JA-6 AF Form 66.xls
Air Force Form XLS spreadsheet 46 KB Posted
- Solicitation number
- FA5004-09-R-C012
About this file
Air Force Form 66
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0004.pdf | ||
| JA-2 Wage Determination.pdf | ||
| Amendment 0003.pdf | ||
| Questions and Responses 002.pdf | ||
| SOW for Gen 4.doc | DOC document | |
| 19 07-1054_Appendix 4 Foundation Drwng.TIF | TIF image | |
| Amendment 0002.pdf | ||
| Questions and Responses 001.pdf | ||
| Amendment 0001.pdf | ||
| SOW for Gen 4.doc | DOC document | |
| Photos.pdf | ||
| O M Manual Excerpts.pdf | ||
| 09-R-C012 Final.pdf | ||
| JA-2 Wage Determination.doc | DOC document | |
| JA-3 Past Performance Questionaire - 2.doc | DOC document | |
| 2003-2004 Overhaul Report.pdf | ||
| JA-5 Haz Mat Sheet.doc | DOC document | |
| JA-4 Financial Reference Sheet.doc | DOC document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EAFB
| PROJECT NUMBER | PROJECT TITLE | MAINTAIN TURBINE- | SOLICITATION/CONTRACT NO. | ||||
| SCHEDULE OF MATERIAL SUBMITTALS | FTQW 02-1001 | GENERATOR #4 | |||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||
| NO. OF COPIES REQUIRED | |||||||
| LINE NUMBER | ITEM OR DESCRIPTION |
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL CERTIFICATION OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION MANUFACTURER'S RECOMMENDATIONS MANUFACTURER'S WARRANTY CATALOG DATA OPERATING INSTRUCTIONS SERVICE / SIZE / APPLICATION SCHEDULE OTHER REQUIRED
SUB-
MISSION
DATE DATE
RECEIVED
IN CON-
TRACTING DATE TO
CIVIL
ENGINEER-
ING RETURN
SUSPENSE
DATE FOLLOW-UP DATE
CONTRACTOR
NOTIFIED CONTRAC-
TOR RE-
SUBMIT-
| TAL | FINAL APPROVAL | REMARKS | ||
| APPROVED | DIS- |
APPROVED
| 1 | 01010-1.6.A. Work Clearnace Request, AF Form 103 | 4 | 5 days after NTP | |||||||
| 2 | 01030-1.8, Safety & Health Plan | 4 | 4 weeks prior to work start | |||||||
| 3 | 01030-1.10, Ionizing Radiation Permit Request | 4 | 4 weeks prior to need | For Information Only. Submit only if applicable | ||||||
| 4 | 01030-1.11, Laser Permit Request | 4 | 4 weeks prior to need | For Information Only. Submit only if applicable | ||||||
| 5 | 01030-1.12, Radioactive materials Permit Request | 4 | 4 weeks prior to need | For Information Only. Submit only if applicable | ||||||
| 6 | 01030-1.13, Radiofrequency Radiation permit Request | 4 | 4 weeks prior to need | For Information Only. Submit only if applicable | ||||||
| 7 | 01030-1.14, Ultraviolet Radiation Permit Request | 4 | 4 weeks prior to need | For Information Only. Submit only if applicable | ||||||
| 8 | 01030-1.17.B, Initial Hazardous Material Inventory | 4 | 4 wks prior to work start | |||||||
| 9 | 01030-1.17.B, Final Hazardous Material Inventory & MSDSs | 4 | 1 wk after completion of on-site work | |||||||
| 10 | 01030-1.18, Environmental Protection Plan | 4 | 4 wks prior to work start | |||||||
| 11 | 01030-1.19, TCLP Test Results | 4 | Prior to disposing Haz Waste | |||||||
| 12 | 01400-1.3, Testing Lab Qualifications | 4 | 4 wks prior to testing | |||||||
| 13 | 01400-1.7, Construction Photographs | 4 | Submit w/ each Progress Report | |||||||
| 14 | 01400-1.8.D., Test Reports | 4 | 1 wk after completion of test | |||||||
| 15 | 15699-1.02.A. & 3.01 Tech. Rep. Qualifications | 4 | 7 days after NTP | |||||||
| 16 | 15699-1.02.B. & 3.04.OO., NDI Test Lab & Worker Qualifications | 4 | 7 days after NTP | |||||||
| 17 | 15699-1.02.C. & 3.04. O. Coupling | 4 | 4 | 4 | 4 | 7 days after NTP | ||||
| 18 | 15699-1.02.D & 3.04.X., Hot Well Pumps | 4 | 4 | 4 | 4 | 4 | 4 | 7 days after NTP | ||
| 19 | 15699-1.02.E & 3.04.FF., Hot Well Level Controls | 4 | 4 | 4 | 4 | 4 | 4 | 7 days after NTP | ||
| 20 | 15699-1.02.F & 3.04.GG., Air Ejector Nozzles | 4 | 4 | 4 | 4 | 7 days after NTP | ||||
| 21 | 15699-1.02.G. & 3.04.HH., Steam Seal System | 4 | 4 | 4 | 4 | 4 | 4 | 7 days after NTP | ||
| 22 | 15699-1.02.H. & 3.04.BB, Oil Cooler Control System | 4 | 4 | 4 | 4 | 4 | 4 | 7 days after NTP | ||
| 23 | 15699-1.02.I. & 3.04.DD, Oil Solenoid Dump Valve & Actuator | 4 | 4 | 4 | 4 | 4 | 7 days after NTP | |||
| 24 | 15699-1.02.J. & 3.04.NN., Generator Air Cooler Temperature Controls | 4 | 4 | 4 | 4 | 4 | 4 | 7 days after NTP | ||
| 25 | 15699-1.02.K. & 3.04.UU., Reusable Blanket Insulation | 4 | 4 | 4 | 4 | 4 | 4 | 7 days after NTP | ||
| 26 | 15699-1.02.L., Isolation & Bypass Valves | 4 | 4 | 4 | 7 days after NTP | |||||
| 27 | 15699-1.02.M. & 3.04.PP, LRRs (Letters of Recommended Repairs) | 4 | 5 days after inspections | Submit as necessary. | ||||||
| 28 | 15699-1.02.N & 3.04.VV, Start-up Plan | 4 | 7 days after NTP | |||||||
| 29 | 15699-1.02.O. & 3.06. Post-Overhaul Report | 4 | 14 days after final acceptance test | |||||||
| 30 | 15699-1.02.P., Proposed Deviations | 4 | 4 | 4 | 4 | 4 | 4 | 4 | When deviations are requested | Submit only if applicable. |
| 31 | 15699-1.02.D., E., G., H., J,, O&M Manuals | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 14 days after final acceptance test | |
| 32 | 15699-1.02.E., G., H., J., As-built drawings | 4 | 14 days after final acceptance test | |||||||
| 4 | 4 | |||||||||
| 4 | 4 | |||||||||
| 4 | ||||||||||
| 4 | 4 | |||||||||
| 4 | ||||||||||
| 4 | 4 | |||||||||
| 4 | ||||||||||
| 4 | ||||||||||
| 4 | ||||||||||
| 4 | 4 | |||||||||
| 4 | 4 | |||||||||
| 4 | ||||||||||
| 4 | ||||||||||
| 4 | ||||||||||
| 4 | ||||||||||
| 4 |