reverse of Computer Generated AF Form 3052., AUG 93) | |||||||||||||||||
| CONTRACT FOR (Work to be performed) | |||||||||||||||||
| MAINTAIN, PAINT EXTERIOR AND INTERIOR VARIOUS FACILITIES, ID/IQ | |||||||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | ||||||||||||||||
| INSTRUCTIONS FOR COMPLETING AF FORM 3052 | 4 OF 4 | ||||||||||||||||
| UNIT OF | Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to | ||||||||||||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | permit itemizing of all direct costs. | |||||||||||
| NO | UNIT | TOTAL | Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples : square yards - SY, cubic yards - CY, square | ||||||||||||||
| BASIC YEAR (INTERIOR) | feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB). | ||||||||||||||||
| (1) | (2) | (3) | (4) | (5) | Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be | ||||||||||||
| funished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will | |||||||||||||||||
| 1 | SURFACE PREPARATION, REPAIRING, CLEANING AND PUTTY APPLICATION | SM | 1,600.00 | be issued. Otherwise, the contractor is responsible for determining quantity estimates. | |||||||||||||
| REMOVAL OF EXISTING PAINT & RUST AND CLEAN | Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1. | ||||||||||||||||
| 2 | METAL SURFACES WITH SOLVENT | SM | 250.00 | Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. | |||||||||||||
| INTERIOR CONCRETE AND METAL SURFACE PREPARATION, CLEANING AND | Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost. | ||||||||||||||||
| 3 | SAND BLASTING | SM | 600.00 | Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract | |||||||||||||
| and of significant dollar value. | |||||||||||||||||
| 4 | REMOVE EXISTING LEAD BASED PAINT WITH PAINT REMOVAL SYSTEM | SM | 200.00 | Col 10 Line Total. Self-explanatory. | |||||||||||||
| PROVIDE&PAINT PLASTERED, CONCRETE, GYPSUM BOARD, METAL AND WOOD | NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last | ||||||||||||||||
| 5 | SURFACES WITH ONE COAT OF PRIMER AND TWO COATS OF SYNTHETIC ENAMEL PAINT | SM | 700.00 | page as follows. | |||||||||||||
| PROVIDE&PAINT PLASTERED, GYPSUM BOARD AND CONCRETE SURFACES WITH ONE COAT OF | |||||||||||||||||
| 6 | PRIMER AND TWO COATS OF WATER BASED SATIN PAINT | SM | 1,200.00 | TOTAL MATERIAL COSTS | $ | N/A | |||||||||||
| PROVIDE&PAINT PLASTERED, GYPSUM BOARD AND CONCRETE SURFACES WITH ONE COAT OF | FIRST OPTIONAL YEAR | ||||||||||||||||
| 7 | SILICONE BASED PRIMER AND TWO COATS OF SILICONE BASED INTERIOR PAINT | SM | 1,200.00 | TOTAL LABOR COSTS | $ | N/A | |||||||||||
| PROVIDE & APPLY IMPREGNATE COAT AND TWO COATS OF COLORED WOOD PROTECTIVE STAIN | |||||||||||||||||
| 8 | WITH VARNISH ON WOOD AND WOOD VENEERED SURFACES C/W SANDPAPERING | SM | 200.00 | TOTAL OTHER DIRECT COSTS | $ | N/A | |||||||||||
| 9 | PAINT INTERIOR SURFACES WITH TWO COATS OF GFM SYNTHETIC PAINT&PRIMER | SM | 50.00 | TOTAL DIRECT COSTS | $ | N/A | |||||||||||
| 10 | PAINT INTERIOR SURFACES WITH TWO COATS OF GFM WATER BASED PAINT&PRIMER | SM | 50.00 | OVERHEAD | Included In | % | $ | 0.00 | |||||||||
| Unit Price | |||||||||||||||||
| 11 | REMOVAL OF EXISTING EPOXY MATERIAL, SAND BLASTING AND SURFACE PREPARATION | SM | 1,200.00 | SUBTOTAL | $ | N/A | |||||||||||
| PROVIDE & APPLY ONE COAT OF EPOXY RESIN BASED PRIMER AND TWO COATS | |||||||||||||||||
| 12 | OF TWO COMPONENT EPOXY RESIN BASED PAINT | SM | 250.00 | PROFIT | Included In | % | $ | 0.00 | |||||||||
| PROVIDE&REPAIR CRACKED AND DETERIORATED CONCRETE SURFACES WITH CEMENT | Unit Price | ||||||||||||||||
