7. AF Form 66.xlsx
XLSX spreadsheet 64 KB Posted
- Attached to
- Repair Floor MWD Kennel B4917 Federal contract opportunity
- Solicitation number
- FA500023R0019
About this file
This document is a schedule of materials submittals for the Repair Floor MWD Kennel B4917 project solicited by the Department of the Air Force Pacific Air Forces. The schedule outlines fourteen required submittals including project plans, safety and environmental plans, construction schedules, inspection notices, daily reports, and product data sheets for floor coatings, anti-slip materials, concrete patching materials, and concrete paint. Submittal dates range from 7 to 21 days after notice to proceed or notice to start work, with as-built drawings due 30 days after final inspection. The solicitation number for the Repair Floor MWD Kennel B4917 project is FA500023R0019.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA500023R00190001 SF 30.pdf | ||
| DBA Wage Determination AK20230001 23 June 2023.pdf | ||
| 6. AF Form 66.pdf | ||
| Solicitation - FA500023R0019.pdf | ||
| Attachment 5 - DBA Wage Determination.pdf | ||
| Attachment 6 - Open Market General Specifications_10 Feb 2021.pdf | ||
| 9. FXSB 23-1001_Drawings.pdf | ||
| 8. FXSB 23-1001 SOW.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF MATERIALS SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L I N E
N U M B E R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT PREFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C
A
TI
O N
O F
C O
M
PL
IA
N
C E
D R
A W
IN
G
S
PL
A
N
M
SD
S
M A
N F'
R R
EC
O
M M
EN
D
A
TI
O N
S
R
EQ
U
ES
T
LE
TT
ER
C A
TA
LO
G D
A
TA
R
EP
O R
TS
O
TH
ER
D
A
TA
TE
ST
R
ES
U
LT
S
REQUIRED
SUBMISSION DATE
DATE RECEIVED IN
CONTRACTING
DATE TO CIVIL
ENGINEERING
RETURN
SUSPENSE DATE
FOLLOW-UP
DATE CONTRACTOR
NOTIFIED
CONTRACTOR RE-
SUBMITTAL FINAL APPROVAL REMARKS
1 Project Specific Form 66 1 14 days after NTP
2 Notice to Start Work 1 21 days prior to start of work
3 Health and Safety Plan 1 15 days after NTP
4 Environment Protection Plan 1 15 days after NTP
5 Spill Protection Plan 1 15 days after NTP
6 QA/QC Plan 1 20 days after NTP
7 Construction Schedule, AF Form 3064
7 days after NTP
8 Final Inspection Notice 1 5 days prior to inspection date
As-Built Drawings 1
Complete by 30 days after Final inspection
10 Daily Reports 1 Daily after NTP
11 Floor Coating Product Data 1 1 14 days prior to Start of Work
12 Anti-Slip Material Product Data 1 1 14 days prior to Start of Work
Concrete Patching Material Product Data/Method 1 1 14 days prior to
Start of Work
Concrete Paint and Bonding Agent Product Data 1 1 14 days prior to
Start of Work
Repair Floor MWD Kennel B4917FXSB 23-1001