6. AF Form 66.pdf

PDF 67 KB Posted

Attached to
Repair Floor MWD Kennel B4917 Federal contract opportunity
Solicitation number
FA500023R0019
Issued by
Department of the Air Force Pacific Air Forces

About this file

This document is a schedule of materials submittals for the Repair Floor MWD Kennel B4917 project solicited by the Department of the Air Force Pacific Air Forces under solicitation number FA500023R0019. The schedule requires the submission of 14 different items including a project-specific AF Form 66, health and safety plan, construction schedule, daily reports, and product data sheets for floor coatings, anti-slip materials, concrete patching materials, and concrete paint within timeframes ranging from 7 to 21 days after notice to proceed. As-built drawings must be submitted within 30 days of final inspection. The schedule includes submission due dates, receipt acknowledgement dates, review periods by the civil engineering office, potential follow up dates, and spaces for remarks.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Floor MWD Kennel B4917, newest first.
File Type Posted
Solicitation Amendment FA500023R00190001 SF 30.pdf PDF
DBA Wage Determination AK20230001 23 June 2023.pdf PDF
7. AF Form 66.xlsx XLSX spreadsheet
8. FXSB 23-1001 SOW.pdf PDF
Solicitation - FA500023R0019.pdf PDF
Attachment 6 - Open Market General Specifications_10 Feb 2021.pdf PDF
9. FXSB 23-1001_Drawings.pdf PDF
Attachment 5 - DBA Wage Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIALS SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT PREFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C

A

TI

O N

O F

C O

M

PL

IA

N

C E

D R

A W

IN

G

S

PL

A

N

M

SD

S

M A

N F'

R R

EC

O

M M

EN

D

A

TI

O N

S

R

EQ

U

ES

T

LE

TT

ER

C A

TA

LO

G D

A

TA

R

EP

O R

TS

O

TH

ER

D

A

TA

TE

ST

R

ES

U

LT

S

REQUIRED

SUBMISSION DATE

DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE DATE

FOLLOW-UP

DATE CONTRACTOR

NOTIFIED

CONTRACTOR RE-

SUBMITTAL FINAL APPROVAL REMARKS

1 Project Specific Form 66 1 14 days after NTP

2 Notice to Start Work 1 21 days prior to start of work

3 Health and Safety Plan 1 15 days after NTP

4 Environment Protection Plan 1 15 days after NTP

5 Spill Protection Plan 1 15 days after NTP

6 QA/QC Plan 1 20 days after NTP

7 Construction Schedule, AF Form 3064

7 days after NTP

8 Final Inspection Notice 1 5 days prior to inspection date

As-Built Drawings 1

Complete by 30 days after Final inspection

10 Daily Reports 1 Daily after NTP

11 Floor Coating Product Data 1 1 14 days prior to Start of Work

12 Anti-Slip Material Product Data 1 1 14 days prior to Start of Work

Concrete Patching Material Product Data/Method 1 1 14 days prior to

Start of Work

Concrete Paint and Bonding Agent Product Data 1 1 14 days prior to

Start of Work

Repair Floor MWD Kennel B4917FXSB 23-1001

File details come from the government source that posted it. Updated .