| 13 | BASED POLYMER MODIFIED SURFACE REPAIR AND FINISHING GROUT | SM | 250.00 | TOTAL PRICE | $ | ||||||||||||
| PROVIDE&SEAL EXTERIOR CONCRETE SURFACES WITH TWO COATS OF ONE COMPONENT | |||||||||||||||||
| 14 | SOLVENT CONTAINING ACRYLIC RESIN BASED MATERIAL | SM | 350.00 | ||||||||||||||
| PROVIDE & APPLY ONE COAT OF EPOXY RESIN BASED PRIMER AND TWO COATS | |||||||||||||||||
| 15 | OF EPOXY RESIN BASED NON-SKID MATERIAL | SM | 250.00 | DATE : | FIRM NAME : | ||||||||||||
| PROVIDE & APPLY ONE COAT OF EPOXY RESIN BASED PRIMER AND ONE COAT OF | ------------------------------------- | --------------------------------------------------- | |||||||||||||||
| 16 | EPOXY RESIN BASED SELF-LEVELING MATERIAL, QUARTZ SAND AND ONE COAT | TITLE : | BY : | ||||||||||||||
| ----------------------------------- | |||||||||||||||||
| OF EPOXY RESIN BASED NON-SKID MATERIAL (THICKNESS: 2 MM.) | SM | 300.00 | (Signature) | ||||||||||||||
| PROVIDE & APPLY ONE COAT OF EPOXY RESIN BASED PRIMER AND ONE COAT OF | INSTRUCTIONS TO OFFERORS | ||||||||||||||||
| 17 | EPOXY RESIN BASED SELF-LEVELING MATERIAL, QUARTZ SAND AND ONE COAT | 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and | |||||||||||||||
| estimated costs (and attached supporting information) suitable for detaied review and analysis. Prior to the award of a contract resulting from | |||||||||||||||||
| OF EPOXY RESIN BASED NON-SKID MATERIAL (THICKNESS: 3 MM.) | SM | 400.00 | this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data | ||||||||||||||
| PROVIDE & APPLY ONE COAT OF EPOXY RESIN BASED PRIMER AND TWO COATS | (see ASPR 3-807.3(e) and 3-807.4) | ||||||||||||||||
| 18 | OF EPOXY RESIN BASED SELF LEVELING MATERIAL | SM | 200.00 | 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this | |||||||||||||
| PROVIDE AND APPLY ONE COAT OF EPOXY RESIN BASED PRIMER AND TWO COATS OF EPOXY | form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and | ||||||||||||||||
| 19 | RESIN BASED SELF LEVELING MATERIAL C/W QUARTZ SAND | SM | 250.00 | analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of | |||||||||||||
| a. The existing, verifiable data. | |||||||||||||||||
| 20 | REMOVAL OF EXISTING JOINT SEALANT | LM | 50.00 | b. The judgmental factors applied in projecting from known data to the estimate, and | |||||||||||||
| (Computer Generated AF Form 3052., AUG 93) | c. The contingencies used by the offeror in his proposed price. | ||||||||||||||||
| In short, the offeror's estimating process itself needs to be disclosed. | |||||||||||||||||
| 3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), | |||||||||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | and made available to the contracting officer or his authorized representative upon request. | ||||||||||||||||
| CONTRACTOR | 3 OF 4 | 4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the | |||||||||||||||
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate | |||||||||||||||||
| CONTRACT FOR (Work to be performed) | evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection | ||||||||||||||||
| MAINTAIN, PAINT EXTERIOR AND INTERIOR VARIOUS FACILITIES, ID/IQ | with any negotiations prior to contract award. | ||||||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | (Reverse of Computer Generated AF Form 3052., AUG 93) | |||||||||||||||
| UNIT OF | |||||||||||||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | ||||||||||||
| NO | UNIT | TOTAL | INSTRUCTIONS FOR COMPLETING AF FORM 3052 | 4 OF 4 | |||||||||||||
