This document is a schedule of materials submittals for the Repair Floor MWD Kennel B4917 project solicited by the Department of the Air Force Pacific Air Forces under solicitation number FA500023R0019. The schedule requires the submission of 14 different items including a project-specific AF Form 66, health and safety plan, construction schedule, daily reports, and product data sheets for floor coatings, anti-slip materials, concrete patching materials, and concrete paint within timeframes ranging from 7 to 21 days after notice to proceed. As-built drawings must be submitted within 30 days of final inspection. The schedule includes submission due dates, receipt acknowledgement dates, review periods by the civil engineering office, potential follow up dates, and spaces for remarks.

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIALS SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT PREFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C

A

TI

O N

O F

C O

M

PL

IA

N

C E

D R

A W

IN

G

S

PL

A

N

M

SD

S

M A

N F'

R R

EC

O

M M

EN

D

A

TI

O N

S

R

EQ

U

ES

T

LE

TT

ER

C A

TA

LO

G D

A

TA

R

EP

O R

TS

O

TH

ER

D

A

TA

TE

ST

R

ES

U

LT

S

REQUIRED

SUBMISSION DATE

DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE DATE

FOLLOW-UP

DATE CONTRACTOR

NOTIFIED

CONTRACTOR RE-

SUBMITTAL FINAL APPROVAL REMARKS

1 Project Specific Form 66 1 14 days after NTP

2 Notice to Start Work 1 21 days prior to start of work

3 Health and Safety Plan 1 15 days after NTP

4 Environment Protection Plan 1 15 days after NTP

5 Spill Protection Plan 1 15 days after NTP

6 QA/QC Plan 1 20 days after NTP

7 Construction Schedule, AF Form 3064

7 days after NTP

8 Final Inspection Notice 1 5 days prior to inspection date

As-Built Drawings 1

Complete by 30 days after Final inspection

10 Daily Reports 1 Daily after NTP

11 Floor Coating Product Data 1 1 14 days prior to Start of Work

12 Anti-Slip Material Product Data 1 1 14 days prior to Start of Work

Concrete Patching Material Product Data/Method 1 1 14 days prior to

Start of Work

Concrete Paint and Bonding Agent Product Data 1 1 14 days prior to

Start of Work

Repair Floor MWD Kennel B4917FXSB 23-1001