JA-3_AF_Form_66.pdf
Air Force Form PDF 13 KB Posted
- Solicitation number
- FA5004-18-B-C007
About this file
JA-3 AF Form 66
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
| File | Type | Posted |
|---|---|---|
| FA500418CC0007_Q&A.pdf | ||
| FA5004-18-B-C007-U0001.pdf | ||
| JA-2_Specifications_v3.pdf | ||
| JA-3_AF_Form_66.pdf | ||
| JA-1_SOW.pdf | ||
| JA-4_Site_Plan.pdf | ||
| JA-1_SOW.pdf | ||
| JA-5_Wage_Determination.pdf | ||
| FA500418BC007.pdf | ||
| JA-6_As_Builts.pdf | ||
| JA-2_Specifications_v2.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT NO.
MATERIAL SUBMITTALS
KEY: 1 SC -1 WEEK PRIOR TO SUBSTANTIAL COMPLETION INSPECTION 2 CM -2 WEEKS PRIOR TO COMMISSIONING 4 15 -4 WEEKS PRIOR TO ORDERING MATS/EQUIP FOR DIVISION 15 4 SC -4 WEEKS PRIOR TO SUBSTANTIAL COMPLETION INSPECTION 4 CM -4 WEEKS PRIOR TO COMMISSIONING 4 M -4 WEEKS PRIOR TO ORDERING MATS/EQUIP FOR SPEC SECTION
PR -4 WEEKS PRIOR TO CONSTRUCTION ACTIVITY
ED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C A
TI
O
N O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TR
'S
R
EC
O M
M
EN
D A
TI
O
N S
M A
N U
FA
C
TU
R
ER
'S
W A
R R
A N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
SE
R
VI
C
E / S
IZ
E
/ U
SE
S C
H
ED
U
LE
O
TH
ER
REQUIRED
SUB-
MISSION
DATE
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
RETURN
SUSPENSE
DATE
FOLLOW-UP
DATE
CONTRACTOR
NOTIFIED
CONTRAC-
TOR RE-
SUBMIT-
TAL
FINAL APPROVAL REMARKS
APPROV
ED
DIS-
APPROV
ED
Spec. 01 14 00
1 Construction Operations and Safety Plan - 1.4 and 1.7 2 4 wks prior to work
2 Accident Prevent Plan - 1.4 and
1.8 2 4 wks prior to work
Safety and Health Plan - 1.8
2 4 wks prior to work
Request for use of Ionizing Radiation (if required) - 1.4 and 1.11
3 4 wks prior to work
5 Request for use of Lasers (if required) - 1.12 4 4 wks prior to work
6 9. Environmental Protection Plan - 1.4 and 1.21 4 4 wks prior to work
7 Hazardous Waste Accumulation Log (Initial, quarterly & final) - 1.23
4 4 wks prior to work
Spec. 01 01 00
8 AF Form 103 01 01 00 1.11 3 2 wks prior to work start Spec. 01 40 00
9 Testing laboratory Information-
1.8 3
2 wks prior to ordering materials
Spec. 01 70 00
10 Construction Photos -1.4 3
Within 10 days of Construction Completion (Before Final Payment)
11 As-built Drawings - 1.4 3
Within 10 days of Construction Completion (Before Final Payment)
12 Operation and Maintenace Data -1.5 3
Within 10 days of Construction Completion (Before Final Payment)
FTQW 18-1018 Replace B3446 Roof
SOLICITATION/CONTRACT NO.
MATERIAL SUBMITTALS
KEY: 1 SC -1 WEEK PRIOR TO SUBSTANTIAL COMPLETION INSPECTION 2 CM -2 WEEKS PRIOR TO COMMISSIONING 4 15 -4 WEEKS PRIOR TO ORDERING MATS/EQUIP FOR DIVISION 15 4 SC -4 WEEKS PRIOR TO SUBSTANTIAL COMPLETION INSPECTION 4 CM -4 WEEKS PRIOR TO COMMISSIONING 4 M -4 WEEKS PRIOR TO ORDERING MATS/EQUIP FOR SPEC SECTION
PR -4 WEEKS PRIOR TO CONSTRUCTION ACTIVITY
ED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C A
TI
O
N O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TR
'S
R
EC
O M
M
EN
D A
TI
O
N S
M A
N U
FA
C
TU
R
ER
'S
W A
R R
A N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
SE
R
VI
C
E / S
IZ
E
/ U
SE
S C
H
ED
U
LE
O
TH
ER
REQUIRED
SUB-
MISSION
DATE
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
RETURN
SUSPENSE
DATE
FOLLOW-UP
DATE
CONTRACTOR
NOTIFIED
CONTRAC-
TOR RE-
SUBMIT-
TAL
FINAL APPROVAL REMARKS
APPROV
ED
DIS-
APPROV
ED
FTQW 18-1018 Replace B3446 Roof
13 Warranties - 1.6 3
Within 10 days of Construction Completion (Before Final Payment)
Spec. 07 54 19
14 PVC Prefabricated Deck Sheets
- 1.4 B., F. and 2.2 3 3 4 wks prior to work
15 Fiberglass Faced Roof Board -
1.4 B., F. and 2.4 3 3 4 wks prior to
work
16 Polyisocyanurate (Insulation) -
1.4 B., F. and 2.3 3 3 4 wks prior to
work
17 Vapor Barrier Membrane- 1.4 B., F. and 2.2 3 3 4 wks prior to work
18 Roof System Flashing - 1.4 B., F. and 2.2 3 3 4 wks prior to work
19 Sustainability Documentation -
1.4 C. 3 4 wks prior to
work
20 Wind Uplift Calculations - 1.4 D. 3 4 wks prior to work
21 Shop Drawings- 1.4 E. 3 4 wks prior to work
22 Installer Certification - 1.4 G. 3 4 wks prior to work
23 Manufacturer's Warranty - 1.4 H. and 1.9 3 Prior to Final
Payment Spec. 07 65 00
24 Metal Flashing - 1.3 3 3 3 4 wks prior to work