| BASIC YEAR (INTERIOR) | Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to | ||||||||||||||||
| (1) | (2) | (3) | (4) | (5) | permit itemizing of all direct costs. | ||||||||||||
| Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples : square yards - SY, cubic yards - CY, square | |||||||||||||||||
| 21 | PROVIDE & APPLY ONE COMPONENT POLYURETHANE BASED COLD SEALANT ON JOINTS | LM | 50.00 | feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB). | |||||||||||||
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be | |||||||||||||||||
| 22 | APPLY PORTLAND CEMENT PLASTER ON INTERIOR WALL SURFACES | SM | 25.00 | funished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will | |||||||||||||
| PROVIDE & COVER INTERIOR DAMAGED WALL SURFACES WITH GYPSUM BOARD PANELS | be issued. Otherwise, the contractor is responsible for determining quantity estimates. | ||||||||||||||||
| 23 | C/W GALVANIZED METAL STUDS AND RUNNERS | SM | 25.00 | Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1. | |||||||||||||
| PROVIDE & COVER INTERIOR DAMAGED WALL SURFACES WITH GYPSUM BOARD PANELS | Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. | ||||||||||||||||
| 24 | C/W GYPSUM ADHESIVE | SM | 25.00 | Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost. | |||||||||||||
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract | |||||||||||||||||
| 25 | PROVIDE&APPLY GYPSUM SATIN PLASTER AND GYPSUM PRIMER ON INTERIOR WALL SURFACES | SM | 200.00 | and of significant dollar value. | |||||||||||||
| Col 10 Line Total. Self-explanatory. | |||||||||||||||||
| 26 | MOVE FURNITURE AND EQUIPMENT AS REQUIRED | SM | 1,200.00 | NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last | |||||||||||||
| page as follows. | |||||||||||||||||
| TOTAL MATERIAL COSTS | $ | N/A | |||||||||||||||
| SECOND OPTIONAL YEAR | |||||||||||||||||
| TOTAL LABOR COSTS | $ | N/A | |||||||||||||||
| TOTAL OTHER DIRECT COSTS | $ | N/A | |||||||||||||||
| TOTAL DIRECT COSTS | $ | N/A | |||||||||||||||
| OVERHEAD | Included In | % | $ | 0.00 | |||||||||||||
| Unit Price | |||||||||||||||||
| SUBTOTAL | $ | N/A | |||||||||||||||
| PROFIT | Included In | % | $ | 0.00 | |||||||||||||
| Unit Price | |||||||||||||||||
| TOTAL PRICE | $ | ||||||||||||||||
| DATE : | FIRM NAME : | ||||||||||||||||
| ------------------------------------- | --------------------------------------------------- | ||||||||||||||||
| TITLE : | BY : | ||||||||||||||||
| ----------------------------------- | |||||||||||||||||
| (Signature) | |||||||||||||||||
| INSTRUCTIONS TO OFFERORS | |||||||||||||||||
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and | |||||||||||||||||
| TOTAL OF INTERIOR PAINT | estimated costs (and attached supporting information) suitable for detaied review and analysis. Prior to the award of a contract resulting from | ||||||||||||||||
| this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data | |||||||||||||||||
| (see ASPR 3-807.3(e) and 3-807.4) | |||||||||||||||||
| 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this | |||||||||||||||||
| GRAND TOTAL (BASIC YEAR) | form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and | ||||||||||||||||
| (Computer Generated AF Form 3052., AUG 93) | analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of | ||||||||||||||||
| a. The existing, verifiable data. | |||||||||||||||||
| b. The judgmental factors applied in projecting from known data to the estimate, and | |||||||||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | c. The contingencies used by the offeror in his proposed price. | ||||||||||||||||
