JA-1_SOW.pdf

PDF 17 KB Posted

Attached to
Roof Repair Bldg 3446- FTQW18-1018 - FA5004-18-B-C007
Solicitation number
FA5004-18-B-C007
Issued by

About this file

JA-1 Statement of Work

View the file

Other files

File Type Posted
FA500418CC0007_Q&A.pdf PDF
FA5004-18-B-C007-U0001.pdf PDF
JA-2_Specifications_v3.pdf PDF
JA-3_AF_Form_66.pdf PDF
JA-1_SOW.pdf PDF
JA-4_Site_Plan.pdf PDF
JA-3_AF_Form_66.pdf PDF
JA-5_Wage_Determination.pdf PDF
FA500418BC007.pdf PDF
JA-6_As_Builts.pdf PDF
JA-2_Specifications_v2.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

PROJECT FTQW 18-1018

REPLACE IRMA ROOF SYSTEM WITH PVC ROOF SYSTEM (3446) SOW

1.0 SCOPE: Furnish all plant, labor, supplies, parts, transportation, tools, equipment, and facilities necessary to perform work required to complete project FTQW 18-1018 in strict accordance with this Statement of Work and the Specifications. All work shall be warranted as indicated in this statement of work and in accordance to the specifications.

2.0 DESCRIPTION OF WORK: Repair the entire roof of Bldg 3446 by replacement. The roof system shall be installed in accordance with manufacturers' recommendations and the attached specifications.

2.1 Remove the existing 12,900 SF IRMA roof system, including insulation. Remove all flashing.

2.2 Seal all abandoned pipes, duct work, and other penetrations. Seal off flush with the deck using the same material as the current decking system. Patches to metal decking must be welded. Coordinate with Base Mechanical Shops for proper location determinations. Follow the manufacturer’s requirements. Any disturbed fire proofing coating must be replaced with an equal substitute. Coordinate with base Fire Department for acceptable replacement.

2.3 Install 12,900 SF 60 mil PVC system insulated to R38 in accordance with manufacturer's recommendations and the specifications.

2.4 Install tapered insulation for PVC roof system to provide proper drainage into newly installed drains according to manufacturer's recommendations and the specifications.

2.5 Install two layers 12,900 SF (1/2” and 1/4”) gypsheeting thermal barrier in accordance with manufacturer’s recommendations and the specifications.

2.6 Install new 1,150 SF flashing and expansion joints. Flashings shall be chosen and installed to withstand wind gusts in accordance with manufacturer’s recommendations and the specifications. Roof flashing color must match existing flashing material. Install manufactured flashing for vents though roof (VTRs) in accordance with manufacturer’s recommendations and the specifications.

2.7 Install 12,900 SF FFP 31.5 mil minimum vapor barrier in accordance with manufacturer’s recommendations and the specifications.

2.8 Install 6 new roof drains with 2-4” drain extensions and install flashing for drains in accordance to manufacturer’s recommendations and the specifications.

2.9 Install permanent guardrail on parapet edge next to roof access entry per OSHA requirements.

2.10 Apply safety walk pads on roof around scuttle per manufacturer’s specifications.

2.11 Install roof warranty signs on exterior of building near roof access points.

2.11.1 Post a 12" x 12" x 1/8" brown sign with white lettering at any and all access points to the roof. These signs will be posted at or near eye level on the nearest vertical surfaces to the access points to the roof and will read as follows:

a) THIS ROOF IS UNDER WARRANTY UNTIL EXPIRATION DATE:

[expiration date of warranty] DO NOT PENETRATE THIS ROOF- +WITHOUT NOTIFYING 354 CES Roofing Engineer, 377-2100

2.11.2 Contractor shall repair any damage they cause to the building or site at no extra cost to the Government.

2.12 Provide all work plans, labor, material, equipment, supervision, work and facilities necessary to sample, analyze, abate, and dispose asbestos containing material (ACM) if encountered (to protect workers), certify, report and coordinate with ADEC in accordance with the Work Narrative and Contract. This ITEM shall be paid only if ACM is encountered and must be abated and shall be paid per unit square feet (total not to exceed 130 SF).

2.13 Roof system shall be warrantied as required in the specifications.

3.0 SUBMITTALS: Documents shall be submitted according to the attached AF Form 66.

4.0 GOVERNMENT FURNISHED MATERIALS: None.

5.0 ATTACHMENTS:

5.1 Specifications

28 February 2018

END OF STATMENT