FA500418CC0007_Q&A.pdf

PDF 107 KB Posted

Attached to
Roof Repair Bldg 3446- FTQW18-1018 - FA5004-18-B-C007
Solicitation number
FA5004-18-B-C007
Issued by

About this file

Questions and Answers for FA500418CC007

View the file

Other files

File Type Posted
FA5004-18-B-C007-U0001.pdf PDF
JA-2_Specifications_v3.pdf PDF
JA-3_AF_Form_66.pdf PDF
JA-1_SOW.pdf PDF
JA-4_Site_Plan.pdf PDF
JA-3_AF_Form_66.pdf PDF
JA-1_SOW.pdf PDF
JA-5_Wage_Determination.pdf PDF
FA500418BC007.pdf PDF
JA-6_As_Builts.pdf PDF
JA-2_Specifications_v2.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROOF REPAIR BLDG 3446

EIELSON AFB, ALASKA

FTQW 18-0018

Questions and Answers

Questions and Answers

Q1. Can you please tell me what the warranty requirements are for solicitation number FA5004‐18‐B‐ C007?

A1. See SOW, para 2.13. – 354 CES

Q2. Can you please give us more information on the expansion joint requirements?

A2. See Specifications 07 65 00, section 10. – 354 CES

Q3. Will you also allow R 38 EPS Roof insulation meeting ASTM C 578 Type II? Type II EPS (attached) is frequently used in roof systems like this.

A3. Material must meet the requirements outlines in the specifications. See Specifications 07

54 19, para 2.3. – 354 CES

Q4. As far as questions about the existing building, per para 2.2 of the SOW, can you indicate on the as built roof plan which items need to be removed and have the deck capped / welded.

A4. None will need to be capped/welded. – 354 CES

Q5. Are these the performance specifications for the adhered PVC Roofing?

A5. Roof must be installed as specified in SOW, para 2.3. – 354 CES