| CONTRACTOR | 1 OF 4 | In short, the offeror's estimating process itself needs to be disclosed. | |||||||||||||||
| 3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), | |||||||||||||||||
| CONTRACT FOR (Work to be performed) | and made available to the contracting officer or his authorized representative upon request. | ||||||||||||||||
| MAINTAIN, PAINT EXTERIOR AND INTERIOR VARIOUS FACILITIES, ID/IQ | 4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the | ||||||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate | |||||||||||||||
| evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection | |||||||||||||||||
| UNIT OF | with any negotiations prior to contract award. | ||||||||||||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | (Reverse of Computer Generated AF Form 3052., AUG 93) | |||||||||||
| NO | UNIT | TOTAL | |||||||||||||||
| FIRST OPTIONAL YEAR (EXTERIOR) | |||||||||||||||||
| (1) | (2) | (3) | (4) | (5) | |||||||||||||
| REPAIR CRACKED AND DETERIORATED PLASTERED & | |||||||||||||||||
| 1 | CONCRETE SURFACES | SM | 12,000.00 | ||||||||||||||
| PAINT PLASTERED & CONCRETE SURFACES WITH TWO COATS OF | |||||||||||||||||
| 2 | SILICONE BASED PAINT & ONE COAT OF PRIMER | SM | 12,000.00 | ||||||||||||||
| 3 | PROVIDE AND APPLY READY MIXED COLORED PLASTER | SM | 200.00 | ||||||||||||||
| REMOVAL OF EXISTING PAINT & RUST AND CLEAN | |||||||||||||||||
| 4 | METAL SURFACES WITH SOLVENT | SM | 6,000.00 | ||||||||||||||
| 5 | REMOVE EXISTING LEAD BASED PAINT WITH PAINT REMOVAL SYSTEM | SM | 800.00 | ||||||||||||||
| PAINT GALVANIZED METAL SURFACES WITH TWO COATS OF | |||||||||||||||||
| 6 | SYNTHETIC ENAMEL PAINT & ONE COAT OF EPOXY RESIN BASED PRIMER | SM | 3,500.00 | ||||||||||||||
| PAINT METAL SURFACES WITH TWO COATS OF | |||||||||||||||||
| 7 | SYNTHETIC ENAMEL PAINT & ONE COAT OF ANTIRUST METAL PRIMER | SM | 2,500.00 | ||||||||||||||
| 8 | SCRAPE OR SAND TO REMOVE DETERIORATED WOOD SURFACES | SM | 250.00 | ||||||||||||||
| PAINT WOOD SURFACES WITH TWO COATS OF | |||||||||||||||||
| 9 | SYNTHETIC ENAMEL PAINT & ONE COAT OF PRIMER | SM | 150.00 | ||||||||||||||
| APPLY IMPREGNATE COAT AND TWO COATS OF COLORED WOOD PROTECTIVE STAIN ON | |||||||||||||||||
| 10 | WOOD SURFACES | SM | 100.00 | ||||||||||||||
| PAINT SURFACES WITH TWO COATS OF ACRYLIC OR SILICONE | |||||||||||||||||
| 11 | BASED GFM PAINT & PRIMER | SM | 100.00 | ||||||||||||||
| PAINT SURFACES WITH TWO COATS OF SYNTHETIC | |||||||||||||||||
| 12 | ENAMEL GFM PAINT & PRIMER OR WOOD STAIN | SM | 100.00 | ||||||||||||||
| EXTERIOR CONCRETE AND METAL SURFACE PREPARATION, CLEANING AND | |||||||||||||||||
| 13 | SAND BLASTING | SM | 200.00 | ||||||||||||||
| REMOVAL OF EXISTING EPOXY MATERIAL, SAND BLASTING AND | |||||||||||||||||
| 14 | SURFACE PREPARATION | SM | 1,200.00 | ||||||||||||||
| PROVIDE & APPLY ONE COAT OF EPOXY RESIN BASED PRIMER AND TWO | |||||||||||||||||
| 15 | COATS OF EPOXY RESIN BASED PAINT | SM | 1,200.00 | ||||||||||||||
| PROVIDE AND REPAIR CRACKED AND DETERIORATED EXTERIOR CONCRETE SURFACES | |||||||||||||||||
| 16 | WITH CEMENT BASED POLYMER MODIFIED SURFACE REPAIR & FINISHING GROUT | SM | 1,500.00 | ||||||||||||||
| PROVIDE & SEAL EXTERIOR CONCRETE SURFACES WITH TWO COATS OF ONE | |||||||||||||||||
| 17 | COMPONENT SOLVENT CONTAINING ACRYLIC RESIN BASED MATERIAL | SM | 1,100.00 | ||||||||||||||
| 18 | REMOVAL OF EXISTING JOINT SEALANT | LM | 200.00 | ||||||||||||||
| 19 | PROVIDE & APPLY TWO COMPONENT COLD SEALANT ON JOINTS | LM | 250.00 | ||||||||||||||
