JA-2_AF_Form_66.pdf
PDF 79 KB Posted
- Attached to
- Pump House Supports Repair Federal contract opportunity
- Solicitation number
- FA5004-18-B-C008
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q_and_A_pump_house.pdf | ||
| JA-3_Site_Plan.pdf | ||
| JA-4_Wage_Determination.pdf | ||
| FA500418BC008.pdf | ||
| JA-1_Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. GPO 1987-188-148
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
SCHEDULE OF MATERIAL SUBMITTALS FTQW 18-1009
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C A
TI
O
N O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
ER
'S
W A
R R
A N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
SE
R
VI
C
E / S
IZ
E
/ U
SE
S C
H
ED
U
LE
O
TH
ER
REQUIRED
SUB-
MISSION
DATE
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
RETURN
SUSPENSE
DATE
FOLLOW-UP
DATE
CONTRACTOR
NOTIFIED
CONTRACTOR
RESUBMITTAL FINAL APPROVAL REMARKS
APPROVED DIS-
APPROVED
01010 - DESCRIPTION OF WORK
AND COORDINATION
1 Work Clearance Request (AF Form 103), 01010-1.6, A 3 Prior to work start
2 Notification of Commencement of Work, 01010-1.6,B 3 7 days prior to work start
01030 - SAFETY, ENVIRONMENTAL
PROTECTION, REGULATIONS, AND
CODES
3 Construction Operation and Safety Plan, 01030-1.7 3 30 days prior to work start
4 Request for use of Ionizing Radiation (if required), 01030-1.10 3 30 days prior to need For Information Only. Submit only if applicable.
5 Request for use of Lasers (if required), 01030-1.11 3 30 days prior to need For Information Only. Submit only if applicable.
6 Request for use of Radioactive Materials (if required), 01030-1.12 3 30 days prior to need For Information Only. Submit only if applicable.
7 Request for use of Radio Frequency radiation (if required),01030-1.13 3 30 days prior to need For Information Only. Submit only if applicable.
8 Request for use of Ultraviolet Radiation (if required), 01030-1.14 3 30 days prior to need For Information Only. Submit only if applicable.
9 Environmental Protection Plan, 01030-
1.19 3 4 wks prior to work start
10 Hazardous Materials Inventory (Initial, quarterly & final), 01030-1.20 3
With Environ'l Protection Plan & Quarterly
11 Hazardous Waste Accumulation Log (Initial, quarterly, & final), 01030-1.21.C 3
With Environ'l Protection Plan & Quarterly
12 Hazardous Waste TCLP test results, 01030-1.22 3
Prior to disposal of Haz Waste
01080 - EXISTING UTILITIES
13 Approval for utility interruptions, 01080-
1.3, A. 4 7 days prior to interruption
Repair CH&PP Pump House Supports
M A
N U
FA
C
TU
R
E' S
R
EC
O M
M
EN
D A
TI
O
N S
Page 1 of 3 5/5/2018
SCHEDULE OF MATERIAL SUBMITTALS FTQW 18-1009
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C A
TI
O
N O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
ER
'S
W A
R R
A N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
SE
R
VI
C
E / S
IZ
E
/ U
SE
S C
H
ED
U
LE
O
TH
ER
REQUIRED
SUB-
MISSION
DATE
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
RETURN
SUSPENSE
DATE
FOLLOW-UP
DATE
CONTRACTOR
NOTIFIED
CONTRACTOR
RESUBMITTAL FINAL APPROVAL REMARKS
APPROVED DIS-
APPROVED
Repair CH&PP Pump House Supports
M A
N U
FA
C
TU
R
E' S
R
EC
O M
M
EN
D A
TI
O
N S
01400 - QUALITY CONTROL
14 Testing Laboratory & Qualifications, 01400-1.3, A - E 3 4 wks prior to work start
15 Construction Photographs, 01400-1.7, F & G 3
Since previous Application for Payment
16 Testing Lab Services, 01400-1.8, D.5 3 w/in 72 hrs of test
01700 - CONTRACT CLOSEOUT
17 As-Built Records, 01700-1.4, F 2 Prior to final inspection 18 Final As-Built Dwgs, 01700-1.4.I 2 Prior to Final
Payment 19 O&M Manuals, 01700-1.5
3 3 3 7 days prior to final inspection
20 Warranties, 01700-1.6 3 Prior to final payment
024100 - DEMOLITION
21 Demolition Plan, 24100-1.2.A and
1.5.A.2 3 4 wks prior to work start
Coordinate with Environmental Protection Plan.
22 Existing Conditions, 24100-1.5.A.1 and 1.8.A 3 4 wks prior to work start
Page 2 of 3 5/5/2018
SCHEDULE OF MATERIAL SUBMITTALS FTQW 18-1009
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C A
TI
O
N O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
ER
'S
W A
R R
A N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
SE
R
VI
C
E / S
IZ
E
/ U
SE
S C
H
ED
U
LE
O
TH
ER
REQUIRED
SUB-
MISSION
DATE
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
RETURN
SUSPENSE
DATE
FOLLOW-UP
DATE
CONTRACTOR
NOTIFIED
CONTRACTOR
RESUBMITTAL FINAL APPROVAL REMARKS
APPROVED DIS-
APPROVED
Repair CH&PP Pump House Supports
M A
N U
FA
C
TU
R
E' S
R
EC
O M
M
EN
D A
TI
O
N S
033053 - MISCELLANEOUS CAST-IN-
PLACE CONCRETE
23 Aggregates, 033053-2.1.A.2 3 14 days prior to placing
24 Air Entraining Admixtures, 033053- 2.1.3.a 3 14 days prior to placing
25 Water-Reducing or Retarding Admixtures, 033053-2.1.3.b 3 14 days prior to placing
26 Curing Materials, 033053-2.1.8 3 14 days prior to placing
27 Batching and Mixing Equipment, 033053-3.1.2.c 3 14 days prior to placing
28 Conveying and Placing Concrete, 033053-3.2.A 3 14 days prior to placing
29 Formwork, 033053-2.1.6 and 3.7 3 14 days prior to constructing
30 Forms, 033053-2.4 3 14 days prior to constructing
31 Ready-Mix Concrete, 033053-1.3.A.3 and 2.2 3 14 days prior to ordering
32 Mix Design Data, 033053-2.2.A 3 14 days prior to ordering
35 Epoxy, 033053-2.6 3 14 days prior to ordering
36 Tests at time of placement, 033053- 3.6.B.1 & 2 and 3.9.C, D & E 3 w/in 3 days after test
7-Day tests, 033053-3.6.B.3 and 3.9.B 3 w/in 3 days after break
38 28-day tests, 033053-3.6.B.3 and 3.9.B 3 w/in 3 days after break
Page 3 of 3 5/5/2018