JA-2_AF_Form_66.pdf

Air Force Form PDF 79 KB Posted

Attached to
Pump House Supports Repair
Solicitation number
FA5004-18-B-C008
Issued by

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

File Type Posted
Q_and_A_pump_house.pdf PDF
JA-1_Specifications.pdf PDF
JA-3_Site_Plan.pdf PDF
JA-4_Wage_Determination.pdf PDF
FA500418BC008.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. GPO 1987-188-148

PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

SCHEDULE OF MATERIAL SUBMITTALS FTQW 18-1009

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

ER

'S

W A

R R

A N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

SE

R

VI

C

E / S

IZ

E

/ U

SE

S C

H

ED

U

LE

O

TH

ER

REQUIRED

SUB-

MISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CONTRACTOR

RESUBMITTAL FINAL APPROVAL REMARKS

APPROVED DIS-

APPROVED

01010 - DESCRIPTION OF WORK

AND COORDINATION

1 Work Clearance Request (AF Form 103), 01010-1.6, A 3 Prior to work start

2 Notification of Commencement of Work, 01010-1.6,B 3 7 days prior to work start

01030 - SAFETY, ENVIRONMENTAL

PROTECTION, REGULATIONS, AND

CODES

3 Construction Operation and Safety Plan, 01030-1.7 3 30 days prior to work start

4 Request for use of Ionizing Radiation (if required), 01030-1.10 3 30 days prior to need For Information Only. Submit only if applicable.

5 Request for use of Lasers (if required), 01030-1.11 3 30 days prior to need For Information Only. Submit only if applicable.

6 Request for use of Radioactive Materials (if required), 01030-1.12 3 30 days prior to need For Information Only. Submit only if applicable.

7 Request for use of Radio Frequency radiation (if required),01030-1.13 3 30 days prior to need For Information Only. Submit only if applicable.

8 Request for use of Ultraviolet Radiation (if required), 01030-1.14 3 30 days prior to need For Information Only. Submit only if applicable.

9 Environmental Protection Plan, 01030-

1.19 3 4 wks prior to work start

10 Hazardous Materials Inventory (Initial, quarterly & final), 01030-1.20 3

With Environ'l Protection Plan & Quarterly

11 Hazardous Waste Accumulation Log (Initial, quarterly, & final), 01030-1.21.C 3

With Environ'l Protection Plan & Quarterly

12 Hazardous Waste TCLP test results, 01030-1.22 3

Prior to disposal of Haz Waste

01080 - EXISTING UTILITIES

13 Approval for utility interruptions, 01080-

1.3, A. 4 7 days prior to interruption

Repair CH&PP Pump House Supports

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

Page 1 of 3 5/5/2018

SCHEDULE OF MATERIAL SUBMITTALS FTQW 18-1009

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

ER

'S

W A

R R

A N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

SE

R

VI

C

E / S

IZ

E

/ U

SE

S C

H

ED

U

LE

O

TH

ER

REQUIRED

SUB-

MISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CONTRACTOR

RESUBMITTAL FINAL APPROVAL REMARKS

APPROVED DIS-

APPROVED

Repair CH&PP Pump House Supports

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

01400 - QUALITY CONTROL

14 Testing Laboratory & Qualifications, 01400-1.3, A - E 3 4 wks prior to work start

15 Construction Photographs, 01400-1.7, F & G 3

Since previous Application for Payment

16 Testing Lab Services, 01400-1.8, D.5 3 w/in 72 hrs of test

01700 - CONTRACT CLOSEOUT

17 As-Built Records, 01700-1.4, F 2 Prior to final inspection 18 Final As-Built Dwgs, 01700-1.4.I 2 Prior to Final

Payment 19 O&M Manuals, 01700-1.5

3 3 3 7 days prior to final inspection

20 Warranties, 01700-1.6 3 Prior to final payment

024100 - DEMOLITION

21 Demolition Plan, 24100-1.2.A and

1.5.A.2 3 4 wks prior to work start

Coordinate with Environmental Protection Plan.

22 Existing Conditions, 24100-1.5.A.1 and 1.8.A 3 4 wks prior to work start

Page 2 of 3 5/5/2018

SCHEDULE OF MATERIAL SUBMITTALS FTQW 18-1009

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

ER

'S

W A

R R

A N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

SE

R

VI

C

E / S

IZ

E

/ U

SE

S C

H

ED

U

LE

O

TH

ER

REQUIRED

SUB-

MISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CONTRACTOR

RESUBMITTAL FINAL APPROVAL REMARKS

APPROVED DIS-

APPROVED

Repair CH&PP Pump House Supports

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

033053 - MISCELLANEOUS CAST-IN-

PLACE CONCRETE

23 Aggregates, 033053-2.1.A.2 3 14 days prior to placing

24 Air Entraining Admixtures, 033053- 2.1.3.a 3 14 days prior to placing

25 Water-Reducing or Retarding Admixtures, 033053-2.1.3.b 3 14 days prior to placing

26 Curing Materials, 033053-2.1.8 3 14 days prior to placing

27 Batching and Mixing Equipment, 033053-3.1.2.c 3 14 days prior to placing

28 Conveying and Placing Concrete, 033053-3.2.A 3 14 days prior to placing

29 Formwork, 033053-2.1.6 and 3.7 3 14 days prior to constructing

30 Forms, 033053-2.4 3 14 days prior to constructing

31 Ready-Mix Concrete, 033053-1.3.A.3 and 2.2 3 14 days prior to ordering

32 Mix Design Data, 033053-2.2.A 3 14 days prior to ordering

35 Epoxy, 033053-2.6 3 14 days prior to ordering

36 Tests at time of placement, 033053- 3.6.B.1 & 2 and 3.9.C, D & E 3 w/in 3 days after test

7-Day tests, 033053-3.6.B.3 and 3.9.B 3 w/in 3 days after break

38 28-day tests, 033053-3.6.B.3 and 3.9.B 3 w/in 3 days after break

Page 3 of 3 5/5/2018