| 20 | PROVIDE AND APPLY TRAFFIC AND ROAD MARKING PAINT | SM | 100.00 | ||||||||||||||
| 21 | APPLY PORTLAND CEMENT PLASTER (EXTERIOR) | SM | 100.00 | ||||||||||||||
| TOTAL OF EXTERIOR PAINT | |||||||||||||||||
| (Computer Generated AF Form 3052., AUG 93) | |||||||||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||||||||||
| CONTRACTOR | 2 OF 4 | ||||||||||||||||
| CONTRACT FOR (Work to be performed) | |||||||||||||||||
| MAINTAIN, PAINT EXTERIOR AND INTERIOR VARIOUS FACILITIES, ID/IQ | |||||||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | ||||||||||||||||
| UNIT OF | |||||||||||||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | ||||||||||||
| NO | UNIT | TOTAL | |||||||||||||||
| FIRST OPTIONAL YEAR (INTERIOR) | |||||||||||||||||
| (1) | (2) | (3) | (4) | (5) | |||||||||||||
| 1 | SURFACE PREPARATION, REPAIRING, CLEANING AND PUTTY APPLICATION | SM | 1,600.00 | ||||||||||||||
| REMOVAL OF EXISTING PAINT & RUST AND CLEAN | |||||||||||||||||
| 2 | METAL SURFACES WITH SOLVENT | SM | 250.00 | ||||||||||||||
| INTERIOR CONCRETE AND METAL SURFACE PREPARATION, CLEANING AND | |||||||||||||||||
| 3 | SAND BLASTING | SM | 600.00 | ||||||||||||||
| 4 | REMOVE EXISTING LEAD BASED PAINT WITH PAINT REMOVAL SYSTEM | SM | 200.00 | ||||||||||||||
| PROVIDE&PAINT PLASTERED, CONCRETE, GYPSUM BOARD, METAL AND WOOD | |||||||||||||||||
| 5 | SURFACES WITH ONE COAT OF PRIMER AND TWO COATS OF SYNTHETIC ENAMEL PAINT | SM | 700.00 | ||||||||||||||
| PROVIDE&PAINT PLASTERED, GYPSUM BOARD AND CONCRETE SURFACES WITH ONE COAT OF | |||||||||||||||||
| 6 | PRIMER AND TWO COATS OF WATER BASED SATIN PAINT | SM | 1,200.00 | ||||||||||||||
| PROVIDE&PAINT PLASTERED, GYPSUM BOARD AND CONCRETE SURFACES WITH ONE COAT OF | |||||||||||||||||
| 7 | SILICONE BASED PRIMER AND TWO COATS OF SILICONE BASED INTERIOR PAINT | SM | 1,200.00 | ||||||||||||||
| PROVIDE & APPLY IMPREGNATE COAT AND TWO COATS OF COLORED WOOD PROTECTIVE STAIN | |||||||||||||||||
| 8 | WITH VARNISH ON WOOD AND WOOD VENEERED SURFACES C/W SANDPAPERING | SM | 200.00 | ||||||||||||||
| 9 | PAINT INTERIOR SURFACES WITH TWO COATS OF GFM SYNTHETIC PAINT&PRIMER | SM | 50.00 | ||||||||||||||
| 10 | PAINT INTERIOR SURFACES WITH TWO COATS OF GFM WATER BASED PAINT&PRIMER | SM | 50.00 | ||||||||||||||
| 11 | REMOVAL OF EXISTING EPOXY MATERIAL, SAND BLASTING AND SURFACE PREPARATION | SM | 1,200.00 | ||||||||||||||
| PROVIDE & APPLY ONE COAT OF EPOXY RESIN BASED PRIMER AND TWO COATS | |||||||||||||||||
| 12 | OF TWO COMPONENT EPOXY RESIN BASED PAINT | SM | 250.00 | ||||||||||||||
| PROVIDE&REPAIR CRACKED AND DETERIORATED CONCRETE SURFACES WITH CEMENT | |||||||||||||||||
| 13 | BASED POLYMER MODIFIED SURFACE REPAIR AND FINISHING GROUT | SM | 250.00 | ||||||||||||||
| PROVIDE&SEAL EXTERIOR CONCRETE SURFACES WITH TWO COATS OF ONE COMPONENT | |||||||||||||||||
| 14 | SOLVENT CONTAINING ACRYLIC RESIN BASED MATERIAL | SM | 350.00 | ||||||||||||||
| PROVIDE & APPLY ONE COAT OF EPOXY RESIN BASED PRIMER AND TWO COATS | |||||||||||||||||
| 15 | OF EPOXY RESIN BASED NON-SKID MATERIAL | SM | 250.00 | ||||||||||||||
| PROVIDE & APPLY ONE COAT OF EPOXY RESIN BASED PRIMER AND ONE COAT OF | |||||||||||||||||
| 16 | EPOXY RESIN BASED SELF-LEVELING MATERIAL, QUARTZ SAND AND ONE COAT | ||||||||||||||||
| OF EPOXY RESIN BASED NON-SKID MATERIAL (THICKNESS: 2 MM.) | SM | 300.00 | |||||||||||||||
| PROVIDE & APPLY ONE COAT OF EPOXY RESIN BASED PRIMER AND ONE COAT OF | |||||||||||||||||
| 17 | EPOXY RESIN BASED SELF-LEVELING MATERIAL, QUARTZ SAND AND ONE COAT | ||||||||||||||||
| OF EPOXY RESIN BASED NON-SKID MATERIAL (THICKNESS: 3 MM.) | SM | 400.00 | |||||||||||||||
| PROVIDE & APPLY ONE COAT OF EPOXY RESIN BASED PRIMER AND TWO COATS | |||||||||||||||||
| 18 | OF EPOXY RESIN BASED SELF LEVELING MATERIAL | SM | 200.00 | ||||||||||||||
| PROVIDE AND APPLY ONE COAT OF EPOXY RESIN BASED PRIMER AND TWO COATS OF EPOXY | |||||||||||||||||
| 19 | RESIN BASED SELF LEVELING MATERIAL C/W QUARTZ SAND | SM | 250.00 | ||||||||||||||
| 20 | REMOVAL OF EXISTING JOINT SEALANT | LM | 50.00 | ||||||||||||||
| (Computer Generated AF Form 3052., AUG 93) | |||||||||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||||||||||
| CONTRACTOR | 3 OF 4 | ||||||||||||||||
| CONTRACT FOR (Work to be performed) | |||||||||||||||||
| MAINTAIN, PAINT EXTERIOR AND INTERIOR VARIOUS FACILITIES, ID/IQ | |||||||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | ||||||||||||||||
| UNIT OF | |||||||||||||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | ||||||||||||
| NO | UNIT | TOTAL | |||||||||||||||
| FIRST OPTIONAL YEAR (INTERIOR) | |||||||||||||||||
| (1) | (2) | (3) | (4) | (5) | |||||||||||||
| 21 | PROVIDE & APPLY ONE COMPONENT POLYURETHANE BASED COLD SEALANT ON JOINTS | LM | 50.00 | ||||||||||||||
| 22 | APPLY PORTLAND CEMENT PLASTER ON INTERIOR WALL SURFACES | SM | 25.00 | ||||||||||||||
| PROVIDE & COVER INTERIOR DAMAGED WALL SURFACES WITH GYPSUM BOARD PANELS | |||||||||||||||||
| 23 | C/W GALVANIZED METAL STUDS AND RUNNERS | SM | 25.00 | ||||||||||||||
| PROVIDE & COVER INTERIOR DAMAGED WALL SURFACES WITH GYPSUM BOARD PANELS | |||||||||||||||||
| 24 | C/W GYPSUM ADHESIVE | SM | 25.00 | ||||||||||||||
| 25 | PROVIDE&APPLY GYPSUM SATIN PLASTER AND GYPSUM PRIMER ON INTERIOR WALL SURFACES | SM | 200.00 | ||||||||||||||
| 26 | MOVE FURNITURE AND EQUIPMENT AS REQUIRED | SM | 1,200.00 | ||||||||||||||
| TOTAL OF INTERIOR PAINT | |||||||||||||||||
| GRAND TOTAL (FIRST OPTIONAL YEAR) | |||||||||||||||||
| (Computer Generated AF Form 3052., AUG 93) | |||||||||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||||||||||
| CONTRACTOR | 1 OF 4 | ||||||||||||||||
| CONTRACT FOR (Work to be performed) | |||||||||||||||||
| MAINTAIN, PAINT EXTERIOR AND INTERIOR VARIOUS FACILITIES, ID/IQ | |||||||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | ||||||||||||||||
| UNIT OF | |||||||||||||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | ||||||||||||
| NO | UNIT | TOTAL | |||||||||||||||
| SECOND OPTIONAL YEAR (EXTERIOR) | |||||||||||||||||
| (1) | (2) | (3) | (4) | (5) | |||||||||||||
| REPAIR CRACKED AND DETERIORATED PLASTERED & | |||||||||||||||||
| 1 | CONCRETE SURFACES | SM | 12,000.00 | ||||||||||||||
| PAINT PLASTERED & CONCRETE SURFACES WITH TWO COATS OF | |||||||||||||||||
| 2 | SILICONE BASED PAINT & ONE COAT OF PRIMER | SM | 12,000.00 | ||||||||||||||
| 3 | PROVIDE AND APPLY READY MIXED COLORED PLASTER | SM | 200.00 | ||||||||||||||
| REMOVAL OF EXISTING PAINT & RUST AND CLEAN | |||||||||||||||||
| 4 | METAL SURFACES WITH SOLVENT | SM | 6,000.00 | ||||||||||||||
| 5 | REMOVE EXISTING LEAD BASED PAINT WITH PAINT REMOVAL SYSTEM | SM | 800.00 | ||||||||||||||
| PAINT GALVANIZED METAL SURFACES WITH TWO COATS OF | |||||||||||||||||
| 6 | SYNTHETIC ENAMEL PAINT & ONE COAT OF EPOXY RESIN BASED PRIMER | SM | 3,500.00 | ||||||||||||||
| PAINT METAL SURFACES WITH TWO COATS OF | |||||||||||||||||
| 7 | SYNTHETIC ENAMEL PAINT & ONE COAT OF ANTIRUST METAL PRIMER | SM | 2,500.00 | ||||||||||||||
| 8 | SCRAPE OR SAND TO REMOVE DETERIORATED WOOD SURFACES | SM | 250.00 | ||||||||||||||
| PAINT WOOD SURFACES WITH TWO COATS OF | |||||||||||||||||
| 9 | SYNTHETIC ENAMEL PAINT & ONE COAT OF PRIMER | SM | 150.00 | ||||||||||||||
| APPLY IMPREGNATE COAT AND TWO COATS OF COLORED WOOD PROTECTIVE STAIN ON | |||||||||||||||||
| 10 | WOOD SURFACES | SM | 100.00 | ||||||||||||||
| PAINT SURFACES WITH TWO COATS OF ACRYLIC OR SILICONE | |||||||||||||||||
| 11 | BASED GFM PAINT & PRIMER | SM | 100.00 | ||||||||||||||
| PAINT SURFACES WITH TWO COATS OF SYNTHETIC | |||||||||||||||||
| 12 | ENAMEL GFM PAINT & PRIMER OR WOOD STAIN | SM | 100.00 | ||||||||||||||
| EXTERIOR CONCRETE AND METAL SURFACE PREPARATION, CLEANING AND | |||||||||||||||||
| 13 | SAND BLASTING | SM | 200.00 | ||||||||||||||
| REMOVAL OF EXISTING EPOXY MATERIAL, SAND BLASTING AND | |||||||||||||||||
| 14 | SURFACE PREPARATION | SM | 1,200.00 | ||||||||||||||
| PROVIDE & APPLY ONE COAT OF EPOXY RESIN BASED PRIMER AND TWO | |||||||||||||||||
| 15 | COATS OF EPOXY RESIN BASED PAINT | SM | 1,200.00 | ||||||||||||||
| PROVIDE AND REPAIR CRACKED AND DETERIORATED EXTERIOR CONCRETE SURFACES | |||||||||||||||||
| 16 | WITH CEMENT BASED POLYMER MODIFIED SURFACE REPAIR & FINISHING GROUT | SM | 1,500.00 | ||||||||||||||
| PROVIDE & SEAL EXTERIOR CONCRETE SURFACES WITH TWO COATS OF ONE | |||||||||||||||||
| 17 | COMPONENT SOLVENT CONTAINING ACRYLIC RESIN BASED MATERIAL | SM | 1,100.00 | ||||||||||||||
| 18 | REMOVAL OF EXISTING JOINT SEALANT | LM | 200.00 | ||||||||||||||
| 19 | PROVIDE & APPLY TWO COMPONENT COLD SEALANT ON JOINTS | LM | 250.00 | ||||||||||||||
| 20 | PROVIDE AND APPLY TRAFFIC AND ROAD MARKING PAINT | SM | 100.00 | ||||||||||||||
| 21 | APPLY PORTLAND CEMENT PLASTER (EXTERIOR) | SM | 100.00 | ||||||||||||||
| TOTAL OF EXTERIOR PAINT | |||||||||||||||||
| (Computer Generated AF Form 3052., AUG 93) | |||||||||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||||||||||
| CONTRACTOR | 2 OF 4 | ||||||||||||||||
| CONTRACT FOR (Work to be performed) | |||||||||||||||||
| MAINTAIN, PAINT EXTERIOR AND INTERIOR VARIOUS FACILITIES, ID/IQ | |||||||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | ||||||||||||||||
| UNIT OF | |||||||||||||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | ||||||||||||
| NO | UNIT | TOTAL | |||||||||||||||
| SECOND OPTIONAL YEAR (INTERIOR) | |||||||||||||||||
| (1) | (2) | (3) | (4) | (5) | |||||||||||||
| 1 | SURFACE PREPARATION, REPAIRING, CLEANING AND PUTTY APPLICATION | SM | 1,600.00 | ||||||||||||||
| REMOVAL OF EXISTING PAINT & RUST AND CLEAN | |||||||||||||||||
| 2 | METAL SURFACES WITH SOLVENT | SM | 250.00 | ||||||||||||||
| INTERIOR CONCRETE AND METAL SURFACE PREPARATION, CLEANING AND | |||||||||||||||||
| 3 | SAND BLASTING | SM | 600.00 | ||||||||||||||
| 4 | REMOVE EXISTING LEAD BASED PAINT WITH PAINT REMOVAL SYSTEM | SM | 200.00 | ||||||||||||||
| PROVIDE&PAINT PLASTERED, CONCRETE, GYPSUM BOARD, METAL AND WOOD | |||||||||||||||||
| 5 | SURFACES WITH ONE COAT OF PRIMER AND TWO COATS OF SYNTHETIC ENAMEL PAINT | SM | 700.00 | ||||||||||||||
| PROVIDE&PAINT PLASTERED, GYPSUM BOARD AND CONCRETE SURFACES WITH ONE COAT OF | |||||||||||||||||
| 6 | PRIMER AND TWO COATS OF WATER BASED SATIN PAINT | SM | 1,200.00 | ||||||||||||||
| PROVIDE&PAINT PLASTERED, GYPSUM BOARD AND CONCRETE SURFACES WITH ONE COAT OF | |||||||||||||||||
| 7 | SILICONE BASED PRIMER AND TWO COATS OF SILICONE BASED INTERIOR PAINT | SM | 1,200.00 | ||||||||||||||
| PROVIDE & APPLY IMPREGNATE COAT AND TWO COATS OF COLORED WOOD PROTECTIVE STAIN | |||||||||||||||||
| 8 | WITH VARNISH ON WOOD AND WOOD VENEERED SURFACES C/W SANDPAPERING | SM | 200.00 | ||||||||||||||
| 9 | PAINT INTERIOR SURFACES WITH TWO COATS OF GFM SYNTHETIC PAINT&PRIMER | SM | 50.00 | ||||||||||||||
| 10 | PAINT INTERIOR SURFACES WITH TWO COATS OF GFM WATER BASED PAINT&PRIMER | SM | 50.00 | ||||||||||||||
| 11 | REMOVAL OF EXISTING EPOXY MATERIAL, SAND BLASTING AND SURFACE PREPARATION | SM | 1,200.00 | ||||||||||||||
| PROVIDE & APPLY ONE COAT OF EPOXY RESIN BASED PRIMER AND TWO COATS | |||||||||||||||||
| 12 | OF TWO COMPONENT EPOXY RESIN BASED PAINT | SM | 250.00 | ||||||||||||||
| PROVIDE&REPAIR CRACKED AND DETERIORATED CONCRETE SURFACES WITH CEMENT | |||||||||||||||||
| 13 | BASED POLYMER MODIFIED SURFACE REPAIR AND FINISHING GROUT | SM | 250.00 | ||||||||||||||
| PROVIDE&SEAL EXTERIOR CONCRETE SURFACES WITH TWO COATS OF ONE COMPONENT | |||||||||||||||||
| 14 | SOLVENT CONTAINING ACRYLIC RESIN BASED MATERIAL | SM | 350.00 | ||||||||||||||
| PROVIDE & APPLY ONE COAT OF EPOXY RESIN BASED PRIMER AND TWO COATS | |||||||||||||||||
| 15 | OF EPOXY RESIN BASED NON-SKID MATERIAL | SM | 250.00 | ||||||||||||||
| PROVIDE & APPLY ONE COAT OF EPOXY RESIN BASED PRIMER AND ONE COAT OF | |||||||||||||||||
| 16 | EPOXY RESIN BASED SELF-LEVELING MATERIAL, QUARTZ SAND AND ONE COAT | ||||||||||||||||
| OF EPOXY RESIN BASED NON-SKID MATERIAL (THICKNESS: 2 MM.) | SM | 300.00 | |||||||||||||||
| PROVIDE & APPLY ONE COAT OF EPOXY RESIN BASED PRIMER AND ONE COAT OF | |||||||||||||||||
| 17 | EPOXY RESIN BASED SELF-LEVELING MATERIAL, QUARTZ SAND AND ONE COAT | ||||||||||||||||
| OF EPOXY RESIN BASED NON-SKID MATERIAL (THICKNESS: 3 MM.) | SM | 400.00 | |||||||||||||||
| PROVIDE & APPLY ONE COAT OF EPOXY RESIN BASED PRIMER AND TWO COATS | |||||||||||||||||
| 18 | OF EPOXY RESIN BASED SELF LEVELING MATERIAL | SM | 200.00 | ||||||||||||||
| PROVIDE AND APPLY ONE COAT OF EPOXY RESIN BASED PRIMER AND TWO COATS OF EPOXY | |||||||||||||||||
| 19 | RESIN BASED SELF LEVELING MATERIAL C/W QUARTZ SAND | SM | 250.00 | ||||||||||||||
| 20 | REMOVAL OF EXISTING JOINT SEALANT | LM | 50.00 | ||||||||||||||
| (Computer Generated AF Form 3052., AUG 93) | |||||||||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||||||||||
| CONTRACTOR | 3 OF 4 | ||||||||||||||||
| CONTRACT FOR (Work to be performed) | |||||||||||||||||
| MAINTAIN, PAINT EXTERIOR AND INTERIOR VARIOUS FACILITIES, ID/IQ | |||||||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | ||||||||||||||||
| UNIT OF | |||||||||||||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | ||||||||||||
| NO | UNIT | TOTAL | |||||||||||||||
| SECOND OPTIONAL YEAR (INTERIOR) | |||||||||||||||||
| (1) | (2) | (3) | (4) | (5) | |||||||||||||
| 21 | PROVIDE & APPLY ONE COMPONENT POLYURETHANE BASED COLD SEALANT ON JOINTS | LM | 50.00 | ||||||||||||||
| 22 | APPLY PORTLAND CEMENT PLASTER ON INTERIOR WALL SURFACES | SM | 25.00 | ||||||||||||||
| PROVIDE & COVER INTERIOR DAMAGED WALL SURFACES WITH GYPSUM BOARD PANELS | |||||||||||||||||
| 23 | C/W GALVANIZED METAL STUDS AND RUNNERS | SM | 25.00 | ||||||||||||||
| PROVIDE & COVER INTERIOR DAMAGED WALL SURFACES WITH GYPSUM BOARD PANELS | |||||||||||||||||
| 24 | C/W GYPSUM ADHESIVE | SM | 25.00 | ||||||||||||||
| 25 | PROVIDE&APPLY GYPSUM SATIN PLASTER AND GYPSUM PRIMER ON INTERIOR WALL SURFACES | SM | 200.00 | ||||||||||||||
| 26 | MOVE FURNITURE AND EQUIPMENT AS REQUIRED | SM | 1,200.00 | ||||||||||||||
| TOTAL OF INTERIOR PAINT | |||||||||||||||||
| GRAND TOTAL (SECOND OPTIONAL YEAR) | |||||||||||||||||
| (Computer Generated AF Form 3052., AUG 93) |